2025-08-17 07:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1272 |
megawatthours |
2025-08-17 07:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3435 |
megawatthours |
2025-08-17 07:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
75200 |
megawatthours |
2025-08-17 07:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
396 |
megawatthours |
2025-08-17 07:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
368 |
megawatthours |
2025-08-17 07:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
1952 |
megawatthours |
2025-08-17 07:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
15955 |
megawatthours |
2025-08-17 07:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
5062 |
megawatthours |
2025-08-17 07:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
857 |
megawatthours |
2025-08-17 07:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2425 |
megawatthours |
2025-08-17 07:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1630 |
megawatthours |
2025-08-17 07:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2476 |
megawatthours |
2025-08-17 07:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2127 |
megawatthours |
2025-08-17 07:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
27871 |
megawatthours |
2025-08-17 07:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
5542 |
megawatthours |
2025-08-17 07:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2580 |
megawatthours |
2025-08-17 07:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2322 |
megawatthours |
2025-08-17 07:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
750 |
megawatthours |
2025-08-17 07:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1133 |
megawatthours |
2025-08-17 07:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
272 |
megawatthours |
2025-08-17 07:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
26249 |
megawatthours |
2025-08-17 07:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
165 |
megawatthours |
2025-08-17 07:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
31374 |
megawatthours |
2025-08-17 07:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
5895 |
megawatthours |
2025-08-17 07:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2177 |
megawatthours |
2025-08-17 07:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
4906 |
megawatthours |
2025-08-17 07:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1209 |
megawatthours |
2025-08-17 06:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
96 |
megawatthours |
2025-08-17 06:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1346 |
megawatthours |
2025-08-17 06:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3417 |
megawatthours |
2025-08-17 06:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
91949 |
megawatthours |
2025-08-17 06:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
423 |
megawatthours |
2025-08-17 06:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
404 |
megawatthours |
2025-08-17 06:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2074 |
megawatthours |
2025-08-17 06:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
17052 |
megawatthours |
2025-08-17 06:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
5406 |
megawatthours |
2025-08-17 06:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
905 |
megawatthours |
2025-08-17 06:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2609 |
megawatthours |
2025-08-17 06:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
5137 |
megawatthours |
2025-08-17 06:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1734 |
megawatthours |
2025-08-17 06:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2638 |
megawatthours |
2025-08-17 06:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2276 |
megawatthours |
2025-08-17 06:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
6869 |
megawatthours |
2025-08-17 06:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
41473 |
megawatthours |
2025-08-17 06:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
5882 |
megawatthours |
2025-08-17 06:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2728 |
megawatthours |
2025-08-17 06:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2492 |
megawatthours |
2025-08-17 06:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
763 |
megawatthours |
2025-08-17 06:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1218 |
megawatthours |
2025-08-17 06:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
278 |
megawatthours |
2025-08-17 06:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
27914 |
megawatthours |
2025-08-17 06:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
175 |
megawatthours |
2025-08-17 06:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
33424 |
megawatthours |
2025-08-17 06:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6215 |
megawatthours |
2025-08-17 06:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2378 |
megawatthours |
2025-08-17 06:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
5274 |
megawatthours |
2025-08-17 06:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1298 |
megawatthours |
2025-08-17 05:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
104 |
megawatthours |
2025-08-17 05:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1459 |
megawatthours |
2025-08-17 05:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3621 |
megawatthours |
2025-08-17 05:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
350287 |
megawatthours |
2025-08-17 05:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
21768 |
megawatthours |
2025-08-17 05:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
446 |
megawatthours |
2025-08-17 05:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
438 |
megawatthours |
2025-08-17 05:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
64069 |
megawatthours |
2025-08-17 05:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2230 |
megawatthours |
2025-08-17 05:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
21768 |
megawatthours |
2025-08-17 05:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
45964 |
megawatthours |
2025-08-17 05:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
18278 |
megawatthours |
2025-08-17 05:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
5757 |
megawatthours |
2025-08-17 05:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
28529 |
megawatthours |
2025-08-17 05:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
28529 |
megawatthours |
2025-08-17 05:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
953 |
megawatthours |
2025-08-17 05:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2660 |
megawatthours |
2025-08-17 05:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
5576 |
megawatthours |
2025-08-17 05:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1854 |
megawatthours |
2025-08-17 05:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2762 |
megawatthours |
2025-08-17 05:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2427 |
megawatthours |
2025-08-17 05:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
7334 |
megawatthours |
2025-08-17 05:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
44095 |
megawatthours |
2025-08-17 05:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
6292 |
megawatthours |
2025-08-17 05:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
87750 |
megawatthours |
2025-08-17 05:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
92211 |
megawatthours |
2025-08-17 05:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
4461 |
megawatthours |
2025-08-17 05:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2864 |
megawatthours |
2025-08-17 05:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2728 |
megawatthours |
2025-08-17 05:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
780 |
megawatthours |
2025-08-17 05:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
64069 |
megawatthours |
2025-08-17 05:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1319 |
megawatthours |
2025-08-17 05:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
286 |
megawatthours |
2025-08-17 05:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
29457 |
megawatthours |
2025-08-17 05:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
187 |
megawatthours |
2025-08-17 05:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
45964 |
megawatthours |
2025-08-17 05:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
35373 |
megawatthours |
2025-08-17 05:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6553 |
megawatthours |
2025-08-17 05:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2614 |
megawatthours |
2025-08-17 05:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
5659 |
megawatthours |
2025-08-17 05:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1386 |
megawatthours |
2025-08-17 04:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
118 |
megawatthours |
2025-08-17 04:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1643 |
megawatthours |
2025-08-17 04:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3802 |
megawatthours |
2025-08-17 04:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
564818 |
megawatthours |
2025-08-17 04:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
23193 |
megawatthours |
2025-08-17 04:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
453 |
megawatthours |
2025-08-17 04:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
467 |
megawatthours |
2025-08-17 04:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
67195 |
megawatthours |
2025-08-17 04:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2368 |
megawatthours |
2025-08-17 04:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
23193 |
megawatthours |
2025-08-17 04:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
2942 |
megawatthours |
2025-08-17 04:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
316 |
megawatthours |
2025-08-17 04:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
48233 |
megawatthours |
2025-08-17 04:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
19653 |
megawatthours |
2025-08-17 04:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6061 |
megawatthours |
2025-08-17 04:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
30661 |
megawatthours |
2025-08-17 04:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
247 |
megawatthours |
2025-08-17 04:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
30661 |
megawatthours |
2025-08-17 04:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
961 |
megawatthours |
2025-08-17 04:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3012 |
megawatthours |
2025-08-17 04:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2736 |
megawatthours |
2025-08-17 04:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
5953 |
megawatthours |
2025-08-17 04:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1977 |
megawatthours |
2025-08-17 04:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
101497 |
megawatthours |
2025-08-17 04:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2854 |
megawatthours |
2025-08-17 04:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2534 |
megawatthours |
2025-08-17 04:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
7778 |
megawatthours |
2025-08-17 04:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
20068 |
megawatthours |
2025-08-17 04:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
20068 |
megawatthours |
2025-08-17 04:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
46261 |
megawatthours |
2025-08-17 04:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
6659 |
megawatthours |
2025-08-17 04:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
14070 |
megawatthours |
2025-08-17 04:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
93609 |
megawatthours |
2025-08-17 04:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
98370 |
megawatthours |
2025-08-17 04:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
101497 |
megawatthours |
2025-08-17 04:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
4761 |
megawatthours |
2025-08-17 04:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2973 |
megawatthours |
2025-08-17 04:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1762 |
megawatthours |
2025-08-17 04:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
14070 |
megawatthours |
2025-08-17 04:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2956 |
megawatthours |
2025-08-17 04:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
95 |
megawatthours |
2025-08-17 04:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
207 |
megawatthours |
2025-08-17 04:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
786 |
megawatthours |
2025-08-17 04:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
19863 |
megawatthours |
2025-08-17 04:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
6487 |
megawatthours |
2025-08-17 04:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
2540 |
megawatthours |
2025-08-17 04:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
34459 |
megawatthours |
2025-08-17 04:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
67195 |
megawatthours |
2025-08-17 04:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1422 |
megawatthours |
2025-08-17 04:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
13474 |
megawatthours |
2025-08-17 04:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
293 |
megawatthours |
2025-08-17 04:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
501 |
megawatthours |
2025-08-17 04:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
7550 |
megawatthours |
2025-08-17 04:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
30347 |
megawatthours |
2025-08-17 04:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
194 |
megawatthours |
2025-08-17 04:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
48233 |
megawatthours |
2025-08-17 04:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
24537 |
megawatthours |
2025-08-17 04:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
36621 |
megawatthours |
2025-08-17 04:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6728 |
megawatthours |
2025-08-17 04:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2834 |
megawatthours |
2025-08-17 04:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6182 |
megawatthours |
2025-08-17 04:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1456 |
megawatthours |
2025-08-17 03:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
116 |
megawatthours |
2025-08-17 03:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1726 |
megawatthours |
2025-08-17 03:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3949 |
megawatthours |
2025-08-17 03:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
596211 |
megawatthours |
2025-08-17 03:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
24986 |
megawatthours |
2025-08-17 03:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
463 |
megawatthours |
2025-08-17 03:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
490 |
megawatthours |
2025-08-17 03:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
70060 |
megawatthours |
2025-08-17 03:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2484 |
megawatthours |
2025-08-17 03:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
24986 |
megawatthours |
2025-08-17 03:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
3229 |
megawatthours |
2025-08-17 03:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
342 |
megawatthours |
2025-08-17 03:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
50364 |
megawatthours |
2025-08-17 03:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
20649 |
megawatthours |
2025-08-17 03:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6274 |
megawatthours |
2025-08-17 03:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
32548 |
megawatthours |
2025-08-17 03:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
275 |
megawatthours |
2025-08-17 03:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
32548 |
megawatthours |
2025-08-17 03:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
957 |
megawatthours |
2025-08-17 03:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3244 |
megawatthours |
2025-08-17 03:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2697 |
megawatthours |
2025-08-17 03:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
6224 |
megawatthours |
2025-08-17 03:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
2076 |
megawatthours |
2025-08-17 03:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
107700 |
megawatthours |
2025-08-17 03:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2895 |
megawatthours |
2025-08-17 03:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2614 |
megawatthours |
2025-08-17 03:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
8069 |
megawatthours |
2025-08-17 03:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
21263 |
megawatthours |
2025-08-17 03:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
21263 |
megawatthours |
2025-08-17 03:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
47766 |
megawatthours |
2025-08-17 03:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
7024 |
megawatthours |
2025-08-17 03:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
15160 |
megawatthours |
2025-08-17 03:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
99619 |
megawatthours |
2025-08-17 03:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
104741 |
megawatthours |
2025-08-17 03:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
107700 |
megawatthours |
2025-08-17 03:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
5122 |
megawatthours |
2025-08-17 03:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3045 |
megawatthours |
2025-08-17 03:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1896 |
megawatthours |
2025-08-17 03:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
15160 |
megawatthours |
2025-08-17 03:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3130 |
megawatthours |
2025-08-17 03:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
103 |
megawatthours |
2025-08-17 03:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
218 |
megawatthours |
2025-08-17 03:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
800 |
megawatthours |
2025-08-17 03:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
21114 |
megawatthours |
2025-08-17 03:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
7046 |
megawatthours |
2025-08-17 03:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
2730 |
megawatthours |
2025-08-17 03:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
36953 |
megawatthours |
2025-08-17 03:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
70060 |
megawatthours |
2025-08-17 03:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1506 |
megawatthours |
2025-08-17 03:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
14642 |
megawatthours |
2025-08-17 03:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
300 |
megawatthours |
2025-08-17 03:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
550 |
megawatthours |
2025-08-17 03:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
8247 |
megawatthours |
2025-08-17 03:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
30789 |
megawatthours |
2025-08-17 03:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
200 |
megawatthours |
2025-08-17 03:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
50364 |
megawatthours |
2025-08-17 03:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
26683 |
megawatthours |
2025-08-17 03:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
37338 |
megawatthours |
2025-08-17 03:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6825 |
megawatthours |
2025-08-17 03:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
3014 |
megawatthours |
2025-08-17 03:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6583 |
megawatthours |
2025-08-17 03:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1503 |
megawatthours |
2025-08-17 02:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
127 |
megawatthours |
2025-08-17 02:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1734 |
megawatthours |
2025-08-17 02:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4034 |
megawatthours |
2025-08-17 02:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
625188 |
megawatthours |
2025-08-17 02:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
26665 |
megawatthours |
2025-08-17 02:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
471 |
megawatthours |
2025-08-17 02:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
505 |
megawatthours |
2025-08-17 02:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
72102 |
megawatthours |
2025-08-17 02:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2571 |
megawatthours |
2025-08-17 02:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
26665 |
megawatthours |
2025-08-17 02:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
3462 |
megawatthours |
2025-08-17 02:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
367 |
megawatthours |
2025-08-17 02:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
52098 |
megawatthours |
2025-08-17 02:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
21454 |
megawatthours |
2025-08-17 02:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6608 |
megawatthours |
2025-08-17 02:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
34436 |
megawatthours |
2025-08-17 02:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
300 |
megawatthours |
2025-08-17 02:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
34436 |
megawatthours |
2025-08-17 02:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
964 |
megawatthours |
2025-08-17 02:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3471 |
megawatthours |
2025-08-17 02:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2617 |
megawatthours |
2025-08-17 02:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
6371 |
megawatthours |
2025-08-17 02:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
2135 |
megawatthours |
2025-08-17 02:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
115113 |
megawatthours |
2025-08-17 02:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2960 |
megawatthours |
2025-08-17 02:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2673 |
megawatthours |
2025-08-17 02:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
8402 |
megawatthours |
2025-08-17 02:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
22370 |
megawatthours |
2025-08-17 02:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
22370 |
megawatthours |
2025-08-17 02:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
49075 |
megawatthours |
2025-08-17 02:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
7274 |
megawatthours |
2025-08-17 02:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
16220 |
megawatthours |
2025-08-17 02:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
104155 |
megawatthours |
2025-08-17 02:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
109621 |
megawatthours |
2025-08-17 02:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
115113 |
megawatthours |
2025-08-17 02:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
5466 |
megawatthours |
2025-08-17 02:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3124 |
megawatthours |
2025-08-17 02:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2014 |
megawatthours |
2025-08-17 02:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
16220 |
megawatthours |
2025-08-17 02:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3315 |
megawatthours |
2025-08-17 02:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
113 |
megawatthours |
2025-08-17 02:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
227 |
megawatthours |
2025-08-17 02:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
817 |
megawatthours |
2025-08-17 02:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
22480 |
megawatthours |
2025-08-17 02:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
7556 |
megawatthours |
2025-08-17 02:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
2940 |
megawatthours |
2025-08-17 02:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
39459 |
megawatthours |
2025-08-17 02:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
72102 |
megawatthours |
2025-08-17 02:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1567 |
megawatthours |
2025-08-17 02:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
15793 |
megawatthours |
2025-08-17 02:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
306 |
megawatthours |
2025-08-17 02:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
592 |
megawatthours |
2025-08-17 02:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
8929 |
megawatthours |
2025-08-17 02:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
30979 |
megawatthours |
2025-08-17 02:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
205 |
megawatthours |
2025-08-17 02:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
52098 |
megawatthours |
2025-08-17 02:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
28785 |
megawatthours |
2025-08-17 02:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
37790 |
megawatthours |
2025-08-17 02:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6997 |
megawatthours |
2025-08-17 02:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
3182 |
megawatthours |
2025-08-17 02:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6839 |
megawatthours |
2025-08-17 02:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1542 |
megawatthours |
2025-08-17 01:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
125 |
megawatthours |
2025-08-17 01:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1575 |
megawatthours |
2025-08-17 01:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4151 |
megawatthours |
2025-08-17 01:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
648261 |
megawatthours |
2025-08-17 01:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
27765 |
megawatthours |
2025-08-17 01:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
473 |
megawatthours |
2025-08-17 01:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
510 |
megawatthours |
2025-08-17 01:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
74744 |
megawatthours |
2025-08-17 01:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2601 |
megawatthours |
2025-08-17 01:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
27765 |
megawatthours |
2025-08-17 01:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
3690 |
megawatthours |
2025-08-17 01:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
392 |
megawatthours |
2025-08-17 01:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
53793 |
megawatthours |
2025-08-17 01:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
21966 |
megawatthours |
2025-08-17 01:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6846 |
megawatthours |
2025-08-17 01:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
35926 |
megawatthours |
2025-08-17 01:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
318 |
megawatthours |
2025-08-17 01:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
35926 |
megawatthours |
2025-08-17 01:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
967 |
megawatthours |
2025-08-17 01:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3658 |
megawatthours |
2025-08-17 01:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2574 |
megawatthours |
2025-08-17 01:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
6441 |
megawatthours |
2025-08-17 01:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
2176 |
megawatthours |
2025-08-17 01:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
122163 |
megawatthours |
2025-08-17 01:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2876 |
megawatthours |
2025-08-17 01:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2709 |
megawatthours |
2025-08-17 01:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
8618 |
megawatthours |
2025-08-17 01:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
23133 |
megawatthours |
2025-08-17 01:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
23133 |
megawatthours |
2025-08-17 01:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
49627 |
megawatthours |
2025-08-17 01:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
7365 |
megawatthours |
2025-08-17 01:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
17110 |
megawatthours |
2025-08-17 01:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
107522 |
megawatthours |
2025-08-17 01:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
113223 |
megawatthours |
2025-08-17 01:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
122163 |
megawatthours |
2025-08-17 01:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
5701 |
megawatthours |
2025-08-17 01:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3174 |
megawatthours |
2025-08-17 01:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2058 |
megawatthours |
2025-08-17 01:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
17110 |
megawatthours |
2025-08-17 01:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3383 |
megawatthours |
2025-08-17 01:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
119 |
megawatthours |
2025-08-17 01:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
232 |
megawatthours |
2025-08-17 01:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
836 |
megawatthours |
2025-08-17 01:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
23910 |
megawatthours |
2025-08-17 01:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
8008 |
megawatthours |
2025-08-17 01:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
3125 |
megawatthours |
2025-08-17 01:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
41852 |
megawatthours |
2025-08-17 01:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
74744 |
megawatthours |
2025-08-17 01:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1654 |
megawatthours |
2025-08-17 01:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
16697 |
megawatthours |
2025-08-17 01:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
308 |
megawatthours |
2025-08-17 01:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
614 |
megawatthours |
2025-08-17 01:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
9419 |
megawatthours |
2025-08-17 01:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
29672 |
megawatthours |
2025-08-17 01:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
207 |
megawatthours |
2025-08-17 01:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
53793 |
megawatthours |
2025-08-17 01:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
30388 |
megawatthours |
2025-08-17 01:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
36571 |
megawatthours |
2025-08-17 01:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
7043 |
megawatthours |
2025-08-17 01:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
3215 |
megawatthours |
2025-08-17 01:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
7114 |
megawatthours |
2025-08-17 01:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1551 |
megawatthours |
2025-08-17 00:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
127 |
megawatthours |
2025-08-17 00:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1584 |
megawatthours |
2025-08-17 00:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4214 |
megawatthours |
2025-08-17 00:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
664769 |
megawatthours |
2025-08-17 00:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
29084 |
megawatthours |
2025-08-17 00:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
474 |
megawatthours |
2025-08-17 00:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
500 |
megawatthours |
2025-08-17 00:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
77391 |
megawatthours |
2025-08-17 00:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2565 |
megawatthours |
2025-08-17 00:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
29084 |
megawatthours |
2025-08-17 00:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
3831 |
megawatthours |
2025-08-17 00:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
412 |
megawatthours |
2025-08-17 00:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
55064 |
megawatthours |
2025-08-17 00:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
21954 |
megawatthours |
2025-08-17 00:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6857 |
megawatthours |
2025-08-17 00:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
37317 |
megawatthours |
2025-08-17 00:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
329 |
megawatthours |
2025-08-17 00:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
37317 |
megawatthours |
2025-08-17 00:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
955 |
megawatthours |
2025-08-17 00:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3789 |
megawatthours |
2025-08-17 00:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2350 |
megawatthours |
2025-08-17 00:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
6577 |
megawatthours |
2025-08-17 00:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
2172 |
megawatthours |
2025-08-17 00:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
126981 |
megawatthours |
2025-08-17 00:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2843 |
megawatthours |
2025-08-17 00:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2703 |
megawatthours |
2025-08-17 00:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
8700 |
megawatthours |
2025-08-17 00:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
23518 |
megawatthours |
2025-08-17 00:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
23518 |
megawatthours |
2025-08-17 00:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
49421 |
megawatthours |
2025-08-17 00:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
7312 |
megawatthours |
2025-08-17 00:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
17540 |
megawatthours |
2025-08-17 00:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
110974 |
megawatthours |
2025-08-17 00:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
116949 |
megawatthours |
2025-08-17 00:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
126981 |
megawatthours |
2025-08-17 00:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
5975 |
megawatthours |
2025-08-17 00:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3115 |
megawatthours |
2025-08-17 00:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2119 |
megawatthours |
2025-08-17 00:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
17540 |
megawatthours |
2025-08-17 00:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3330 |
megawatthours |
2025-08-17 00:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
121 |
megawatthours |
2025-08-17 00:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
228 |
megawatthours |
2025-08-17 00:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
842 |
megawatthours |
2025-08-17 00:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
24745 |
megawatthours |
2025-08-17 00:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
8344 |
megawatthours |
2025-08-17 00:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
3235 |
megawatthours |
2025-08-17 00:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
43364 |
megawatthours |
2025-08-17 00:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
77391 |
megawatthours |
2025-08-17 00:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1719 |
megawatthours |
2025-08-17 00:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
17486 |
megawatthours |
2025-08-17 00:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
308 |
megawatthours |
2025-08-17 00:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
643 |
megawatthours |
2025-08-17 00:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
9787 |
megawatthours |
2025-08-17 00:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
27722 |
megawatthours |
2025-08-17 00:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
207 |
megawatthours |
2025-08-17 00:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
55064 |
megawatthours |
2025-08-17 00:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
31705 |
megawatthours |
2025-08-17 00:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
34481 |
megawatthours |
2025-08-17 00:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6951 |
megawatthours |
2025-08-17 00:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
3144 |
megawatthours |
2025-08-17 00:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
7057 |
megawatthours |
2025-08-17 00:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1528 |
megawatthours |
2025-08-16 23:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
125 |
megawatthours |
2025-08-16 23:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1533 |
megawatthours |
2025-08-16 23:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4222 |
megawatthours |
2025-08-16 23:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
677132 |
megawatthours |
2025-08-16 23:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
30052 |
megawatthours |
2025-08-16 23:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
468 |
megawatthours |
2025-08-16 23:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
484 |
megawatthours |
2025-08-16 23:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
78844 |
megawatthours |
2025-08-16 23:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2551 |
megawatthours |
2025-08-16 23:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
30052 |
megawatthours |
2025-08-16 23:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
4013 |
megawatthours |
2025-08-16 23:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
424 |
megawatthours |
2025-08-16 23:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
55972 |
megawatthours |
2025-08-16 23:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
21501 |
megawatthours |
2025-08-16 23:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6743 |
megawatthours |
2025-08-16 23:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
39006 |
megawatthours |
2025-08-16 23:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
351 |
megawatthours |
2025-08-16 23:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
39006 |
megawatthours |
2025-08-16 23:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
940 |
megawatthours |
2025-08-16 23:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3948 |
megawatthours |
2025-08-16 23:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2264 |
megawatthours |
2025-08-16 23:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
6555 |
megawatthours |
2025-08-16 23:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
2126 |
megawatthours |
2025-08-16 23:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
131733 |
megawatthours |
2025-08-16 23:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2731 |
megawatthours |
2025-08-16 23:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2669 |
megawatthours |
2025-08-16 23:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
8610 |
megawatthours |
2025-08-16 23:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
23704 |
megawatthours |
2025-08-16 23:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
23704 |
megawatthours |
2025-08-16 23:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
48605 |
megawatthours |
2025-08-16 23:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
7017 |
megawatthours |
2025-08-16 23:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
17700 |
megawatthours |
2025-08-16 23:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
113006 |
megawatthours |
2025-08-16 23:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
119219 |
megawatthours |
2025-08-16 23:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
131733 |
megawatthours |
2025-08-16 23:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
6213 |
megawatthours |
2025-08-16 23:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2977 |
megawatthours |
2025-08-16 23:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2165 |
megawatthours |
2025-08-16 23:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
17700 |
megawatthours |
2025-08-16 23:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3291 |
megawatthours |
2025-08-16 23:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
123 |
megawatthours |
2025-08-16 23:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
227 |
megawatthours |
2025-08-16 23:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
842 |
megawatthours |
2025-08-16 23:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
26219 |
megawatthours |
2025-08-16 23:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
8696 |
megawatthours |
2025-08-16 23:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
3390 |
megawatthours |
2025-08-16 23:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
45608 |
megawatthours |
2025-08-16 23:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
78844 |
megawatthours |
2025-08-16 23:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1699 |
megawatthours |
2025-08-16 23:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
18294 |
megawatthours |
2025-08-16 23:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
314 |
megawatthours |
2025-08-16 23:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
674 |
megawatthours |
2025-08-16 23:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
10206 |
megawatthours |
2025-08-16 23:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
25608 |
megawatthours |
2025-08-16 23:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
204 |
megawatthours |
2025-08-16 23:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
55972 |
megawatthours |
2025-08-16 23:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
33122 |
megawatthours |
2025-08-16 23:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
32066 |
megawatthours |
2025-08-16 23:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6858 |
megawatthours |
2025-08-16 23:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2997 |
megawatthours |
2025-08-16 23:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6849 |
megawatthours |
2025-08-16 23:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1495 |
megawatthours |
2025-08-16 22:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
124 |
megawatthours |
2025-08-16 22:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1483 |
megawatthours |
2025-08-16 22:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4180 |
megawatthours |
2025-08-16 22:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
680903 |
megawatthours |
2025-08-16 22:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
30455 |
megawatthours |
2025-08-16 22:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
458 |
megawatthours |
2025-08-16 22:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
460 |
megawatthours |
2025-08-16 22:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
79082 |
megawatthours |
2025-08-16 22:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2424 |
megawatthours |
2025-08-16 22:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
30455 |
megawatthours |
2025-08-16 22:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
4197 |
megawatthours |
2025-08-16 22:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
436 |
megawatthours |
2025-08-16 22:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
55903 |
megawatthours |
2025-08-16 22:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
20648 |
megawatthours |
2025-08-16 22:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6541 |
megawatthours |
2025-08-16 22:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
40298 |
megawatthours |
2025-08-16 22:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
375 |
megawatthours |
2025-08-16 22:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
40298 |
megawatthours |
2025-08-16 22:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
940 |
megawatthours |
2025-08-16 22:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
4042 |
megawatthours |
2025-08-16 22:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2213 |
megawatthours |
2025-08-16 22:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
6308 |
megawatthours |
2025-08-16 22:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
2037 |
megawatthours |
2025-08-16 22:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
135830 |
megawatthours |
2025-08-16 22:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2641 |
megawatthours |
2025-08-16 22:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2609 |
megawatthours |
2025-08-16 22:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
8421 |
megawatthours |
2025-08-16 22:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
23463 |
megawatthours |
2025-08-16 22:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
23463 |
megawatthours |
2025-08-16 22:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
47389 |
megawatthours |
2025-08-16 22:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
6692 |
megawatthours |
2025-08-16 22:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
17250 |
megawatthours |
2025-08-16 22:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
113307 |
megawatthours |
2025-08-16 22:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
119650 |
megawatthours |
2025-08-16 22:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
135830 |
megawatthours |
2025-08-16 22:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
6343 |
megawatthours |
2025-08-16 22:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2831 |
megawatthours |
2025-08-16 22:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2192 |
megawatthours |
2025-08-16 22:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
17250 |
megawatthours |
2025-08-16 22:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3209 |
megawatthours |
2025-08-16 22:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
125 |
megawatthours |
2025-08-16 22:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
227 |
megawatthours |
2025-08-16 22:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
840 |
megawatthours |
2025-08-16 22:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
27139 |
megawatthours |
2025-08-16 22:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
8949 |
megawatthours |
2025-08-16 22:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
3555 |
megawatthours |
2025-08-16 22:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
47195 |
megawatthours |
2025-08-16 22:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
79082 |
megawatthours |
2025-08-16 22:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1637 |
megawatthours |
2025-08-16 22:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
18793 |
megawatthours |
2025-08-16 22:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
310 |
megawatthours |
2025-08-16 22:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
696 |
megawatthours |
2025-08-16 22:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
10514 |
megawatthours |
2025-08-16 22:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
23616 |
megawatthours |
2025-08-16 22:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
201 |
megawatthours |
2025-08-16 22:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
55903 |
megawatthours |
2025-08-16 22:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
34045 |
megawatthours |
2025-08-16 22:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
29694 |
megawatthours |
2025-08-16 22:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6774 |
megawatthours |
2025-08-16 22:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2787 |
megawatthours |
2025-08-16 22:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6526 |
megawatthours |
2025-08-16 22:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1469 |
megawatthours |
2025-08-16 21:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
119 |
megawatthours |
2025-08-16 21:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1496 |
megawatthours |
2025-08-16 21:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4103 |
megawatthours |
2025-08-16 21:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
675811 |
megawatthours |
2025-08-16 21:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
30421 |
megawatthours |
2025-08-16 21:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
458 |
megawatthours |
2025-08-16 21:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
433 |
megawatthours |
2025-08-16 21:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
78594 |
megawatthours |
2025-08-16 21:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2280 |
megawatthours |
2025-08-16 21:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
30421 |
megawatthours |
2025-08-16 21:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
4255 |
megawatthours |
2025-08-16 21:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
452 |
megawatthours |
2025-08-16 21:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
55672 |
megawatthours |
2025-08-16 21:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
19725 |
megawatthours |
2025-08-16 21:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6289 |
megawatthours |
2025-08-16 21:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
40497 |
megawatthours |
2025-08-16 21:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
394 |
megawatthours |
2025-08-16 21:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
40497 |
megawatthours |
2025-08-16 21:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
945 |
megawatthours |
2025-08-16 21:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
4094 |
megawatthours |
2025-08-16 21:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2102 |
megawatthours |
2025-08-16 21:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
6206 |
megawatthours |
2025-08-16 21:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1936 |
megawatthours |
2025-08-16 21:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
137517 |
megawatthours |
2025-08-16 21:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2585 |
megawatthours |
2025-08-16 21:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2548 |
megawatthours |
2025-08-16 21:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
8200 |
megawatthours |
2025-08-16 21:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
22950 |
megawatthours |
2025-08-16 21:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
22950 |
megawatthours |
2025-08-16 21:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
46040 |
megawatthours |
2025-08-16 21:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
6196 |
megawatthours |
2025-08-16 21:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
16320 |
megawatthours |
2025-08-16 21:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
112198 |
megawatthours |
2025-08-16 21:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
118551 |
megawatthours |
2025-08-16 21:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
137517 |
megawatthours |
2025-08-16 21:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
6353 |
megawatthours |
2025-08-16 21:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2692 |
megawatthours |
2025-08-16 21:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2176 |
megawatthours |
2025-08-16 21:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
16320 |
megawatthours |
2025-08-16 21:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3115 |
megawatthours |
2025-08-16 21:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
123 |
megawatthours |
2025-08-16 21:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
222 |
megawatthours |
2025-08-16 21:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
833 |
megawatthours |
2025-08-16 21:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
27476 |
megawatthours |
2025-08-16 21:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
8989 |
megawatthours |
2025-08-16 21:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
3625 |
megawatthours |
2025-08-16 21:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
47712 |
megawatthours |
2025-08-16 21:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
78594 |
megawatthours |
2025-08-16 21:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1572 |
megawatthours |
2025-08-16 21:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
18822 |
megawatthours |
2025-08-16 21:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
305 |
megawatthours |
2025-08-16 21:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
698 |
megawatthours |
2025-08-16 21:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
10571 |
megawatthours |
2025-08-16 21:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
21961 |
megawatthours |
2025-08-16 21:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
199 |
megawatthours |
2025-08-16 21:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
55672 |
megawatthours |
2025-08-16 21:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
34185 |
megawatthours |
2025-08-16 21:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
27627 |
megawatthours |
2025-08-16 21:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6674 |
megawatthours |
2025-08-16 21:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2541 |
megawatthours |
2025-08-16 21:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6152 |
megawatthours |
2025-08-16 21:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1452 |
megawatthours |
2025-08-16 20:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
117 |
megawatthours |
2025-08-16 20:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1421 |
megawatthours |
2025-08-16 20:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4040 |
megawatthours |
2025-08-16 20:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
664251 |
megawatthours |
2025-08-16 20:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
29984 |
megawatthours |
2025-08-16 20:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
453 |
megawatthours |
2025-08-16 20:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
403 |
megawatthours |
2025-08-16 20:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
77351 |
megawatthours |
2025-08-16 20:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2164 |
megawatthours |
2025-08-16 20:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
29984 |
megawatthours |
2025-08-16 20:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
4251 |
megawatthours |
2025-08-16 20:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
472 |
megawatthours |
2025-08-16 20:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
54607 |
megawatthours |
2025-08-16 20:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
18642 |
megawatthours |
2025-08-16 20:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
5969 |
megawatthours |
2025-08-16 20:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
40050 |
megawatthours |
2025-08-16 20:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
403 |
megawatthours |
2025-08-16 20:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
40050 |
megawatthours |
2025-08-16 20:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
946 |
megawatthours |
2025-08-16 20:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
4090 |
megawatthours |
2025-08-16 20:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2011 |
megawatthours |
2025-08-16 20:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
5809 |
megawatthours |
2025-08-16 20:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1834 |
megawatthours |
2025-08-16 20:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
137012 |
megawatthours |
2025-08-16 20:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2556 |
megawatthours |
2025-08-16 20:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2486 |
megawatthours |
2025-08-16 20:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
7952 |
megawatthours |
2025-08-16 20:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
22276 |
megawatthours |
2025-08-16 20:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
22276 |
megawatthours |
2025-08-16 20:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
44528 |
megawatthours |
2025-08-16 20:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
5810 |
megawatthours |
2025-08-16 20:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
15170 |
megawatthours |
2025-08-16 20:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
110352 |
megawatthours |
2025-08-16 20:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
116670 |
megawatthours |
2025-08-16 20:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
137012 |
megawatthours |
2025-08-16 20:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
6318 |
megawatthours |
2025-08-16 20:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2616 |
megawatthours |
2025-08-16 20:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2168 |
megawatthours |
2025-08-16 20:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
15170 |
megawatthours |
2025-08-16 20:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2985 |
megawatthours |
2025-08-16 20:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
120 |
megawatthours |
2025-08-16 20:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
220 |
megawatthours |
2025-08-16 20:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
827 |
megawatthours |
2025-08-16 20:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
27688 |
megawatthours |
2025-08-16 20:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
8874 |
megawatthours |
2025-08-16 20:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
3670 |
megawatthours |
2025-08-16 20:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
47866 |
megawatthours |
2025-08-16 20:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
77351 |
megawatthours |
2025-08-16 20:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1505 |
megawatthours |
2025-08-16 20:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
18505 |
megawatthours |
2025-08-16 20:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
300 |
megawatthours |
2025-08-16 20:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
688 |
megawatthours |
2025-08-16 20:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
10486 |
megawatthours |
2025-08-16 20:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
20993 |
megawatthours |
2025-08-16 20:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
195 |
megawatthours |
2025-08-16 20:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
54607 |
megawatthours |
2025-08-16 20:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
33769 |
megawatthours |
2025-08-16 20:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
26326 |
megawatthours |
2025-08-16 20:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6612 |
megawatthours |
2025-08-16 20:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2314 |
megawatthours |
2025-08-16 20:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
5749 |
megawatthours |
2025-08-16 20:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1429 |
megawatthours |
2025-08-16 19:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
113 |
megawatthours |
2025-08-16 19:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1342 |
megawatthours |
2025-08-16 19:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3933 |
megawatthours |
2025-08-16 19:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
648580 |
megawatthours |
2025-08-16 19:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
29327 |
megawatthours |
2025-08-16 19:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
447 |
megawatthours |
2025-08-16 19:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
375 |
megawatthours |
2025-08-16 19:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
75479 |
megawatthours |
2025-08-16 19:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2034 |
megawatthours |
2025-08-16 19:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
29327 |
megawatthours |
2025-08-16 19:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
4239 |
megawatthours |
2025-08-16 19:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
486 |
megawatthours |
2025-08-16 19:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
53218 |
megawatthours |
2025-08-16 19:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
17516 |
megawatthours |
2025-08-16 19:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
5607 |
megawatthours |
2025-08-16 19:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
39006 |
megawatthours |
2025-08-16 19:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
410 |
megawatthours |
2025-08-16 19:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
39006 |
megawatthours |
2025-08-16 19:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
940 |
megawatthours |
2025-08-16 19:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
4033 |
megawatthours |
2025-08-16 19:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
1999 |
megawatthours |
2025-08-16 19:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
5495 |
megawatthours |
2025-08-16 19:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1734 |
megawatthours |
2025-08-16 19:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
134914 |
megawatthours |
2025-08-16 19:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2528 |
megawatthours |
2025-08-16 19:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2425 |
megawatthours |
2025-08-16 19:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
7638 |
megawatthours |
2025-08-16 19:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
21671 |
megawatthours |
2025-08-16 19:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
21671 |
megawatthours |
2025-08-16 19:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
43053 |
megawatthours |
2025-08-16 19:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
5460 |
megawatthours |
2025-08-16 19:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
14180 |
megawatthours |
2025-08-16 19:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
107896 |
megawatthours |
2025-08-16 19:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
114104 |
megawatthours |
2025-08-16 19:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
134914 |
megawatthours |
2025-08-16 19:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
6208 |
megawatthours |
2025-08-16 19:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2555 |
megawatthours |
2025-08-16 19:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2156 |
megawatthours |
2025-08-16 19:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
14180 |
megawatthours |
2025-08-16 19:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2855 |
megawatthours |
2025-08-16 19:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
116 |
megawatthours |
2025-08-16 19:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
222 |
megawatthours |
2025-08-16 19:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
819 |
megawatthours |
2025-08-16 19:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
27325 |
megawatthours |
2025-08-16 19:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
8670 |
megawatthours |
2025-08-16 19:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
3630 |
megawatthours |
2025-08-16 19:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
47254 |
megawatthours |
2025-08-16 19:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
75479 |
megawatthours |
2025-08-16 19:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1416 |
megawatthours |
2025-08-16 19:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
18004 |
megawatthours |
2025-08-16 19:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
295 |
megawatthours |
2025-08-16 19:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
678 |
megawatthours |
2025-08-16 19:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
10283 |
megawatthours |
2025-08-16 19:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
20777 |
megawatthours |
2025-08-16 19:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
192 |
megawatthours |
2025-08-16 19:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
53218 |
megawatthours |
2025-08-16 19:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
32998 |
megawatthours |
2025-08-16 19:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
25861 |
megawatthours |
2025-08-16 19:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6508 |
megawatthours |
2025-08-16 19:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2154 |
megawatthours |
2025-08-16 19:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
5383 |
megawatthours |
2025-08-16 19:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1406 |
megawatthours |
2025-08-16 18:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
106 |
megawatthours |
2025-08-16 18:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1255 |
megawatthours |
2025-08-16 18:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3770 |
megawatthours |
2025-08-16 18:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
629245 |
megawatthours |
2025-08-16 18:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
28220 |
megawatthours |
2025-08-16 18:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
438 |
megawatthours |
2025-08-16 18:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
352 |
megawatthours |
2025-08-16 18:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
72839 |
megawatthours |
2025-08-16 18:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
1934 |
megawatthours |
2025-08-16 18:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
28220 |
megawatthours |
2025-08-16 18:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
4163 |
megawatthours |
2025-08-16 18:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
483 |
megawatthours |
2025-08-16 18:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
51337 |
megawatthours |
2025-08-16 18:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
16477 |
megawatthours |
2025-08-16 18:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
5294 |
megawatthours |
2025-08-16 18:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
37665 |
megawatthours |
2025-08-16 18:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
401 |
megawatthours |
2025-08-16 18:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
37665 |
megawatthours |
2025-08-16 18:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
928 |
megawatthours |
2025-08-16 18:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3943 |
megawatthours |
2025-08-16 18:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2016 |
megawatthours |
2025-08-16 18:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
5137 |
megawatthours |
2025-08-16 18:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1635 |
megawatthours |
2025-08-16 18:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
132225 |
megawatthours |
2025-08-16 18:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2517 |
megawatthours |
2025-08-16 18:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2364 |
megawatthours |
2025-08-16 18:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
7282 |
megawatthours |
2025-08-16 18:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
21108 |
megawatthours |
2025-08-16 18:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
21108 |
megawatthours |
2025-08-16 18:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
41454 |
megawatthours |
2025-08-16 18:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
5141 |
megawatthours |
2025-08-16 18:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
13080 |
megawatthours |
2025-08-16 18:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
104519 |
megawatthours |
2025-08-16 18:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
110547 |
megawatthours |
2025-08-16 18:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
132225 |
megawatthours |
2025-08-16 18:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
6028 |
megawatthours |
2025-08-16 18:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2511 |
megawatthours |
2025-08-16 18:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2163 |
megawatthours |
2025-08-16 18:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
13080 |
megawatthours |
2025-08-16 18:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2739 |
megawatthours |
2025-08-16 18:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
114 |
megawatthours |
2025-08-16 18:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
223 |
megawatthours |
2025-08-16 18:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
798 |
megawatthours |
2025-08-16 18:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
26711 |
megawatthours |
2025-08-16 18:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
8371 |
megawatthours |
2025-08-16 18:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
3545 |
megawatthours |
2025-08-16 18:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
46174 |
megawatthours |
2025-08-16 18:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
72839 |
megawatthours |
2025-08-16 18:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1326 |
megawatthours |
2025-08-16 18:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
17323 |
megawatthours |
2025-08-16 18:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
291 |
megawatthours |
2025-08-16 18:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
651 |
megawatthours |
2025-08-16 18:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
10037 |
megawatthours |
2025-08-16 18:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
21282 |
megawatthours |
2025-08-16 18:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
187 |
megawatthours |
2025-08-16 18:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
51337 |
megawatthours |
2025-08-16 18:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
31954 |
megawatthours |
2025-08-16 18:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
26165 |
megawatthours |
2025-08-16 18:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6367 |
megawatthours |
2025-08-16 18:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2020 |
megawatthours |
2025-08-16 18:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
5033 |
megawatthours |
2025-08-16 18:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1373 |
megawatthours |
2025-08-16 17:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
103 |
megawatthours |
2025-08-16 17:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1217 |
megawatthours |
2025-08-16 17:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3751 |
megawatthours |
2025-08-16 17:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
606225 |
megawatthours |
2025-08-16 17:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
26595 |
megawatthours |
2025-08-16 17:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
420 |
megawatthours |
2025-08-16 17:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
338 |
megawatthours |
2025-08-16 17:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
69682 |
megawatthours |
2025-08-16 17:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
1836 |
megawatthours |
2025-08-16 17:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
26595 |
megawatthours |
2025-08-16 17:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
4016 |
megawatthours |
2025-08-16 17:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
468 |
megawatthours |
2025-08-16 17:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
49198 |
megawatthours |
2025-08-16 17:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
15398 |
megawatthours |
2025-08-16 17:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
4878 |
megawatthours |
2025-08-16 17:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
35976 |
megawatthours |
2025-08-16 17:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
371 |
megawatthours |
2025-08-16 17:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
35976 |
megawatthours |
2025-08-16 17:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
905 |
megawatthours |
2025-08-16 17:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3812 |
megawatthours |
2025-08-16 17:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
1992 |
megawatthours |
2025-08-16 17:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
4819 |
megawatthours |
2025-08-16 17:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1549 |
megawatthours |
2025-08-16 17:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
128615 |
megawatthours |
2025-08-16 17:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2469 |
megawatthours |
2025-08-16 17:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2286 |
megawatthours |
2025-08-16 17:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
6854 |
megawatthours |
2025-08-16 17:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
20531 |
megawatthours |
2025-08-16 17:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
20531 |
megawatthours |
2025-08-16 17:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
39852 |
megawatthours |
2025-08-16 17:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
4824 |
megawatthours |
2025-08-16 17:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
12550 |
megawatthours |
2025-08-16 17:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
100361 |
megawatthours |
2025-08-16 17:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
106121 |
megawatthours |
2025-08-16 17:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
128615 |
megawatthours |
2025-08-16 17:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
5760 |
megawatthours |
2025-08-16 17:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2458 |
megawatthours |
2025-08-16 17:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2125 |
megawatthours |
2025-08-16 17:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
12550 |
megawatthours |
2025-08-16 17:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2663 |
megawatthours |
2025-08-16 17:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
109 |
megawatthours |
2025-08-16 17:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
224 |
megawatthours |
2025-08-16 17:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
781 |
megawatthours |
2025-08-16 17:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
25837 |
megawatthours |
2025-08-16 17:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
7944 |
megawatthours |
2025-08-16 17:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
3425 |
megawatthours |
2025-08-16 17:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
44519 |
megawatthours |
2025-08-16 17:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
69682 |
megawatthours |
2025-08-16 17:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1231 |
megawatthours |
2025-08-16 17:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
16413 |
megawatthours |
2025-08-16 17:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
286 |
megawatthours |
2025-08-16 17:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
615 |
megawatthours |
2025-08-16 17:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
9613 |
megawatthours |
2025-08-16 17:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
22021 |
megawatthours |
2025-08-16 17:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
180 |
megawatthours |
2025-08-16 17:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
49198 |
megawatthours |
2025-08-16 17:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
30453 |
megawatthours |
2025-08-16 17:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
26735 |
megawatthours |
2025-08-16 17:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6185 |
megawatthours |
2025-08-16 17:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
1918 |
megawatthours |
2025-08-16 17:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
4687 |
megawatthours |
2025-08-16 17:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1334 |
megawatthours |
2025-08-16 16:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
97 |
megawatthours |
2025-08-16 16:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1149 |
megawatthours |
2025-08-16 16:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3570 |
megawatthours |
2025-08-16 16:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
578493 |
megawatthours |
2025-08-16 16:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
24704 |
megawatthours |
2025-08-16 16:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
395 |
megawatthours |
2025-08-16 16:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
323 |
megawatthours |
2025-08-16 16:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
66415 |
megawatthours |
2025-08-16 16:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
1754 |
megawatthours |
2025-08-16 16:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
24704 |
megawatthours |
2025-08-16 16:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
3812 |
megawatthours |
2025-08-16 16:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
437 |
megawatthours |
2025-08-16 16:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
46652 |
megawatthours |
2025-08-16 16:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
14573 |
megawatthours |
2025-08-16 16:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
4475 |
megawatthours |
2025-08-16 16:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
33641 |
megawatthours |
2025-08-16 16:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
345 |
megawatthours |
2025-08-16 16:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
33641 |
megawatthours |
2025-08-16 16:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
866 |
megawatthours |
2025-08-16 16:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3590 |
megawatthours |
2025-08-16 16:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2082 |
megawatthours |
2025-08-16 16:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
4493 |
megawatthours |
2025-08-16 16:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1493 |
megawatthours |
2025-08-16 16:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
123907 |
megawatthours |
2025-08-16 16:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2397 |
megawatthours |
2025-08-16 16:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2176 |
megawatthours |
2025-08-16 16:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
6442 |
megawatthours |
2025-08-16 16:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
19833 |
megawatthours |
2025-08-16 16:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
19833 |
megawatthours |
2025-08-16 16:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
38076 |
megawatthours |
2025-08-16 16:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
4559 |
megawatthours |
2025-08-16 16:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
11940 |
megawatthours |
2025-08-16 16:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
95321 |
megawatthours |
2025-08-16 16:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
100700 |
megawatthours |
2025-08-16 16:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
123907 |
megawatthours |
2025-08-16 16:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
5379 |
megawatthours |
2025-08-16 16:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2358 |
megawatthours |
2025-08-16 16:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2045 |
megawatthours |
2025-08-16 16:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
11940 |
megawatthours |
2025-08-16 16:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2559 |
megawatthours |
2025-08-16 16:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
103 |
megawatthours |
2025-08-16 16:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
221 |
megawatthours |
2025-08-16 16:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
768 |
megawatthours |
2025-08-16 16:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
24598 |
megawatthours |
2025-08-16 16:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
7379 |
megawatthours |
2025-08-16 16:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
3250 |
megawatthours |
2025-08-16 16:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
42190 |
megawatthours |
2025-08-16 16:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
66415 |
megawatthours |
2025-08-16 16:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1150 |
megawatthours |
2025-08-16 16:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
15338 |
megawatthours |
2025-08-16 16:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
281 |
megawatthours |
2025-08-16 16:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
583 |
megawatthours |
2025-08-16 16:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
9021 |
megawatthours |
2025-08-16 16:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
22809 |
megawatthours |
2025-08-16 16:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
171 |
megawatthours |
2025-08-16 16:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
46652 |
megawatthours |
2025-08-16 16:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
28532 |
megawatthours |
2025-08-16 16:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
27330 |
megawatthours |
2025-08-16 16:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
5949 |
megawatthours |
2025-08-16 16:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
1840 |
megawatthours |
2025-08-16 16:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
4552 |
megawatthours |
2025-08-16 16:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1271 |
megawatthours |
2025-08-16 15:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
92 |
megawatthours |
2025-08-16 15:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1096 |
megawatthours |
2025-08-16 15:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3411 |
megawatthours |
2025-08-16 15:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
545904 |
megawatthours |
2025-08-16 15:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
22450 |
megawatthours |
2025-08-16 15:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
362 |
megawatthours |
2025-08-16 15:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
316 |
megawatthours |
2025-08-16 15:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
62914 |
megawatthours |
2025-08-16 15:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
1693 |
megawatthours |
2025-08-16 15:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
22450 |
megawatthours |
2025-08-16 15:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
3533 |
megawatthours |
2025-08-16 15:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
399 |
megawatthours |
2025-08-16 15:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
43983 |
megawatthours |
2025-08-16 15:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
13890 |
megawatthours |
2025-08-16 15:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
4156 |
megawatthours |
2025-08-16 15:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
31015 |
megawatthours |
2025-08-16 15:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
304 |
megawatthours |
2025-08-16 15:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
31015 |
megawatthours |
2025-08-16 15:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
812 |
megawatthours |
2025-08-16 15:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3327 |
megawatthours |
2025-08-16 15:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2147 |
megawatthours |
2025-08-16 15:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
4340 |
megawatthours |
2025-08-16 15:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1453 |
megawatthours |
2025-08-16 15:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
117676 |
megawatthours |
2025-08-16 15:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2292 |
megawatthours |
2025-08-16 15:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2061 |
megawatthours |
2025-08-16 15:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
6046 |
megawatthours |
2025-08-16 15:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
19046 |
megawatthours |
2025-08-16 15:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
19046 |
megawatthours |
2025-08-16 15:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
36370 |
megawatthours |
2025-08-16 15:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
4338 |
megawatthours |
2025-08-16 15:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
11530 |
megawatthours |
2025-08-16 15:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
89477 |
megawatthours |
2025-08-16 15:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
94379 |
megawatthours |
2025-08-16 15:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
117676 |
megawatthours |
2025-08-16 15:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
4902 |
megawatthours |
2025-08-16 15:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2239 |
megawatthours |
2025-08-16 15:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1898 |
megawatthours |
2025-08-16 15:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
11530 |
megawatthours |
2025-08-16 15:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2406 |
megawatthours |
2025-08-16 15:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
95 |
megawatthours |
2025-08-16 15:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
213 |
megawatthours |
2025-08-16 15:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
762 |
megawatthours |
2025-08-16 15:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
22677 |
megawatthours |
2025-08-16 15:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
6723 |
megawatthours |
2025-08-16 15:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
3015 |
megawatthours |
2025-08-16 15:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
38857 |
megawatthours |
2025-08-16 15:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
62914 |
megawatthours |
2025-08-16 15:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1074 |
megawatthours |
2025-08-16 15:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
14171 |
megawatthours |
2025-08-16 15:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
276 |
megawatthours |
2025-08-16 15:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
541 |
megawatthours |
2025-08-16 15:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
8344 |
megawatthours |
2025-08-16 15:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
23082 |
megawatthours |
2025-08-16 15:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
161 |
megawatthours |
2025-08-16 15:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
43983 |
megawatthours |
2025-08-16 15:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
26383 |
megawatthours |
2025-08-16 15:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
27412 |
megawatthours |
2025-08-16 15:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
5670 |
megawatthours |
2025-08-16 15:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
1775 |
megawatthours |
2025-08-16 15:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
4418 |
megawatthours |
2025-08-16 15:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1194 |
megawatthours |
2025-08-16 14:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
88 |
megawatthours |
2025-08-16 14:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1079 |
megawatthours |
2025-08-16 14:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3317 |
megawatthours |
2025-08-16 14:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
512575 |
megawatthours |
2025-08-16 14:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
20262 |
megawatthours |
2025-08-16 14:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
349 |
megawatthours |
2025-08-16 14:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
306 |
megawatthours |
2025-08-16 14:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
58232 |
megawatthours |
2025-08-16 14:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
1650 |
megawatthours |
2025-08-16 14:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
20262 |
megawatthours |
2025-08-16 14:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
3200 |
megawatthours |
2025-08-16 14:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
362 |
megawatthours |
2025-08-16 14:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
41496 |
megawatthours |
2025-08-16 14:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
13417 |
megawatthours |
2025-08-16 14:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
3946 |
megawatthours |
2025-08-16 14:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
28761 |
megawatthours |
2025-08-16 14:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
264 |
megawatthours |
2025-08-16 14:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
28761 |
megawatthours |
2025-08-16 14:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
772 |
megawatthours |
2025-08-16 14:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3103 |
megawatthours |
2025-08-16 14:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2351 |
megawatthours |
2025-08-16 14:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
4238 |
megawatthours |
2025-08-16 14:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1433 |
megawatthours |
2025-08-16 14:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
110717 |
megawatthours |
2025-08-16 14:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2233 |
megawatthours |
2025-08-16 14:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
1979 |
megawatthours |
2025-08-16 14:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
5752 |
megawatthours |
2025-08-16 14:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
18258 |
megawatthours |
2025-08-16 14:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
18258 |
megawatthours |
2025-08-16 14:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
35321 |
megawatthours |
2025-08-16 14:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
4160 |
megawatthours |
2025-08-16 14:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
11440 |
megawatthours |
2025-08-16 14:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
83438 |
megawatthours |
2025-08-16 14:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
87831 |
megawatthours |
2025-08-16 14:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
110717 |
megawatthours |
2025-08-16 14:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
4393 |
megawatthours |
2025-08-16 14:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2178 |
megawatthours |
2025-08-16 14:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1758 |
megawatthours |
2025-08-16 14:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
11440 |
megawatthours |
2025-08-16 14:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2296 |
megawatthours |
2025-08-16 14:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
86 |
megawatthours |
2025-08-16 14:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
205 |
megawatthours |
2025-08-16 14:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
760 |
megawatthours |
2025-08-16 14:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
20665 |
megawatthours |
2025-08-16 14:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
6061 |
megawatthours |
2025-08-16 14:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
2765 |
megawatthours |
2025-08-16 14:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
35366 |
megawatthours |
2025-08-16 14:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
58232 |
megawatthours |
2025-08-16 14:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1008 |
megawatthours |
2025-08-16 14:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
13016 |
megawatthours |
2025-08-16 14:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
271 |
megawatthours |
2025-08-16 14:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
493 |
megawatthours |
2025-08-16 14:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
7624 |
megawatthours |
2025-08-16 14:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
23029 |
megawatthours |
2025-08-16 14:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
152 |
megawatthours |
2025-08-16 14:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
41496 |
megawatthours |
2025-08-16 14:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
24236 |
megawatthours |
2025-08-16 14:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
27238 |
megawatthours |
2025-08-16 14:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
5465 |
megawatthours |
2025-08-16 14:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
1725 |
megawatthours |
2025-08-16 14:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
4301 |
megawatthours |
2025-08-16 14:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1138 |
megawatthours |
2025-08-16 13:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
86 |
megawatthours |
2025-08-16 13:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
977 |
megawatthours |
2025-08-16 13:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3377 |
megawatthours |
2025-08-16 13:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
482790 |
megawatthours |
2025-08-16 13:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
18713 |
megawatthours |
2025-08-16 13:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
346 |
megawatthours |
2025-08-16 13:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
303 |
megawatthours |
2025-08-16 13:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
54328 |
megawatthours |
2025-08-16 13:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
1644 |
megawatthours |
2025-08-16 13:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
18713 |
megawatthours |
2025-08-16 13:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
2874 |
megawatthours |
2025-08-16 13:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
328 |
megawatthours |
2025-08-16 13:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
39453 |
megawatthours |
2025-08-16 13:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
13341 |
megawatthours |
2025-08-16 13:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
3894 |
megawatthours |
2025-08-16 13:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
26700 |
megawatthours |
2025-08-16 13:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
229 |
megawatthours |
2025-08-16 13:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
26700 |
megawatthours |
2025-08-16 13:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
760 |
megawatthours |
2025-08-16 13:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
2843 |
megawatthours |
2025-08-16 13:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2317 |
megawatthours |
2025-08-16 13:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
4205 |
megawatthours |
2025-08-16 13:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1450 |
megawatthours |
2025-08-16 13:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
103100 |
megawatthours |
2025-08-16 13:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2198 |
megawatthours |
2025-08-16 13:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
1932 |
megawatthours |
2025-08-16 13:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
5663 |
megawatthours |
2025-08-16 13:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
17622 |
megawatthours |
2025-08-16 13:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
17622 |
megawatthours |
2025-08-16 13:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
34964 |
megawatthours |
2025-08-16 13:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
4239 |
megawatthours |
2025-08-16 13:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
11500 |
megawatthours |
2025-08-16 13:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
78179 |
megawatthours |
2025-08-16 13:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
82142 |
megawatthours |
2025-08-16 13:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
103100 |
megawatthours |
2025-08-16 13:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
3963 |
megawatthours |
2025-08-16 13:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2155 |
megawatthours |
2025-08-16 13:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1581 |
megawatthours |
2025-08-16 13:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
11500 |
megawatthours |
2025-08-16 13:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2212 |
megawatthours |
2025-08-16 13:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
77 |
megawatthours |
2025-08-16 13:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
195 |
megawatthours |
2025-08-16 13:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
768 |
megawatthours |
2025-08-16 13:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
18560 |
megawatthours |
2025-08-16 13:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
5465 |
megawatthours |
2025-08-16 13:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
2500 |
megawatthours |
2025-08-16 13:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
31809 |
megawatthours |
2025-08-16 13:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
54328 |
megawatthours |
2025-08-16 13:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
992 |
megawatthours |
2025-08-16 13:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
11947 |
megawatthours |
2025-08-16 13:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
258 |
megawatthours |
2025-08-16 13:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
455 |
megawatthours |
2025-08-16 13:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
6931 |
megawatthours |
2025-08-16 13:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
22764 |
megawatthours |
2025-08-16 13:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
148 |
megawatthours |
2025-08-16 13:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
39453 |
megawatthours |
2025-08-16 13:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
22176 |
megawatthours |
2025-08-16 13:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
26943 |
megawatthours |
2025-08-16 13:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
5335 |
megawatthours |
2025-08-16 13:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
1721 |
megawatthours |
2025-08-16 13:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
4384 |
megawatthours |
2025-08-16 13:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1120 |
megawatthours |
2025-08-16 12:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
84 |
megawatthours |
2025-08-16 12:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
69 |
megawatthours |
2025-08-16 12:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1026 |
megawatthours |
2025-08-16 12:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
915 |
megawatthours |
2025-08-16 12:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3304 |
megawatthours |
2025-08-16 12:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
0 |
megawatthours |
2025-08-16 12:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
462801 |
megawatthours |
2025-08-16 12:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
461898 |
megawatthours |
2025-08-16 12:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
17899 |
megawatthours |
2025-08-16 12:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
17299 |
megawatthours |
2025-08-16 12:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
339 |
megawatthours |
2025-08-16 12:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
328 |
megawatthours |
2025-08-16 12:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
303 |
megawatthours |
2025-08-16 12:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
296 |
megawatthours |
2025-08-16 12:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
53951 |
megawatthours |
2025-08-16 12:00:00 |
TEX |
Texas |
D |
Demand |
55250 |
megawatthours |
2025-08-16 12:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
1644 |
megawatthours |
2025-08-16 12:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
1651 |
megawatthours |
2025-08-16 12:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
17899 |
megawatthours |
2025-08-16 12:00:00 |
TEN |
Tennessee |
D |
Demand |
17299 |
megawatthours |
2025-08-16 12:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
2602 |
megawatthours |
2025-08-16 12:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
2565 |
megawatthours |
2025-08-16 12:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
297 |
megawatthours |
2025-08-16 12:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
274 |
megawatthours |
2025-08-16 12:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
38634 |
megawatthours |
2025-08-16 12:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
35174 |
megawatthours |
2025-08-16 12:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
13426 |
megawatthours |
2025-08-16 12:00:00 |
SW |
Southwest |
D |
Demand |
11958 |
megawatthours |
2025-08-16 12:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
3924 |
megawatthours |
2025-08-16 12:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
4114 |
megawatthours |
2025-08-16 12:00:00 |
SPA |
Southwestern Power Administration |
D |
Demand |
21 |
megawatthours |
2025-08-16 12:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
24726 |
megawatthours |
2025-08-16 12:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
23735 |
megawatthours |
2025-08-16 12:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
205 |
megawatthours |
2025-08-16 12:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
242 |
megawatthours |
2025-08-16 12:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
24726 |
megawatthours |
2025-08-16 12:00:00 |
SE |
Southeast |
D |
Demand |
23735 |
megawatthours |
2025-08-16 12:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
754 |
megawatthours |
2025-08-16 12:00:00 |
SCL |
Seattle City Light |
D |
Demand |
707 |
megawatthours |
2025-08-16 12:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
2655 |
megawatthours |
2025-08-16 12:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
2655 |
megawatthours |
2025-08-16 12:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
2979 |
megawatthours |
2025-08-16 12:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2259 |
megawatthours |
2025-08-16 12:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
1894 |
megawatthours |
2025-08-16 12:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
4279 |
megawatthours |
2025-08-16 12:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
4344 |
megawatthours |
2025-08-16 12:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1445 |
megawatthours |
2025-08-16 12:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
1534 |
megawatthours |
2025-08-16 12:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
95956 |
megawatthours |
2025-08-16 12:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
94826 |
megawatthours |
2025-08-16 12:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2182 |
megawatthours |
2025-08-16 12:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2199 |
megawatthours |
2025-08-16 12:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
1912 |
megawatthours |
2025-08-16 12:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
1912 |
megawatthours |
2025-08-16 12:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
5669 |
megawatthours |
2025-08-16 12:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
5542 |
megawatthours |
2025-08-16 12:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
17190 |
megawatthours |
2025-08-16 12:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
17706 |
megawatthours |
2025-08-16 12:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
17190 |
megawatthours |
2025-08-16 12:00:00 |
NY |
New York |
D |
Demand |
17706 |
megawatthours |
2025-08-16 12:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1139 |
megawatthours |
2025-08-16 12:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
34869 |
megawatthours |
2025-08-16 12:00:00 |
NW |
Northwest |
D |
Demand |
33150 |
megawatthours |
2025-08-16 12:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
4343 |
megawatthours |
2025-08-16 12:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
4850 |
megawatthours |
2025-08-16 12:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
11470 |
megawatthours |
2025-08-16 12:00:00 |
NE |
New England |
D |
Demand |
12104 |
megawatthours |
2025-08-16 12:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
75167 |
megawatthours |
2025-08-16 12:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
75277 |
megawatthours |
2025-08-16 12:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
78858 |
megawatthours |
2025-08-16 12:00:00 |
MIDW |
Midwest |
D |
Demand |
81074 |
megawatthours |
2025-08-16 12:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
95956 |
megawatthours |
2025-08-16 12:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
94826 |
megawatthours |
2025-08-16 12:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
3691 |
megawatthours |
2025-08-16 12:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
3520 |
megawatthours |
2025-08-16 12:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2145 |
megawatthours |
2025-08-16 12:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
722 |
megawatthours |
2025-08-16 12:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1431 |
megawatthours |
2025-08-16 12:00:00 |
JEA |
JEA |
D |
Demand |
1508 |
megawatthours |
2025-08-16 12:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
11470 |
megawatthours |
2025-08-16 12:00:00 |
ISNE |
ISO New England |
D |
Demand |
12104 |
megawatthours |
2025-08-16 12:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2214 |
megawatthours |
2025-08-16 12:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
2102 |
megawatthours |
2025-08-16 12:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
419 |
megawatthours |
2025-08-16 12:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
72 |
megawatthours |
2025-08-16 12:00:00 |
HST |
City of Homestead |
D |
Demand |
71 |
megawatthours |
2025-08-16 12:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
189 |
megawatthours |
2025-08-16 12:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
227 |
megawatthours |
2025-08-16 12:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
770 |
megawatthours |
2025-08-16 12:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
798 |
megawatthours |
2025-08-16 12:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
16332 |
megawatthours |
2025-08-16 12:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
15545 |
megawatthours |
2025-08-16 12:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
5055 |
megawatthours |
2025-08-16 12:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
6260 |
megawatthours |
2025-08-16 12:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
2270 |
megawatthours |
2025-08-16 12:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
2114 |
megawatthours |
2025-08-16 12:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
28453 |
megawatthours |
2025-08-16 12:00:00 |
FLA |
Florida |
D |
Demand |
28806 |
megawatthours |
2025-08-16 12:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
53951 |
megawatthours |
2025-08-16 12:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
55250 |
megawatthours |
2025-08-16 12:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
989 |
megawatthours |
2025-08-16 12:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1002 |
megawatthours |
2025-08-16 12:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
11184 |
megawatthours |
2025-08-16 12:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
11143 |
megawatthours |
2025-08-16 12:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
256 |
megawatthours |
2025-08-16 12:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
228 |
megawatthours |
2025-08-16 12:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
423 |
megawatthours |
2025-08-16 12:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
435 |
megawatthours |
2025-08-16 12:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
6388 |
megawatthours |
2025-08-16 12:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
6535 |
megawatthours |
2025-08-16 12:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
22549 |
megawatthours |
2025-08-16 12:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
23849 |
megawatthours |
2025-08-16 12:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
146 |
megawatthours |
2025-08-16 12:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
148 |
megawatthours |
2025-08-16 12:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
38634 |
megawatthours |
2025-08-16 12:00:00 |
CENT |
Central |
D |
Demand |
35195 |
megawatthours |
2025-08-16 12:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
20650 |
megawatthours |
2025-08-16 12:00:00 |
CAR |
Carolinas |
D |
Demand |
23747 |
megawatthours |
2025-08-16 12:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
26719 |
megawatthours |
2025-08-16 12:00:00 |
CAL |
California |
D |
Demand |
27048 |
megawatthours |
2025-08-16 12:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
5248 |
megawatthours |
2025-08-16 12:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
5756 |
megawatthours |
2025-08-16 12:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
1722 |
megawatthours |
2025-08-16 12:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
1762 |
megawatthours |
2025-08-16 12:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
4398 |
megawatthours |
2025-08-16 12:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
2742 |
megawatthours |
2025-08-16 12:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1110 |
megawatthours |
2025-08-16 12:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1134 |
megawatthours |
2025-08-16 12:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
2277 |
megawatthours |
2025-08-16 11:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
82 |
megawatthours |
2025-08-16 11:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
69 |
megawatthours |
2025-08-16 11:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1061 |
megawatthours |
2025-08-16 11:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
909 |
megawatthours |
2025-08-16 11:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3284 |
megawatthours |
2025-08-16 11:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
3820 |
megawatthours |
2025-08-16 11:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
453177 |
megawatthours |
2025-08-16 11:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
466261 |
megawatthours |
2025-08-16 11:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
17788 |
megawatthours |
2025-08-16 11:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
17185 |
megawatthours |
2025-08-16 11:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
342 |
megawatthours |
2025-08-16 11:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
336 |
megawatthours |
2025-08-16 11:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
307 |
megawatthours |
2025-08-16 11:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
302 |
megawatthours |
2025-08-16 11:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
53737 |
megawatthours |
2025-08-16 11:00:00 |
TEX |
Texas |
D |
Demand |
54856 |
megawatthours |
2025-08-16 11:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
1662 |
megawatthours |
2025-08-16 11:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
1666 |
megawatthours |
2025-08-16 11:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
17788 |
megawatthours |
2025-08-16 11:00:00 |
TEN |
Tennessee |
D |
Demand |
17185 |
megawatthours |
2025-08-16 11:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
2549 |
megawatthours |
2025-08-16 11:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
2539 |
megawatthours |
2025-08-16 11:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
274 |
megawatthours |
2025-08-16 11:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
269 |
megawatthours |
2025-08-16 11:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
38683 |
megawatthours |
2025-08-16 11:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
35238 |
megawatthours |
2025-08-16 11:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
13582 |
megawatthours |
2025-08-16 11:00:00 |
SW |
Southwest |
D |
Demand |
14198 |
megawatthours |
2025-08-16 11:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
3995 |
megawatthours |
2025-08-16 11:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
4132 |
megawatthours |
2025-08-16 11:00:00 |
SPA |
Southwestern Power Administration |
D |
Demand |
29 |
megawatthours |
2025-08-16 11:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
24105 |
megawatthours |
2025-08-16 11:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
23422 |
megawatthours |
2025-08-16 11:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
197 |
megawatthours |
2025-08-16 11:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
231 |
megawatthours |
2025-08-16 11:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
24105 |
megawatthours |
2025-08-16 11:00:00 |
SE |
Southeast |
D |
Demand |
23422 |
megawatthours |
2025-08-16 11:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
766 |
megawatthours |
2025-08-16 11:00:00 |
SCL |
Seattle City Light |
D |
Demand |
770 |
megawatthours |
2025-08-16 11:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
2551 |
megawatthours |
2025-08-16 11:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
2551 |
megawatthours |
2025-08-16 11:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
2881 |
megawatthours |
2025-08-16 11:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2277 |
megawatthours |
2025-08-16 11:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
1912 |
megawatthours |
2025-08-16 11:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
4240 |
megawatthours |
2025-08-16 11:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
4383 |
megawatthours |
2025-08-16 11:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1441 |
megawatthours |
2025-08-16 11:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
1524 |
megawatthours |
2025-08-16 11:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
89783 |
megawatthours |
2025-08-16 11:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
92814 |
megawatthours |
2025-08-16 11:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2210 |
megawatthours |
2025-08-16 11:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2229 |
megawatthours |
2025-08-16 11:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
1919 |
megawatthours |
2025-08-16 11:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
1989 |
megawatthours |
2025-08-16 11:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
5695 |
megawatthours |
2025-08-16 11:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
5566 |
megawatthours |
2025-08-16 11:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
16927 |
megawatthours |
2025-08-16 11:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
17459 |
megawatthours |
2025-08-16 11:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
16927 |
megawatthours |
2025-08-16 11:00:00 |
NY |
New York |
D |
Demand |
17459 |
megawatthours |
2025-08-16 11:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1148 |
megawatthours |
2025-08-16 11:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
35046 |
megawatthours |
2025-08-16 11:00:00 |
NW |
Northwest |
D |
Demand |
37331 |
megawatthours |
2025-08-16 11:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
4428 |
megawatthours |
2025-08-16 11:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
4933 |
megawatthours |
2025-08-16 11:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
11370 |
megawatthours |
2025-08-16 11:00:00 |
NE |
New England |
D |
Demand |
12124 |
megawatthours |
2025-08-16 11:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
74367 |
megawatthours |
2025-08-16 11:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
74749 |
megawatthours |
2025-08-16 11:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
78022 |
megawatthours |
2025-08-16 11:00:00 |
MIDW |
Midwest |
D |
Demand |
80922 |
megawatthours |
2025-08-16 11:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
89783 |
megawatthours |
2025-08-16 11:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
92814 |
megawatthours |
2025-08-16 11:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
3655 |
megawatthours |
2025-08-16 11:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
3896 |
megawatthours |
2025-08-16 11:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2182 |
megawatthours |
2025-08-16 11:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
2156 |
megawatthours |
2025-08-16 11:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1388 |
megawatthours |
2025-08-16 11:00:00 |
JEA |
JEA |
D |
Demand |
1477 |
megawatthours |
2025-08-16 11:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
11370 |
megawatthours |
2025-08-16 11:00:00 |
ISNE |
ISO New England |
D |
Demand |
12124 |
megawatthours |
2025-08-16 11:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2241 |
megawatthours |
2025-08-16 11:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
2120 |
megawatthours |
2025-08-16 11:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
440 |
megawatthours |
2025-08-16 11:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
74 |
megawatthours |
2025-08-16 11:00:00 |
HST |
City of Homestead |
D |
Demand |
71 |
megawatthours |
2025-08-16 11:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
189 |
megawatthours |
2025-08-16 11:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
223 |
megawatthours |
2025-08-16 11:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
784 |
megawatthours |
2025-08-16 11:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
794 |
megawatthours |
2025-08-16 11:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
15381 |
megawatthours |
2025-08-16 11:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
15195 |
megawatthours |
2025-08-16 11:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
4922 |
megawatthours |
2025-08-16 11:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
6157 |
megawatthours |
2025-08-16 11:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
2125 |
megawatthours |
2025-08-16 11:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
2060 |
megawatthours |
2025-08-16 11:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
27099 |
megawatthours |
2025-08-16 11:00:00 |
FLA |
Florida |
D |
Demand |
28222 |
megawatthours |
2025-08-16 11:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
53737 |
megawatthours |
2025-08-16 11:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
54856 |
megawatthours |
2025-08-16 11:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
991 |
megawatthours |
2025-08-16 11:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
999 |
megawatthours |
2025-08-16 11:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
10862 |
megawatthours |
2025-08-16 11:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
10888 |
megawatthours |
2025-08-16 11:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
256 |
megawatthours |
2025-08-16 11:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
226 |
megawatthours |
2025-08-16 11:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
403 |
megawatthours |
2025-08-16 11:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
415 |
megawatthours |
2025-08-16 11:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
6119 |
megawatthours |
2025-08-16 11:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
6346 |
megawatthours |
2025-08-16 11:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
22855 |
megawatthours |
2025-08-16 11:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
24667 |
megawatthours |
2025-08-16 11:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
146 |
megawatthours |
2025-08-16 11:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
151 |
megawatthours |
2025-08-16 11:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
38683 |
megawatthours |
2025-08-16 11:00:00 |
CENT |
Central |
D |
Demand |
35267 |
megawatthours |
2025-08-16 11:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
19935 |
megawatthours |
2025-08-16 11:00:00 |
CAR |
Carolinas |
D |
Demand |
23081 |
megawatthours |
2025-08-16 11:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
27100 |
megawatthours |
2025-08-16 11:00:00 |
CAL |
California |
D |
Demand |
29380 |
megawatthours |
2025-08-16 11:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
5269 |
megawatthours |
2025-08-16 11:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
5757 |
megawatthours |
2025-08-16 11:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
1756 |
megawatthours |
2025-08-16 11:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
1815 |
megawatthours |
2025-08-16 11:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
4432 |
megawatthours |
2025-08-16 11:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
4968 |
megawatthours |
2025-08-16 11:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1107 |
megawatthours |
2025-08-16 11:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1128 |
megawatthours |
2025-08-16 11:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
2277 |
megawatthours |
2025-08-16 10:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
85 |
megawatthours |
2025-08-16 10:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
69 |
megawatthours |
2025-08-16 10:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1095 |
megawatthours |
2025-08-16 10:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
928 |
megawatthours |
2025-08-16 10:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3295 |
megawatthours |
2025-08-16 10:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
3762 |
megawatthours |
2025-08-16 10:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
452865 |
megawatthours |
2025-08-16 10:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
468537 |
megawatthours |
2025-08-16 10:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
17746 |
megawatthours |
2025-08-16 10:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
17143 |
megawatthours |
2025-08-16 10:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
349 |
megawatthours |
2025-08-16 10:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
343 |
megawatthours |
2025-08-16 10:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
317 |
megawatthours |
2025-08-16 10:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
314 |
megawatthours |
2025-08-16 10:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
54436 |
megawatthours |
2025-08-16 10:00:00 |
TEX |
Texas |
D |
Demand |
55563 |
megawatthours |
2025-08-16 10:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
1710 |
megawatthours |
2025-08-16 10:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
1723 |
megawatthours |
2025-08-16 10:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
17746 |
megawatthours |
2025-08-16 10:00:00 |
TEN |
Tennessee |
D |
Demand |
17143 |
megawatthours |
2025-08-16 10:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
2559 |
megawatthours |
2025-08-16 10:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
2529 |
megawatthours |
2025-08-16 10:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
267 |
megawatthours |
2025-08-16 10:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
265 |
megawatthours |
2025-08-16 10:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
39024 |
megawatthours |
2025-08-16 10:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
35546 |
megawatthours |
2025-08-16 10:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
14042 |
megawatthours |
2025-08-16 10:00:00 |
SW |
Southwest |
D |
Demand |
14534 |
megawatthours |
2025-08-16 10:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
4144 |
megawatthours |
2025-08-16 10:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
4220 |
megawatthours |
2025-08-16 10:00:00 |
SPA |
Southwestern Power Administration |
D |
Demand |
21 |
megawatthours |
2025-08-16 10:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
23583 |
megawatthours |
2025-08-16 10:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
23274 |
megawatthours |
2025-08-16 10:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
194 |
megawatthours |
2025-08-16 10:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
229 |
megawatthours |
2025-08-16 10:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
23583 |
megawatthours |
2025-08-16 10:00:00 |
SE |
Southeast |
D |
Demand |
23274 |
megawatthours |
2025-08-16 10:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
785 |
megawatthours |
2025-08-16 10:00:00 |
SCL |
Seattle City Light |
D |
Demand |
787 |
megawatthours |
2025-08-16 10:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
2520 |
megawatthours |
2025-08-16 10:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
2520 |
megawatthours |
2025-08-16 10:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
2908 |
megawatthours |
2025-08-16 10:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2240 |
megawatthours |
2025-08-16 10:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
1964 |
megawatthours |
2025-08-16 10:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
4319 |
megawatthours |
2025-08-16 10:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
4432 |
megawatthours |
2025-08-16 10:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1464 |
megawatthours |
2025-08-16 10:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
1543 |
megawatthours |
2025-08-16 10:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
87330 |
megawatthours |
2025-08-16 10:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
92385 |
megawatthours |
2025-08-16 10:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2277 |
megawatthours |
2025-08-16 10:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2292 |
megawatthours |
2025-08-16 10:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
1974 |
megawatthours |
2025-08-16 10:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2020 |
megawatthours |
2025-08-16 10:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
5838 |
megawatthours |
2025-08-16 10:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
5558 |
megawatthours |
2025-08-16 10:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
16838 |
megawatthours |
2025-08-16 10:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
17350 |
megawatthours |
2025-08-16 10:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
16838 |
megawatthours |
2025-08-16 10:00:00 |
NY |
New York |
D |
Demand |
17350 |
megawatthours |
2025-08-16 10:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1149 |
megawatthours |
2025-08-16 10:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
35728 |
megawatthours |
2025-08-16 10:00:00 |
NW |
Northwest |
D |
Demand |
37791 |
megawatthours |
2025-08-16 10:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
4593 |
megawatthours |
2025-08-16 10:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
5104 |
megawatthours |
2025-08-16 10:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
11320 |
megawatthours |
2025-08-16 10:00:00 |
NE |
New England |
D |
Demand |
11984 |
megawatthours |
2025-08-16 10:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
74227 |
megawatthours |
2025-08-16 10:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
74741 |
megawatthours |
2025-08-16 10:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
77885 |
megawatthours |
2025-08-16 10:00:00 |
MIDW |
Midwest |
D |
Demand |
81038 |
megawatthours |
2025-08-16 10:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
87330 |
megawatthours |
2025-08-16 10:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
92385 |
megawatthours |
2025-08-16 10:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
3658 |
megawatthours |
2025-08-16 10:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
3965 |
megawatthours |
2025-08-16 10:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2266 |
megawatthours |
2025-08-16 10:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
2287 |
megawatthours |
2025-08-16 10:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1387 |
megawatthours |
2025-08-16 10:00:00 |
JEA |
JEA |
D |
Demand |
1448 |
megawatthours |
2025-08-16 10:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
11320 |
megawatthours |
2025-08-16 10:00:00 |
ISNE |
ISO New England |
D |
Demand |
11984 |
megawatthours |
2025-08-16 10:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2287 |
megawatthours |
2025-08-16 10:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
2171 |
megawatthours |
2025-08-16 10:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
458 |
megawatthours |
2025-08-16 10:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
74 |
megawatthours |
2025-08-16 10:00:00 |
HST |
City of Homestead |
D |
Demand |
72 |
megawatthours |
2025-08-16 10:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
184 |
megawatthours |
2025-08-16 10:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
222 |
megawatthours |
2025-08-16 10:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
782 |
megawatthours |
2025-08-16 10:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
797 |
megawatthours |
2025-08-16 10:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
15385 |
megawatthours |
2025-08-16 10:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
15201 |
megawatthours |
2025-08-16 10:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
4925 |
megawatthours |
2025-08-16 10:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
6127 |
megawatthours |
2025-08-16 10:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
2115 |
megawatthours |
2025-08-16 10:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
2045 |
megawatthours |
2025-08-16 10:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
27090 |
megawatthours |
2025-08-16 10:00:00 |
FLA |
Florida |
D |
Demand |
28138 |
megawatthours |
2025-08-16 10:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
54436 |
megawatthours |
2025-08-16 10:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
55563 |
megawatthours |
2025-08-16 10:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1012 |
megawatthours |
2025-08-16 10:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1028 |
megawatthours |
2025-08-16 10:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
10808 |
megawatthours |
2025-08-16 10:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
10803 |
megawatthours |
2025-08-16 10:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
258 |
megawatthours |
2025-08-16 10:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
226 |
megawatthours |
2025-08-16 10:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
394 |
megawatthours |
2025-08-16 10:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
407 |
megawatthours |
2025-08-16 10:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
6073 |
megawatthours |
2025-08-16 10:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
6318 |
megawatthours |
2025-08-16 10:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
23624 |
megawatthours |
2025-08-16 10:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
25875 |
megawatthours |
2025-08-16 10:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
148 |
megawatthours |
2025-08-16 10:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
149 |
megawatthours |
2025-08-16 10:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
39024 |
megawatthours |
2025-08-16 10:00:00 |
CENT |
Central |
D |
Demand |
35567 |
megawatthours |
2025-08-16 10:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
19795 |
megawatthours |
2025-08-16 10:00:00 |
CAR |
Carolinas |
D |
Demand |
22956 |
megawatthours |
2025-08-16 10:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
28049 |
megawatthours |
2025-08-16 10:00:00 |
CAL |
California |
D |
Demand |
30815 |
megawatthours |
2025-08-16 10:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
5369 |
megawatthours |
2025-08-16 10:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
5824 |
megawatthours |
2025-08-16 10:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
1842 |
megawatthours |
2025-08-16 10:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
1881 |
megawatthours |
2025-08-16 10:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
4617 |
megawatthours |
2025-08-16 10:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
5092 |
megawatthours |
2025-08-16 10:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1129 |
megawatthours |
2025-08-16 10:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1144 |
megawatthours |
2025-08-16 10:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
2332 |
megawatthours |
2025-08-16 09:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
84 |
megawatthours |
2025-08-16 09:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
71 |
megawatthours |
2025-08-16 09:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1133 |
megawatthours |
2025-08-16 09:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
967 |
megawatthours |
2025-08-16 09:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3357 |
megawatthours |
2025-08-16 09:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
3784 |
megawatthours |
2025-08-16 09:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
458973 |
megawatthours |
2025-08-16 09:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
474887 |
megawatthours |
2025-08-16 09:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
18034 |
megawatthours |
2025-08-16 09:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
17061 |
megawatthours |
2025-08-16 09:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
368 |
megawatthours |
2025-08-16 09:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
353 |
megawatthours |
2025-08-16 09:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
335 |
megawatthours |
2025-08-16 09:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
333 |
megawatthours |
2025-08-16 09:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
55636 |
megawatthours |
2025-08-16 09:00:00 |
TEX |
Texas |
D |
Demand |
56877 |
megawatthours |
2025-08-16 09:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
1760 |
megawatthours |
2025-08-16 09:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
1783 |
megawatthours |
2025-08-16 09:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
18034 |
megawatthours |
2025-08-16 09:00:00 |
TEN |
Tennessee |
D |
Demand |
17061 |
megawatthours |
2025-08-16 09:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
2575 |
megawatthours |
2025-08-16 09:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
2525 |
megawatthours |
2025-08-16 09:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
261 |
megawatthours |
2025-08-16 09:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
266 |
megawatthours |
2025-08-16 09:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
39709 |
megawatthours |
2025-08-16 09:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
36237 |
megawatthours |
2025-08-16 09:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
14177 |
megawatthours |
2025-08-16 09:00:00 |
SW |
Southwest |
D |
Demand |
15044 |
megawatthours |
2025-08-16 09:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
4360 |
megawatthours |
2025-08-16 09:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
4381 |
megawatthours |
2025-08-16 09:00:00 |
SPA |
Southwestern Power Administration |
D |
Demand |
29 |
megawatthours |
2025-08-16 09:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
23707 |
megawatthours |
2025-08-16 09:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
23391 |
megawatthours |
2025-08-16 09:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
193 |
megawatthours |
2025-08-16 09:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
230 |
megawatthours |
2025-08-16 09:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
23707 |
megawatthours |
2025-08-16 09:00:00 |
SE |
Southeast |
D |
Demand |
23391 |
megawatthours |
2025-08-16 09:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
816 |
megawatthours |
2025-08-16 09:00:00 |
SCL |
Seattle City Light |
D |
Demand |
834 |
megawatthours |
2025-08-16 09:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
2542 |
megawatthours |
2025-08-16 09:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
2542 |
megawatthours |
2025-08-16 09:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
2899 |
megawatthours |
2025-08-16 09:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2263 |
megawatthours |
2025-08-16 09:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2059 |
megawatthours |
2025-08-16 09:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
4440 |
megawatthours |
2025-08-16 09:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
4586 |
megawatthours |
2025-08-16 09:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1512 |
megawatthours |
2025-08-16 09:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
1573 |
megawatthours |
2025-08-16 09:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
87285 |
megawatthours |
2025-08-16 09:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
92609 |
megawatthours |
2025-08-16 09:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2386 |
megawatthours |
2025-08-16 09:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2364 |
megawatthours |
2025-08-16 09:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2049 |
megawatthours |
2025-08-16 09:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2079 |
megawatthours |
2025-08-16 09:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
6046 |
megawatthours |
2025-08-16 09:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
5541 |
megawatthours |
2025-08-16 09:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
16824 |
megawatthours |
2025-08-16 09:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
17317 |
megawatthours |
2025-08-16 09:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
16824 |
megawatthours |
2025-08-16 09:00:00 |
NY |
New York |
D |
Demand |
17317 |
megawatthours |
2025-08-16 09:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1173 |
megawatthours |
2025-08-16 09:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
36982 |
megawatthours |
2025-08-16 09:00:00 |
NW |
Northwest |
D |
Demand |
38760 |
megawatthours |
2025-08-16 09:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
4827 |
megawatthours |
2025-08-16 09:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
5345 |
megawatthours |
2025-08-16 09:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
11230 |
megawatthours |
2025-08-16 09:00:00 |
NE |
New England |
D |
Demand |
11946 |
megawatthours |
2025-08-16 09:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
74935 |
megawatthours |
2025-08-16 09:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
75533 |
megawatthours |
2025-08-16 09:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
78656 |
megawatthours |
2025-08-16 09:00:00 |
MIDW |
Midwest |
D |
Demand |
81964 |
megawatthours |
2025-08-16 09:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
87285 |
megawatthours |
2025-08-16 09:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
92609 |
megawatthours |
2025-08-16 09:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
3721 |
megawatthours |
2025-08-16 09:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
4024 |
megawatthours |
2025-08-16 09:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2382 |
megawatthours |
2025-08-16 09:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
2420 |
megawatthours |
2025-08-16 09:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1442 |
megawatthours |
2025-08-16 09:00:00 |
JEA |
JEA |
D |
Demand |
1454 |
megawatthours |
2025-08-16 09:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
11230 |
megawatthours |
2025-08-16 09:00:00 |
ISNE |
ISO New England |
D |
Demand |
11946 |
megawatthours |
2025-08-16 09:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2439 |
megawatthours |
2025-08-16 09:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
2243 |
megawatthours |
2025-08-16 09:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
503 |
megawatthours |
2025-08-16 09:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
74 |
megawatthours |
2025-08-16 09:00:00 |
HST |
City of Homestead |
D |
Demand |
73 |
megawatthours |
2025-08-16 09:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
182 |
megawatthours |
2025-08-16 09:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
224 |
megawatthours |
2025-08-16 09:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
780 |
megawatthours |
2025-08-16 09:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
804 |
megawatthours |
2025-08-16 09:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
15528 |
megawatthours |
2025-08-16 09:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
15400 |
megawatthours |
2025-08-16 09:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
4984 |
megawatthours |
2025-08-16 09:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
6137 |
megawatthours |
2025-08-16 09:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
2110 |
megawatthours |
2025-08-16 09:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
2039 |
megawatthours |
2025-08-16 09:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
27349 |
megawatthours |
2025-08-16 09:00:00 |
FLA |
Florida |
D |
Demand |
28348 |
megawatthours |
2025-08-16 09:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
55636 |
megawatthours |
2025-08-16 09:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
56877 |
megawatthours |
2025-08-16 09:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1051 |
megawatthours |
2025-08-16 09:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1061 |
megawatthours |
2025-08-16 09:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
10858 |
megawatthours |
2025-08-16 09:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
10814 |
megawatthours |
2025-08-16 09:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
262 |
megawatthours |
2025-08-16 09:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
230 |
megawatthours |
2025-08-16 09:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
393 |
megawatthours |
2025-08-16 09:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
402 |
megawatthours |
2025-08-16 09:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
6086 |
megawatthours |
2025-08-16 09:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
6354 |
megawatthours |
2025-08-16 09:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
24827 |
megawatthours |
2025-08-16 09:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
27027 |
megawatthours |
2025-08-16 09:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
153 |
megawatthours |
2025-08-16 09:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
158 |
megawatthours |
2025-08-16 09:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
39709 |
megawatthours |
2025-08-16 09:00:00 |
CENT |
Central |
D |
Demand |
36266 |
megawatthours |
2025-08-16 09:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
19879 |
megawatthours |
2025-08-16 09:00:00 |
CAR |
Carolinas |
D |
Demand |
23011 |
megawatthours |
2025-08-16 09:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
29505 |
megawatthours |
2025-08-16 09:00:00 |
CAL |
California |
D |
Demand |
32293 |
megawatthours |
2025-08-16 09:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
5549 |
megawatthours |
2025-08-16 09:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
5960 |
megawatthours |
2025-08-16 09:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
1961 |
megawatthours |
2025-08-16 09:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
2010 |
megawatthours |
2025-08-16 09:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
4361 |
megawatthours |
2025-08-16 09:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
5279 |
megawatthours |
2025-08-16 09:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1163 |
megawatthours |
2025-08-16 09:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1176 |
megawatthours |
2025-08-16 09:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
2407 |
megawatthours |
2025-08-16 08:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
84 |
megawatthours |
2025-08-16 08:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
75 |
megawatthours |
2025-08-16 08:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1189 |
megawatthours |
2025-08-16 08:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
1015 |
megawatthours |
2025-08-16 08:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3420 |
megawatthours |
2025-08-16 08:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
3932 |
megawatthours |
2025-08-16 08:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
469857 |
megawatthours |
2025-08-16 08:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
489066 |
megawatthours |
2025-08-16 08:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
18546 |
megawatthours |
2025-08-16 08:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
18106 |
megawatthours |
2025-08-16 08:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
388 |
megawatthours |
2025-08-16 08:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
378 |
megawatthours |
2025-08-16 08:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
360 |
megawatthours |
2025-08-16 08:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
361 |
megawatthours |
2025-08-16 08:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
57303 |
megawatthours |
2025-08-16 08:00:00 |
TEX |
Texas |
D |
Demand |
58493 |
megawatthours |
2025-08-16 08:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
1798 |
megawatthours |
2025-08-16 08:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
1854 |
megawatthours |
2025-08-16 08:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
18546 |
megawatthours |
2025-08-16 08:00:00 |
TEN |
Tennessee |
D |
Demand |
18106 |
megawatthours |
2025-08-16 08:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
2619 |
megawatthours |
2025-08-16 08:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
2589 |
megawatthours |
2025-08-16 08:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
266 |
megawatthours |
2025-08-16 08:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
271 |
megawatthours |
2025-08-16 08:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
40633 |
megawatthours |
2025-08-16 08:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
37214 |
megawatthours |
2025-08-16 08:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
15010 |
megawatthours |
2025-08-16 08:00:00 |
SW |
Southwest |
D |
Demand |
15780 |
megawatthours |
2025-08-16 08:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
4650 |
megawatthours |
2025-08-16 08:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
4722 |
megawatthours |
2025-08-16 08:00:00 |
SPA |
Southwestern Power Administration |
D |
Demand |
23 |
megawatthours |
2025-08-16 08:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
24086 |
megawatthours |
2025-08-16 08:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
23934 |
megawatthours |
2025-08-16 08:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
195 |
megawatthours |
2025-08-16 08:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
237 |
megawatthours |
2025-08-16 08:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
24086 |
megawatthours |
2025-08-16 08:00:00 |
SE |
Southeast |
D |
Demand |
23934 |
megawatthours |
2025-08-16 08:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
857 |
megawatthours |
2025-08-16 08:00:00 |
SCL |
Seattle City Light |
D |
Demand |
882 |
megawatthours |
2025-08-16 08:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
2566 |
megawatthours |
2025-08-16 08:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
2566 |
megawatthours |
2025-08-16 08:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
2916 |
megawatthours |
2025-08-16 08:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2322 |
megawatthours |
2025-08-16 08:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2190 |
megawatthours |
2025-08-16 08:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
4655 |
megawatthours |
2025-08-16 08:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
4822 |
megawatthours |
2025-08-16 08:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1574 |
megawatthours |
2025-08-16 08:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
1614 |
megawatthours |
2025-08-16 08:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
87799 |
megawatthours |
2025-08-16 08:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
95065 |
megawatthours |
2025-08-16 08:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2315 |
megawatthours |
2025-08-16 08:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2458 |
megawatthours |
2025-08-16 08:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2156 |
megawatthours |
2025-08-16 08:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2176 |
megawatthours |
2025-08-16 08:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
6348 |
megawatthours |
2025-08-16 08:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
5785 |
megawatthours |
2025-08-16 08:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
17086 |
megawatthours |
2025-08-16 08:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
17559 |
megawatthours |
2025-08-16 08:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
17086 |
megawatthours |
2025-08-16 08:00:00 |
NY |
New York |
D |
Demand |
17559 |
megawatthours |
2025-08-16 08:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1203 |
megawatthours |
2025-08-16 08:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
38279 |
megawatthours |
2025-08-16 08:00:00 |
NW |
Northwest |
D |
Demand |
40442 |
megawatthours |
2025-08-16 08:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
5089 |
megawatthours |
2025-08-16 08:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
5606 |
megawatthours |
2025-08-16 08:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
11300 |
megawatthours |
2025-08-16 08:00:00 |
NE |
New England |
D |
Demand |
12089 |
megawatthours |
2025-08-16 08:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
76679 |
megawatthours |
2025-08-16 08:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
76976 |
megawatthours |
2025-08-16 08:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
80526 |
megawatthours |
2025-08-16 08:00:00 |
MIDW |
Midwest |
D |
Demand |
83627 |
megawatthours |
2025-08-16 08:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
87799 |
megawatthours |
2025-08-16 08:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
95065 |
megawatthours |
2025-08-16 08:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
3847 |
megawatthours |
2025-08-16 08:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
4137 |
megawatthours |
2025-08-16 08:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2524 |
megawatthours |
2025-08-16 08:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
2554 |
megawatthours |
2025-08-16 08:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1484 |
megawatthours |
2025-08-16 08:00:00 |
JEA |
JEA |
D |
Demand |
1492 |
megawatthours |
2025-08-16 08:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
11300 |
megawatthours |
2025-08-16 08:00:00 |
ISNE |
ISO New England |
D |
Demand |
12089 |
megawatthours |
2025-08-16 08:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2430 |
megawatthours |
2025-08-16 08:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
2336 |
megawatthours |
2025-08-16 08:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
543 |
megawatthours |
2025-08-16 08:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
74 |
megawatthours |
2025-08-16 08:00:00 |
HST |
City of Homestead |
D |
Demand |
76 |
megawatthours |
2025-08-16 08:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
185 |
megawatthours |
2025-08-16 08:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
230 |
megawatthours |
2025-08-16 08:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
787 |
megawatthours |
2025-08-16 08:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
814 |
megawatthours |
2025-08-16 08:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
15705 |
megawatthours |
2025-08-16 08:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
15905 |
megawatthours |
2025-08-16 08:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
5126 |
megawatthours |
2025-08-16 08:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
6299 |
megawatthours |
2025-08-16 08:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
2120 |
megawatthours |
2025-08-16 08:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
2088 |
megawatthours |
2025-08-16 08:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
27774 |
megawatthours |
2025-08-16 08:00:00 |
FLA |
Florida |
D |
Demand |
29187 |
megawatthours |
2025-08-16 08:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
57303 |
megawatthours |
2025-08-16 08:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
58493 |
megawatthours |
2025-08-16 08:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1109 |
megawatthours |
2025-08-16 08:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1114 |
megawatthours |
2025-08-16 08:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
11092 |
megawatthours |
2025-08-16 08:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
11035 |
megawatthours |
2025-08-16 08:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
267 |
megawatthours |
2025-08-16 08:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
234 |
megawatthours |
2025-08-16 08:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
398 |
megawatthours |
2025-08-16 08:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
409 |
megawatthours |
2025-08-16 08:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
6192 |
megawatthours |
2025-08-16 08:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
6505 |
megawatthours |
2025-08-16 08:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
26281 |
megawatthours |
2025-08-16 08:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
28492 |
megawatthours |
2025-08-16 08:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
158 |
megawatthours |
2025-08-16 08:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
161 |
megawatthours |
2025-08-16 08:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
40633 |
megawatthours |
2025-08-16 08:00:00 |
CENT |
Central |
D |
Demand |
37237 |
megawatthours |
2025-08-16 08:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
20248 |
megawatthours |
2025-08-16 08:00:00 |
CAR |
Carolinas |
D |
Demand |
23431 |
megawatthours |
2025-08-16 08:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
31267 |
megawatthours |
2025-08-16 08:00:00 |
CAL |
California |
D |
Demand |
34117 |
megawatthours |
2025-08-16 08:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
5815 |
megawatthours |
2025-08-16 08:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
6157 |
megawatthours |
2025-08-16 08:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2102 |
megawatthours |
2025-08-16 08:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
2167 |
megawatthours |
2025-08-16 08:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
4690 |
megawatthours |
2025-08-16 08:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
5461 |
megawatthours |
2025-08-16 08:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1188 |
megawatthours |
2025-08-16 08:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1233 |
megawatthours |
2025-08-16 08:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
2514 |
megawatthours |
2025-08-16 07:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
86 |
megawatthours |
2025-08-16 07:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
73 |
megawatthours |
2025-08-16 07:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1379 |
megawatthours |
2025-08-16 07:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
389 |
megawatthours |
2025-08-16 07:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3549 |
megawatthours |
2025-08-16 07:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
4043 |
megawatthours |
2025-08-16 07:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
79661 |
megawatthours |
2025-08-16 07:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
507256 |
megawatthours |
2025-08-16 07:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
19381 |
megawatthours |
2025-08-16 07:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
18896 |
megawatthours |
2025-08-16 07:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
397 |
megawatthours |
2025-08-16 07:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
409 |
megawatthours |
2025-08-16 07:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
403 |
megawatthours |
2025-08-16 07:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
394 |
megawatthours |
2025-08-16 07:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
59623 |
megawatthours |
2025-08-16 07:00:00 |
TEX |
Texas |
D |
Demand |
60314 |
megawatthours |
2025-08-16 07:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
1943 |
megawatthours |
2025-08-16 07:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
1952 |
megawatthours |
2025-08-16 07:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
19381 |
megawatthours |
2025-08-16 07:00:00 |
TEN |
Tennessee |
D |
Demand |
18896 |
megawatthours |
2025-08-16 07:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
2704 |
megawatthours |
2025-08-16 07:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
2698 |
megawatthours |
2025-08-16 07:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
275 |
megawatthours |
2025-08-16 07:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
284 |
megawatthours |
2025-08-16 07:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
41769 |
megawatthours |
2025-08-16 07:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
38508 |
megawatthours |
2025-08-16 07:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
16295 |
megawatthours |
2025-08-16 07:00:00 |
SW |
Southwest |
D |
Demand |
15900 |
megawatthours |
2025-08-16 07:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
5284 |
megawatthours |
2025-08-16 07:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
5003 |
megawatthours |
2025-08-16 07:00:00 |
SPA |
Southwestern Power Administration |
D |
Demand |
24 |
megawatthours |
2025-08-16 07:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
24891 |
megawatthours |
2025-08-16 07:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
24890 |
megawatthours |
2025-08-16 07:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
203 |
megawatthours |
2025-08-16 07:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
248 |
megawatthours |
2025-08-16 07:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
24891 |
megawatthours |
2025-08-16 07:00:00 |
SE |
Southeast |
D |
Demand |
24890 |
megawatthours |
2025-08-16 07:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
865 |
megawatthours |
2025-08-16 07:00:00 |
SCL |
Seattle City Light |
D |
Demand |
948 |
megawatthours |
2025-08-16 07:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
2633 |
megawatthours |
2025-08-16 07:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
2633 |
megawatthours |
2025-08-16 07:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
3001 |
megawatthours |
2025-08-16 07:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2518 |
megawatthours |
2025-08-16 07:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2355 |
megawatthours |
2025-08-16 07:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
5005 |
megawatthours |
2025-08-16 07:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
5175 |
megawatthours |
2025-08-16 07:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1634 |
megawatthours |
2025-08-16 07:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
1682 |
megawatthours |
2025-08-16 07:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
89840 |
megawatthours |
2025-08-16 07:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
98262 |
megawatthours |
2025-08-16 07:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2633 |
megawatthours |
2025-08-16 07:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2598 |
megawatthours |
2025-08-16 07:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2298 |
megawatthours |
2025-08-16 07:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2315 |
megawatthours |
2025-08-16 07:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
6701 |
megawatthours |
2025-08-16 07:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
6187 |
megawatthours |
2025-08-16 07:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
17558 |
megawatthours |
2025-08-16 07:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
18029 |
megawatthours |
2025-08-16 07:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
17558 |
megawatthours |
2025-08-16 07:00:00 |
NY |
New York |
D |
Demand |
18029 |
megawatthours |
2025-08-16 07:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1275 |
megawatthours |
2025-08-16 07:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
29047 |
megawatthours |
2025-08-16 07:00:00 |
NW |
Northwest |
D |
Demand |
42877 |
megawatthours |
2025-08-16 07:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
5668 |
megawatthours |
2025-08-16 07:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
6045 |
megawatthours |
2025-08-16 07:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
11580 |
megawatthours |
2025-08-16 07:00:00 |
NE |
New England |
D |
Demand |
12385 |
megawatthours |
2025-08-16 07:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
79283 |
megawatthours |
2025-08-16 07:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
79076 |
megawatthours |
2025-08-16 07:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
83317 |
megawatthours |
2025-08-16 07:00:00 |
MIDW |
Midwest |
D |
Demand |
86141 |
megawatthours |
2025-08-16 07:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
89840 |
megawatthours |
2025-08-16 07:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
98262 |
megawatthours |
2025-08-16 07:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
4034 |
megawatthours |
2025-08-16 07:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
4414 |
megawatthours |
2025-08-16 07:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2708 |
megawatthours |
2025-08-16 07:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
2732 |
megawatthours |
2025-08-16 07:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1543 |
megawatthours |
2025-08-16 07:00:00 |
JEA |
JEA |
D |
Demand |
1540 |
megawatthours |
2025-08-16 07:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
11580 |
megawatthours |
2025-08-16 07:00:00 |
ISNE |
ISO New England |
D |
Demand |
12385 |
megawatthours |
2025-08-16 07:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2569 |
megawatthours |
2025-08-16 07:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
2481 |
megawatthours |
2025-08-16 07:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
561 |
megawatthours |
2025-08-16 07:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
594 |
megawatthours |
2025-08-16 07:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
76 |
megawatthours |
2025-08-16 07:00:00 |
HST |
City of Homestead |
D |
Demand |
80 |
megawatthours |
2025-08-16 07:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
190 |
megawatthours |
2025-08-16 07:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
242 |
megawatthours |
2025-08-16 07:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
783 |
megawatthours |
2025-08-16 07:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
827 |
megawatthours |
2025-08-16 07:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
16519 |
megawatthours |
2025-08-16 07:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
16649 |
megawatthours |
2025-08-16 07:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
5364 |
megawatthours |
2025-08-16 07:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
6575 |
megawatthours |
2025-08-16 07:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
2180 |
megawatthours |
2025-08-16 07:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
2167 |
megawatthours |
2025-08-16 07:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
29054 |
megawatthours |
2025-08-16 07:00:00 |
FLA |
Florida |
D |
Demand |
30483 |
megawatthours |
2025-08-16 07:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
59623 |
megawatthours |
2025-08-16 07:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
60314 |
megawatthours |
2025-08-16 07:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1195 |
megawatthours |
2025-08-16 07:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1186 |
megawatthours |
2025-08-16 07:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
11525 |
megawatthours |
2025-08-16 07:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
11431 |
megawatthours |
2025-08-16 07:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
283 |
megawatthours |
2025-08-16 07:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
243 |
megawatthours |
2025-08-16 07:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
412 |
megawatthours |
2025-08-16 07:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
425 |
megawatthours |
2025-08-16 07:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
6435 |
megawatthours |
2025-08-16 07:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
6758 |
megawatthours |
2025-08-16 07:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
28316 |
megawatthours |
2025-08-16 07:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
30273 |
megawatthours |
2025-08-16 07:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
170 |
megawatthours |
2025-08-16 07:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
170 |
megawatthours |
2025-08-16 07:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
41769 |
megawatthours |
2025-08-16 07:00:00 |
CENT |
Central |
D |
Demand |
38532 |
megawatthours |
2025-08-16 07:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
21005 |
megawatthours |
2025-08-16 07:00:00 |
CAR |
Carolinas |
D |
Demand |
24248 |
megawatthours |
2025-08-16 07:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
34319 |
megawatthours |
2025-08-16 07:00:00 |
CAL |
California |
D |
Demand |
36299 |
megawatthours |
2025-08-16 07:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6049 |
megawatthours |
2025-08-16 07:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
6429 |
megawatthours |
2025-08-16 07:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2331 |
megawatthours |
2025-08-16 07:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
2306 |
megawatthours |
2025-08-16 07:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
4860 |
megawatthours |
2025-08-16 07:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
5688 |
megawatthours |
2025-08-16 07:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1265 |
megawatthours |
2025-08-16 07:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1304 |
megawatthours |
2025-08-16 07:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
2651 |
megawatthours |
2025-08-16 06:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
93 |
megawatthours |
2025-08-16 06:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
78 |
megawatthours |
2025-08-16 06:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
TI |
Total interchange |
752 |
megawatthours |
2025-08-16 06:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
NG |
Net generation |
1946 |
megawatthours |
2025-08-16 06:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1430 |
megawatthours |
2025-08-16 06:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
1194 |
megawatthours |
2025-08-16 06:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
TI |
Total interchange |
400 |
megawatthours |
2025-08-16 06:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
NG |
Net generation |
4576 |
megawatthours |
2025-08-16 06:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3581 |
megawatthours |
2025-08-16 06:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
4176 |
megawatthours |
2025-08-16 06:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
97936 |
megawatthours |
2025-08-16 06:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
532182 |
megawatthours |
2025-08-16 06:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
20369 |
megawatthours |
2025-08-16 06:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
19900 |
megawatthours |
2025-08-16 06:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
TI |
Total interchange |
-327 |
megawatthours |
2025-08-16 06:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
NG |
Net generation |
106 |
megawatthours |
2025-08-16 06:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
430 |
megawatthours |
2025-08-16 06:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
433 |
megawatthours |
2025-08-16 06:00:00 |
TIDC |
Turlock Irrigation District |
TI |
Total interchange |
-135 |
megawatthours |
2025-08-16 06:00:00 |
TIDC |
Turlock Irrigation District |
NG |
Net generation |
299 |
megawatthours |
2025-08-16 06:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
444 |
megawatthours |
2025-08-16 06:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
436 |
megawatthours |
2025-08-16 06:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
62436 |
megawatthours |
2025-08-16 06:00:00 |
TEX |
Texas |
D |
Demand |
62878 |
megawatthours |
2025-08-16 06:00:00 |
TEPC |
Tucson Electric Power |
TI |
Total interchange |
-185 |
megawatthours |
2025-08-16 06:00:00 |
TEPC |
Tucson Electric Power |
NG |
Net generation |
1863 |
megawatthours |
2025-08-16 06:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2089 |
megawatthours |
2025-08-16 06:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
2048 |
megawatthours |
2025-08-16 06:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
20369 |
megawatthours |
2025-08-16 06:00:00 |
TEN |
Tennessee |
D |
Demand |
19900 |
megawatthours |
2025-08-16 06:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
2830 |
megawatthours |
2025-08-16 06:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
2829 |
megawatthours |
2025-08-16 06:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
288 |
megawatthours |
2025-08-16 06:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
299 |
megawatthours |
2025-08-16 06:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
43315 |
megawatthours |
2025-08-16 06:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
40276 |
megawatthours |
2025-08-16 06:00:00 |
SW |
Southwest |
TI |
Total interchange |
977 |
megawatthours |
2025-08-16 06:00:00 |
SW |
Southwest |
NG |
Net generation |
18663 |
megawatthours |
2025-08-16 06:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
17521 |
megawatthours |
2025-08-16 06:00:00 |
SW |
Southwest |
D |
Demand |
17681 |
megawatthours |
2025-08-16 06:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
TI |
Total interchange |
3624 |
megawatthours |
2025-08-16 06:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
NG |
Net generation |
8928 |
megawatthours |
2025-08-16 06:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
5621 |
megawatthours |
2025-08-16 06:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
5303 |
megawatthours |
2025-08-16 06:00:00 |
SPA |
Southwestern Power Administration |
D |
Demand |
21 |
megawatthours |
2025-08-16 06:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
26091 |
megawatthours |
2025-08-16 06:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
26091 |
megawatthours |
2025-08-16 06:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
213 |
megawatthours |
2025-08-16 06:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
264 |
megawatthours |
2025-08-16 06:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
26091 |
megawatthours |
2025-08-16 06:00:00 |
SE |
Southeast |
D |
Demand |
26091 |
megawatthours |
2025-08-16 06:00:00 |
SCL |
Seattle City Light |
TI |
Total interchange |
-744 |
megawatthours |
2025-08-16 06:00:00 |
SCL |
Seattle City Light |
NG |
Net generation |
253 |
megawatthours |
2025-08-16 06:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
913 |
megawatthours |
2025-08-16 06:00:00 |
SCL |
Seattle City Light |
D |
Demand |
997 |
megawatthours |
2025-08-16 06:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
2713 |
megawatthours |
2025-08-16 06:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
2713 |
megawatthours |
2025-08-16 06:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
3132 |
megawatthours |
2025-08-16 06:00:00 |
PSEI |
Puget Sound Energy, Inc. |
TI |
Total interchange |
-1739 |
megawatthours |
2025-08-16 06:00:00 |
PSEI |
Puget Sound Energy, Inc. |
NG |
Net generation |
791 |
megawatthours |
2025-08-16 06:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2606 |
megawatthours |
2025-08-16 06:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2530 |
megawatthours |
2025-08-16 06:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
5546 |
megawatthours |
2025-08-16 06:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
5920 |
megawatthours |
2025-08-16 06:00:00 |
PNM |
Public Service Company of New Mexico |
TI |
Total interchange |
-773 |
megawatthours |
2025-08-16 06:00:00 |
PNM |
Public Service Company of New Mexico |
NG |
Net generation |
1006 |
megawatthours |
2025-08-16 06:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1739 |
megawatthours |
2025-08-16 06:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
1775 |
megawatthours |
2025-08-16 06:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
93102 |
megawatthours |
2025-08-16 06:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
102404 |
megawatthours |
2025-08-16 06:00:00 |
PGE |
Portland General Electric Company |
TI |
Total interchange |
-1321 |
megawatthours |
2025-08-16 06:00:00 |
PGE |
Portland General Electric Company |
NG |
Net generation |
1445 |
megawatthours |
2025-08-16 06:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2810 |
megawatthours |
2025-08-16 06:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2766 |
megawatthours |
2025-08-16 06:00:00 |
PACW |
PacifiCorp West |
TI |
Total interchange |
-1912 |
megawatthours |
2025-08-16 06:00:00 |
PACW |
PacifiCorp West |
NG |
Net generation |
558 |
megawatthours |
2025-08-16 06:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2486 |
megawatthours |
2025-08-16 06:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2470 |
megawatthours |
2025-08-16 06:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
7166 |
megawatthours |
2025-08-16 06:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
6632 |
megawatthours |
2025-08-16 06:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
18242 |
megawatthours |
2025-08-16 06:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
18714 |
megawatthours |
2025-08-16 06:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
18242 |
megawatthours |
2025-08-16 06:00:00 |
NY |
New York |
D |
Demand |
18714 |
megawatthours |
2025-08-16 06:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1366 |
megawatthours |
2025-08-16 06:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
43533 |
megawatthours |
2025-08-16 06:00:00 |
NW |
Northwest |
D |
Demand |
45729 |
megawatthours |
2025-08-16 06:00:00 |
NEVP |
Nevada Power Company |
TI |
Total interchange |
-579 |
megawatthours |
2025-08-16 06:00:00 |
NEVP |
Nevada Power Company |
NG |
Net generation |
3926 |
megawatthours |
2025-08-16 06:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
6076 |
megawatthours |
2025-08-16 06:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
6311 |
megawatthours |
2025-08-16 06:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
12140 |
megawatthours |
2025-08-16 06:00:00 |
NE |
New England |
D |
Demand |
12530 |
megawatthours |
2025-08-16 06:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
82938 |
megawatthours |
2025-08-16 06:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
82299 |
megawatthours |
2025-08-16 06:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
87188 |
megawatthours |
2025-08-16 06:00:00 |
MIDW |
Midwest |
D |
Demand |
89880 |
megawatthours |
2025-08-16 06:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
93102 |
megawatthours |
2025-08-16 06:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
102404 |
megawatthours |
2025-08-16 06:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
4250 |
megawatthours |
2025-08-16 06:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
4725 |
megawatthours |
2025-08-16 06:00:00 |
LDWP |
Los Angeles Department of Water and Power |
TI |
Total interchange |
-395 |
megawatthours |
2025-08-16 06:00:00 |
LDWP |
Los Angeles Department of Water and Power |
NG |
Net generation |
2385 |
megawatthours |
2025-08-16 06:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2885 |
megawatthours |
2025-08-16 06:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
2780 |
megawatthours |
2025-08-16 06:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1622 |
megawatthours |
2025-08-16 06:00:00 |
JEA |
JEA |
D |
Demand |
1605 |
megawatthours |
2025-08-16 06:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
12140 |
megawatthours |
2025-08-16 06:00:00 |
ISNE |
ISO New England |
D |
Demand |
12530 |
megawatthours |
2025-08-16 06:00:00 |
IPCO |
Idaho Power Company |
TI |
Total interchange |
-808 |
megawatthours |
2025-08-16 06:00:00 |
IPCO |
Idaho Power Company |
NG |
Net generation |
1858 |
megawatthours |
2025-08-16 06:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2765 |
megawatthours |
2025-08-16 06:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
2668 |
megawatthours |
2025-08-16 06:00:00 |
IID |
Imperial Irrigation District |
NG |
Net generation |
651 |
megawatthours |
2025-08-16 06:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
618 |
megawatthours |
2025-08-16 06:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
655 |
megawatthours |
2025-08-16 06:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
80 |
megawatthours |
2025-08-16 06:00:00 |
HST |
City of Homestead |
D |
Demand |
85 |
megawatthours |
2025-08-16 06:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
196 |
megawatthours |
2025-08-16 06:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
257 |
megawatthours |
2025-08-16 06:00:00 |
GRID |
Gridforce Energy Management, LLC |
TI |
Total interchange |
2095 |
megawatthours |
2025-08-16 06:00:00 |
GRID |
Gridforce Energy Management, LLC |
NG |
Net generation |
2095 |
megawatthours |
2025-08-16 06:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
TI |
Total interchange |
393 |
megawatthours |
2025-08-16 06:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
NG |
Net generation |
1232 |
megawatthours |
2025-08-16 06:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
792 |
megawatthours |
2025-08-16 06:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
839 |
megawatthours |
2025-08-16 06:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
17378 |
megawatthours |
2025-08-16 06:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
17581 |
megawatthours |
2025-08-16 06:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
5709 |
megawatthours |
2025-08-16 06:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
6971 |
megawatthours |
2025-08-16 06:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
2290 |
megawatthours |
2025-08-16 06:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
2280 |
megawatthours |
2025-08-16 06:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
30606 |
megawatthours |
2025-08-16 06:00:00 |
FLA |
Florida |
D |
Demand |
32171 |
megawatthours |
2025-08-16 06:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
62436 |
megawatthours |
2025-08-16 06:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
62878 |
megawatthours |
2025-08-16 06:00:00 |
EPE |
El Paso Electric Company |
TI |
Total interchange |
-241 |
megawatthours |
2025-08-16 06:00:00 |
EPE |
El Paso Electric Company |
NG |
Net generation |
1046 |
megawatthours |
2025-08-16 06:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1291 |
megawatthours |
2025-08-16 06:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1287 |
megawatthours |
2025-08-16 06:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
12176 |
megawatthours |
2025-08-16 06:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
11966 |
megawatthours |
2025-08-16 06:00:00 |
DOPD |
PUD No. 1 of Douglas County |
TI |
Total interchange |
312 |
megawatthours |
2025-08-16 06:00:00 |
DOPD |
PUD No. 1 of Douglas County |
NG |
Net generation |
561 |
megawatthours |
2025-08-16 06:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
288 |
megawatthours |
2025-08-16 06:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
249 |
megawatthours |
2025-08-16 06:00:00 |
DEAA |
Arlington Valley, LLC |
TI |
Total interchange |
485 |
megawatthours |
2025-08-16 06:00:00 |
DEAA |
Arlington Valley, LLC |
NG |
Net generation |
485 |
megawatthours |
2025-08-16 06:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
434 |
megawatthours |
2025-08-16 06:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
445 |
megawatthours |
2025-08-16 06:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
6814 |
megawatthours |
2025-08-16 06:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
7094 |
megawatthours |
2025-08-16 06:00:00 |
CISO |
California Independent System Operator |
TI |
Total interchange |
-5445 |
megawatthours |
2025-08-16 06:00:00 |
CISO |
California Independent System Operator |
NG |
Net generation |
26568 |
megawatthours |
2025-08-16 06:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
30368 |
megawatthours |
2025-08-16 06:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
32128 |
megawatthours |
2025-08-16 06:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
TI |
Total interchange |
952 |
megawatthours |
2025-08-16 06:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
NG |
Net generation |
1134 |
megawatthours |
2025-08-16 06:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
180 |
megawatthours |
2025-08-16 06:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
182 |
megawatthours |
2025-08-16 06:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
43315 |
megawatthours |
2025-08-16 06:00:00 |
CENT |
Central |
D |
Demand |
40297 |
megawatthours |
2025-08-16 06:00:00 |
CAR |
Carolinas |
NG |
Net generation |
22724 |
megawatthours |
2025-08-16 06:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
22137 |
megawatthours |
2025-08-16 06:00:00 |
CAR |
Carolinas |
D |
Demand |
25350 |
megawatthours |
2025-08-16 06:00:00 |
CAL |
California |
TI |
Total interchange |
-6108 |
megawatthours |
2025-08-16 06:00:00 |
CAL |
California |
NG |
Net generation |
32328 |
megawatthours |
2025-08-16 06:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
36882 |
megawatthours |
2025-08-16 06:00:00 |
CAL |
California |
D |
Demand |
38557 |
megawatthours |
2025-08-16 06:00:00 |
BPAT |
Bonneville Power Administration |
TI |
Total interchange |
1877 |
megawatthours |
2025-08-16 06:00:00 |
BPAT |
Bonneville Power Administration |
NG |
Net generation |
8603 |
megawatthours |
2025-08-16 06:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6429 |
megawatthours |
2025-08-16 06:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
6726 |
megawatthours |
2025-08-16 06:00:00 |
BANC |
Balancing Authority of Northern California |
TI |
Total interchange |
-133 |
megawatthours |
2025-08-16 06:00:00 |
BANC |
Balancing Authority of Northern California |
NG |
Net generation |
2425 |
megawatthours |
2025-08-16 06:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2567 |
megawatthours |
2025-08-16 06:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
2558 |
megawatthours |
2025-08-16 06:00:00 |
AZPS |
Arizona Public Service Company |
TI |
Total interchange |
-2685 |
megawatthours |
2025-08-16 06:00:00 |
AZPS |
Arizona Public Service Company |
NG |
Net generation |
3389 |
megawatthours |
2025-08-16 06:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
5351 |
megawatthours |
2025-08-16 06:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
6074 |
megawatthours |
2025-08-16 06:00:00 |
AVRN |
Avangrid Renewables, LLC |
TI |
Total interchange |
997 |
megawatthours |
2025-08-16 06:00:00 |
AVRN |
Avangrid Renewables, LLC |
NG |
Net generation |
997 |
megawatthours |
2025-08-16 06:00:00 |
AVA |
Avista Corporation |
TI |
Total interchange |
-608 |
megawatthours |
2025-08-16 06:00:00 |
AVA |
Avista Corporation |
NG |
Net generation |
778 |
megawatthours |
2025-08-16 06:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1372 |
megawatthours |
2025-08-16 06:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1386 |
megawatthours |
2025-08-16 06:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
2856 |
megawatthours |
2025-08-16 05:00:00 |
WWA |
NaturEner Wind Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 05:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
TI |
Total interchange |
-8 |
megawatthours |
2025-08-16 05:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
NG |
Net generation |
78 |
megawatthours |
2025-08-16 05:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
100 |
megawatthours |
2025-08-16 05:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
86 |
megawatthours |
2025-08-16 05:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
TI |
Total interchange |
673 |
megawatthours |
2025-08-16 05:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
NG |
Net generation |
1868 |
megawatthours |
2025-08-16 05:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1467 |
megawatthours |
2025-08-16 05:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
1195 |
megawatthours |
2025-08-16 05:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
TI |
Total interchange |
664 |
megawatthours |
2025-08-16 05:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
NG |
Net generation |
5008 |
megawatthours |
2025-08-16 05:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
3804 |
megawatthours |
2025-08-16 05:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
4344 |
megawatthours |
2025-08-16 05:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
333117 |
megawatthours |
2025-08-16 05:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
559031 |
megawatthours |
2025-08-16 05:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
21773 |
megawatthours |
2025-08-16 05:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
21101 |
megawatthours |
2025-08-16 05:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
TI |
Total interchange |
-261 |
megawatthours |
2025-08-16 05:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
NG |
Net generation |
202 |
megawatthours |
2025-08-16 05:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
461 |
megawatthours |
2025-08-16 05:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
463 |
megawatthours |
2025-08-16 05:00:00 |
TIDC |
Turlock Irrigation District |
TI |
Total interchange |
-157 |
megawatthours |
2025-08-16 05:00:00 |
TIDC |
Turlock Irrigation District |
NG |
Net generation |
321 |
megawatthours |
2025-08-16 05:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
487 |
megawatthours |
2025-08-16 05:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
480 |
megawatthours |
2025-08-16 05:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
66866 |
megawatthours |
2025-08-16 05:00:00 |
TEX |
Texas |
D |
Demand |
65030 |
megawatthours |
2025-08-16 05:00:00 |
TEPC |
Tucson Electric Power |
TI |
Total interchange |
-300 |
megawatthours |
2025-08-16 05:00:00 |
TEPC |
Tucson Electric Power |
NG |
Net generation |
1876 |
megawatthours |
2025-08-16 05:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2220 |
megawatthours |
2025-08-16 05:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
2176 |
megawatthours |
2025-08-16 05:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
21773 |
megawatthours |
2025-08-16 05:00:00 |
TEN |
Tennessee |
D |
Demand |
21101 |
megawatthours |
2025-08-16 05:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
2996 |
megawatthours |
2025-08-16 05:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
2998 |
megawatthours |
2025-08-16 05:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
306 |
megawatthours |
2025-08-16 05:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
331 |
megawatthours |
2025-08-16 05:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
46037 |
megawatthours |
2025-08-16 05:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
42638 |
megawatthours |
2025-08-16 05:00:00 |
SW |
Southwest |
TI |
Total interchange |
1243 |
megawatthours |
2025-08-16 05:00:00 |
SW |
Southwest |
NG |
Net generation |
19803 |
megawatthours |
2025-08-16 05:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
18732 |
megawatthours |
2025-08-16 05:00:00 |
SW |
Southwest |
D |
Demand |
18603 |
megawatthours |
2025-08-16 05:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
TI |
Total interchange |
3438 |
megawatthours |
2025-08-16 05:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
NG |
Net generation |
9218 |
megawatthours |
2025-08-16 05:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
5999 |
megawatthours |
2025-08-16 05:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
5780 |
megawatthours |
2025-08-16 05:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
29405 |
megawatthours |
2025-08-16 05:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
27884 |
megawatthours |
2025-08-16 05:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
227 |
megawatthours |
2025-08-16 05:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
283 |
megawatthours |
2025-08-16 05:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
29405 |
megawatthours |
2025-08-16 05:00:00 |
SE |
Southeast |
D |
Demand |
27884 |
megawatthours |
2025-08-16 05:00:00 |
SCL |
Seattle City Light |
TI |
Total interchange |
-510 |
megawatthours |
2025-08-16 05:00:00 |
SCL |
Seattle City Light |
NG |
Net generation |
533 |
megawatthours |
2025-08-16 05:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
961 |
megawatthours |
2025-08-16 05:00:00 |
SCL |
Seattle City Light |
D |
Demand |
1043 |
megawatthours |
2025-08-16 05:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
2877 |
megawatthours |
2025-08-16 05:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
2877 |
megawatthours |
2025-08-16 05:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
3268 |
megawatthours |
2025-08-16 05:00:00 |
PSEI |
Puget Sound Energy, Inc. |
TI |
Total interchange |
-1921 |
megawatthours |
2025-08-16 05:00:00 |
PSEI |
Puget Sound Energy, Inc. |
NG |
Net generation |
746 |
megawatthours |
2025-08-16 05:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2598 |
megawatthours |
2025-08-16 05:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2667 |
megawatthours |
2025-08-16 05:00:00 |
PSCO |
Public Service Company of Colorado |
TI |
Total interchange |
6 |
megawatthours |
2025-08-16 05:00:00 |
PSCO |
Public Service Company of Colorado |
NG |
Net generation |
6161 |
megawatthours |
2025-08-16 05:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
5999 |
megawatthours |
2025-08-16 05:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
6155 |
megawatthours |
2025-08-16 05:00:00 |
PNM |
Public Service Company of New Mexico |
TI |
Total interchange |
-716 |
megawatthours |
2025-08-16 05:00:00 |
PNM |
Public Service Company of New Mexico |
NG |
Net generation |
1106 |
megawatthours |
2025-08-16 05:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1861 |
megawatthours |
2025-08-16 05:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
1866 |
megawatthours |
2025-08-16 05:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
97694 |
megawatthours |
2025-08-16 05:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
106978 |
megawatthours |
2025-08-16 05:00:00 |
PGE |
Portland General Electric Company |
TI |
Total interchange |
-1638 |
megawatthours |
2025-08-16 05:00:00 |
PGE |
Portland General Electric Company |
NG |
Net generation |
1241 |
megawatthours |
2025-08-16 05:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2951 |
megawatthours |
2025-08-16 05:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2879 |
megawatthours |
2025-08-16 05:00:00 |
PACW |
PacifiCorp West |
TI |
Total interchange |
-2265 |
megawatthours |
2025-08-16 05:00:00 |
PACW |
PacifiCorp West |
NG |
Net generation |
387 |
megawatthours |
2025-08-16 05:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2676 |
megawatthours |
2025-08-16 05:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2652 |
megawatthours |
2025-08-16 05:00:00 |
PACE |
PacifiCorp East |
TI |
Total interchange |
-151 |
megawatthours |
2025-08-16 05:00:00 |
PACE |
PacifiCorp East |
NG |
Net generation |
6830 |
megawatthours |
2025-08-16 05:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
7691 |
megawatthours |
2025-08-16 05:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
6981 |
megawatthours |
2025-08-16 05:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
19161 |
megawatthours |
2025-08-16 05:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
19617 |
megawatthours |
2025-08-16 05:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
19161 |
megawatthours |
2025-08-16 05:00:00 |
NY |
New York |
D |
Demand |
19617 |
megawatthours |
2025-08-16 05:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1477 |
megawatthours |
2025-08-16 05:00:00 |
NW |
Northwest |
TI |
Total interchange |
-1349 |
megawatthours |
2025-08-16 05:00:00 |
NW |
Northwest |
NG |
Net generation |
44264 |
megawatthours |
2025-08-16 05:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
46293 |
megawatthours |
2025-08-16 05:00:00 |
NW |
Northwest |
D |
Demand |
48163 |
megawatthours |
2025-08-16 05:00:00 |
NEVP |
Nevada Power Company |
TI |
Total interchange |
-1874 |
megawatthours |
2025-08-16 05:00:00 |
NEVP |
Nevada Power Company |
NG |
Net generation |
3738 |
megawatthours |
2025-08-16 05:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
6450 |
megawatthours |
2025-08-16 05:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
6679 |
megawatthours |
2025-08-16 05:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
12850 |
megawatthours |
2025-08-16 05:00:00 |
NE |
New England |
D |
Demand |
13413 |
megawatthours |
2025-08-16 05:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
86464 |
megawatthours |
2025-08-16 05:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
85911 |
megawatthours |
2025-08-16 05:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
94038 |
megawatthours |
2025-08-16 05:00:00 |
MIDW |
Midwest |
D |
Demand |
94009 |
megawatthours |
2025-08-16 05:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
97694 |
megawatthours |
2025-08-16 05:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
106978 |
megawatthours |
2025-08-16 05:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
4522 |
megawatthours |
2025-08-16 05:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
4985 |
megawatthours |
2025-08-16 05:00:00 |
LDWP |
Los Angeles Department of Water and Power |
TI |
Total interchange |
-168 |
megawatthours |
2025-08-16 05:00:00 |
LDWP |
Los Angeles Department of Water and Power |
NG |
Net generation |
2917 |
megawatthours |
2025-08-16 05:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3052 |
megawatthours |
2025-08-16 05:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
3085 |
megawatthours |
2025-08-16 05:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1716 |
megawatthours |
2025-08-16 05:00:00 |
JEA |
JEA |
D |
Demand |
1712 |
megawatthours |
2025-08-16 05:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
12850 |
megawatthours |
2025-08-16 05:00:00 |
ISNE |
ISO New England |
D |
Demand |
13413 |
megawatthours |
2025-08-16 05:00:00 |
IPCO |
Idaho Power Company |
TI |
Total interchange |
-762 |
megawatthours |
2025-08-16 05:00:00 |
IPCO |
Idaho Power Company |
NG |
Net generation |
2116 |
megawatthours |
2025-08-16 05:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2984 |
megawatthours |
2025-08-16 05:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
2880 |
megawatthours |
2025-08-16 05:00:00 |
IID |
Imperial Irrigation District |
NG |
Net generation |
676 |
megawatthours |
2025-08-16 05:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
685 |
megawatthours |
2025-08-16 05:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
722 |
megawatthours |
2025-08-16 05:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
86 |
megawatthours |
2025-08-16 05:00:00 |
HST |
City of Homestead |
D |
Demand |
91 |
megawatthours |
2025-08-16 05:00:00 |
GWA |
NaturEner Power Watch, LLC |
TI |
Total interchange |
0 |
megawatthours |
2025-08-16 05:00:00 |
GWA |
NaturEner Power Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 05:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
203 |
megawatthours |
2025-08-16 05:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
274 |
megawatthours |
2025-08-16 05:00:00 |
GRID |
Gridforce Energy Management, LLC |
TI |
Total interchange |
1966 |
megawatthours |
2025-08-16 05:00:00 |
GRID |
Gridforce Energy Management, LLC |
NG |
Net generation |
1966 |
megawatthours |
2025-08-16 05:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
TI |
Total interchange |
386 |
megawatthours |
2025-08-16 05:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
NG |
Net generation |
1236 |
megawatthours |
2025-08-16 05:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
813 |
megawatthours |
2025-08-16 05:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
854 |
megawatthours |
2025-08-16 05:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
18494 |
megawatthours |
2025-08-16 05:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
18773 |
megawatthours |
2025-08-16 05:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
6143 |
megawatthours |
2025-08-16 05:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
7454 |
megawatthours |
2025-08-16 05:00:00 |
FMPP |
Florida Municipal Power Pool |
DF |
Day-ahead demand forecast |
2440 |
megawatthours |
2025-08-16 05:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
2437 |
megawatthours |
2025-08-16 05:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
32611 |
megawatthours |
2025-08-16 05:00:00 |
FLA |
Florida |
D |
Demand |
34353 |
megawatthours |
2025-08-16 05:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
66866 |
megawatthours |
2025-08-16 05:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
65030 |
megawatthours |
2025-08-16 05:00:00 |
EPE |
El Paso Electric Company |
TI |
Total interchange |
-355 |
megawatthours |
2025-08-16 05:00:00 |
EPE |
El Paso Electric Company |
NG |
Net generation |
1049 |
megawatthours |
2025-08-16 05:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1404 |
megawatthours |
2025-08-16 05:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1403 |
megawatthours |
2025-08-16 05:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
13050 |
megawatthours |
2025-08-16 05:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
12733 |
megawatthours |
2025-08-16 05:00:00 |
DOPD |
PUD No. 1 of Douglas County |
TI |
Total interchange |
299 |
megawatthours |
2025-08-16 05:00:00 |
DOPD |
PUD No. 1 of Douglas County |
NG |
Net generation |
560 |
megawatthours |
2025-08-16 05:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
294 |
megawatthours |
2025-08-16 05:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
261 |
megawatthours |
2025-08-16 05:00:00 |
DEAA |
Arlington Valley, LLC |
TI |
Total interchange |
484 |
megawatthours |
2025-08-16 05:00:00 |
DEAA |
Arlington Valley, LLC |
NG |
Net generation |
484 |
megawatthours |
2025-08-16 05:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
464 |
megawatthours |
2025-08-16 05:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
478 |
megawatthours |
2025-08-16 05:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
7295 |
megawatthours |
2025-08-16 05:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
7547 |
megawatthours |
2025-08-16 05:00:00 |
CISO |
California Independent System Operator |
TI |
Total interchange |
-4601 |
megawatthours |
2025-08-16 05:00:00 |
CISO |
California Independent System Operator |
NG |
Net generation |
28107 |
megawatthours |
2025-08-16 05:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
32299 |
megawatthours |
2025-08-16 05:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
33204 |
megawatthours |
2025-08-16 05:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
TI |
Total interchange |
1067 |
megawatthours |
2025-08-16 05:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
NG |
Net generation |
1262 |
megawatthours |
2025-08-16 05:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
190 |
megawatthours |
2025-08-16 05:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
195 |
megawatthours |
2025-08-16 05:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
46037 |
megawatthours |
2025-08-16 05:00:00 |
CENT |
Central |
D |
Demand |
42638 |
megawatthours |
2025-08-16 05:00:00 |
CAR |
Carolinas |
NG |
Net generation |
26115 |
megawatthours |
2025-08-16 05:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
23686 |
megawatthours |
2025-08-16 05:00:00 |
CAR |
Carolinas |
D |
Demand |
26903 |
megawatthours |
2025-08-16 05:00:00 |
CAL |
California |
TI |
Total interchange |
-5322 |
megawatthours |
2025-08-16 05:00:00 |
CAL |
California |
NG |
Net generation |
34472 |
megawatthours |
2025-08-16 05:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
39378 |
megawatthours |
2025-08-16 05:00:00 |
CAL |
California |
D |
Demand |
40339 |
megawatthours |
2025-08-16 05:00:00 |
BPAT |
Bonneville Power Administration |
TI |
Total interchange |
3049 |
megawatthours |
2025-08-16 05:00:00 |
BPAT |
Bonneville Power Administration |
NG |
Net generation |
10134 |
megawatthours |
2025-08-16 05:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6850 |
megawatthours |
2025-08-16 05:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
7085 |
megawatthours |
2025-08-16 05:00:00 |
BANC |
Balancing Authority of Northern California |
TI |
Total interchange |
-396 |
megawatthours |
2025-08-16 05:00:00 |
BANC |
Balancing Authority of Northern California |
NG |
Net generation |
2451 |
megawatthours |
2025-08-16 05:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2855 |
megawatthours |
2025-08-16 05:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
2848 |
megawatthours |
2025-08-16 05:00:00 |
AZPS |
Arizona Public Service Company |
TI |
Total interchange |
-1981 |
megawatthours |
2025-08-16 05:00:00 |
AZPS |
Arizona Public Service Company |
NG |
Net generation |
4202 |
megawatthours |
2025-08-16 05:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
5781 |
megawatthours |
2025-08-16 05:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
6183 |
megawatthours |
2025-08-16 05:00:00 |
AVRN |
Avangrid Renewables, LLC |
TI |
Total interchange |
1234 |
megawatthours |
2025-08-16 05:00:00 |
AVRN |
Avangrid Renewables, LLC |
NG |
Net generation |
1234 |
megawatthours |
2025-08-16 05:00:00 |
AVA |
Avista Corporation |
TI |
Total interchange |
-630 |
megawatthours |
2025-08-16 05:00:00 |
AVA |
Avista Corporation |
NG |
Net generation |
832 |
megawatthours |
2025-08-16 05:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1471 |
megawatthours |
2025-08-16 05:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1462 |
megawatthours |
2025-08-16 05:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
DF |
Day-ahead demand forecast |
3052 |
megawatthours |
2025-08-16 05:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
3113 |
megawatthours |
2025-08-16 04:00:00 |
WWA |
NaturEner Wind Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 04:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
TI |
Total interchange |
-13 |
megawatthours |
2025-08-16 04:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
NG |
Net generation |
78 |
megawatthours |
2025-08-16 04:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
105 |
megawatthours |
2025-08-16 04:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
91 |
megawatthours |
2025-08-16 04:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
TI |
Total interchange |
578 |
megawatthours |
2025-08-16 04:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
NG |
Net generation |
2043 |
megawatthours |
2025-08-16 04:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1568 |
megawatthours |
2025-08-16 04:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
1465 |
megawatthours |
2025-08-16 04:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
TI |
Total interchange |
656 |
megawatthours |
2025-08-16 04:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
NG |
Net generation |
5137 |
megawatthours |
2025-08-16 04:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4006 |
megawatthours |
2025-08-16 04:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
4481 |
megawatthours |
2025-08-16 04:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
545927 |
megawatthours |
2025-08-16 04:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
592053 |
megawatthours |
2025-08-16 04:00:00 |
TVA |
Tennessee Valley Authority |
TI |
Total interchange |
-1396 |
megawatthours |
2025-08-16 04:00:00 |
TVA |
Tennessee Valley Authority |
NG |
Net generation |
21231 |
megawatthours |
2025-08-16 04:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
23101 |
megawatthours |
2025-08-16 04:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
22627 |
megawatthours |
2025-08-16 04:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
TI |
Total interchange |
-238 |
megawatthours |
2025-08-16 04:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
NG |
Net generation |
242 |
megawatthours |
2025-08-16 04:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
466 |
megawatthours |
2025-08-16 04:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
480 |
megawatthours |
2025-08-16 04:00:00 |
TIDC |
Turlock Irrigation District |
TI |
Total interchange |
-184 |
megawatthours |
2025-08-16 04:00:00 |
TIDC |
Turlock Irrigation District |
NG |
Net generation |
334 |
megawatthours |
2025-08-16 04:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
524 |
megawatthours |
2025-08-16 04:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
519 |
megawatthours |
2025-08-16 04:00:00 |
TEX |
Texas |
TI |
Total interchange |
-42 |
megawatthours |
2025-08-16 04:00:00 |
TEX |
Texas |
NG |
Net generation |
68365 |
megawatthours |
2025-08-16 04:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
70192 |
megawatthours |
2025-08-16 04:00:00 |
TEX |
Texas |
D |
Demand |
68407 |
megawatthours |
2025-08-16 04:00:00 |
TEPC |
Tucson Electric Power |
TI |
Total interchange |
-361 |
megawatthours |
2025-08-16 04:00:00 |
TEPC |
Tucson Electric Power |
NG |
Net generation |
1906 |
megawatthours |
2025-08-16 04:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2342 |
megawatthours |
2025-08-16 04:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
2267 |
megawatthours |
2025-08-16 04:00:00 |
TEN |
Tennessee |
TI |
Total interchange |
-1396 |
megawatthours |
2025-08-16 04:00:00 |
TEN |
Tennessee |
NG |
Net generation |
21231 |
megawatthours |
2025-08-16 04:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
23101 |
megawatthours |
2025-08-16 04:00:00 |
TEN |
Tennessee |
D |
Demand |
22627 |
megawatthours |
2025-08-16 04:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
3016 |
megawatthours |
2025-08-16 04:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
3221 |
megawatthours |
2025-08-16 04:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
347 |
megawatthours |
2025-08-16 04:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
358 |
megawatthours |
2025-08-16 04:00:00 |
SWPP |
Southwest Power Pool |
TI |
Total interchange |
1268 |
megawatthours |
2025-08-16 04:00:00 |
SWPP |
Southwest Power Pool |
NG |
Net generation |
46227 |
megawatthours |
2025-08-16 04:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
48334 |
megawatthours |
2025-08-16 04:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
44958 |
megawatthours |
2025-08-16 04:00:00 |
SW |
Southwest |
TI |
Total interchange |
1124 |
megawatthours |
2025-08-16 04:00:00 |
SW |
Southwest |
NG |
Net generation |
20851 |
megawatthours |
2025-08-16 04:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
20124 |
megawatthours |
2025-08-16 04:00:00 |
SW |
Southwest |
D |
Demand |
19770 |
megawatthours |
2025-08-16 04:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
TI |
Total interchange |
3427 |
megawatthours |
2025-08-16 04:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
NG |
Net generation |
9603 |
megawatthours |
2025-08-16 04:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6414 |
megawatthours |
2025-08-16 04:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
6175 |
megawatthours |
2025-08-16 04:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
TI |
Total interchange |
2760 |
megawatthours |
2025-08-16 04:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
NG |
Net generation |
32583 |
megawatthours |
2025-08-16 04:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
31311 |
megawatthours |
2025-08-16 04:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
29823 |
megawatthours |
2025-08-16 04:00:00 |
SEPA |
Southeastern Power Administration |
TI |
Total interchange |
-161 |
megawatthours |
2025-08-16 04:00:00 |
SEPA |
Southeastern Power Administration |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 04:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
281 |
megawatthours |
2025-08-16 04:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
260 |
megawatthours |
2025-08-16 04:00:00 |
SE |
Southeast |
TI |
Total interchange |
2599 |
megawatthours |
2025-08-16 04:00:00 |
SE |
Southeast |
NG |
Net generation |
32583 |
megawatthours |
2025-08-16 04:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
31311 |
megawatthours |
2025-08-16 04:00:00 |
SE |
Southeast |
D |
Demand |
29823 |
megawatthours |
2025-08-16 04:00:00 |
SCL |
Seattle City Light |
TI |
Total interchange |
-430 |
megawatthours |
2025-08-16 04:00:00 |
SCL |
Seattle City Light |
NG |
Net generation |
639 |
megawatthours |
2025-08-16 04:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
980 |
megawatthours |
2025-08-16 04:00:00 |
SCL |
Seattle City Light |
D |
Demand |
1069 |
megawatthours |
2025-08-16 04:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3263 |
megawatthours |
2025-08-16 04:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
3117 |
megawatthours |
2025-08-16 04:00:00 |
SC |
South Carolina Public Service Authority |
DF |
Day-ahead demand forecast |
3644 |
megawatthours |
2025-08-16 04:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
3546 |
megawatthours |
2025-08-16 04:00:00 |
PSEI |
Puget Sound Energy, Inc. |
TI |
Total interchange |
-2021 |
megawatthours |
2025-08-16 04:00:00 |
PSEI |
Puget Sound Energy, Inc. |
NG |
Net generation |
722 |
megawatthours |
2025-08-16 04:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2558 |
megawatthours |
2025-08-16 04:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2743 |
megawatthours |
2025-08-16 04:00:00 |
PSCO |
Public Service Company of Colorado |
TI |
Total interchange |
-454 |
megawatthours |
2025-08-16 04:00:00 |
PSCO |
Public Service Company of Colorado |
NG |
Net generation |
6042 |
megawatthours |
2025-08-16 04:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
6529 |
megawatthours |
2025-08-16 04:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
6496 |
megawatthours |
2025-08-16 04:00:00 |
PNM |
Public Service Company of New Mexico |
TI |
Total interchange |
-666 |
megawatthours |
2025-08-16 04:00:00 |
PNM |
Public Service Company of New Mexico |
NG |
Net generation |
1244 |
megawatthours |
2025-08-16 04:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1988 |
megawatthours |
2025-08-16 04:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
1955 |
megawatthours |
2025-08-16 04:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
100983 |
megawatthours |
2025-08-16 04:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
113005 |
megawatthours |
2025-08-16 04:00:00 |
PGE |
Portland General Electric Company |
TI |
Total interchange |
-1603 |
megawatthours |
2025-08-16 04:00:00 |
PGE |
Portland General Electric Company |
NG |
Net generation |
1319 |
megawatthours |
2025-08-16 04:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
3023 |
megawatthours |
2025-08-16 04:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2922 |
megawatthours |
2025-08-16 04:00:00 |
PACW |
PacifiCorp West |
TI |
Total interchange |
-2328 |
megawatthours |
2025-08-16 04:00:00 |
PACW |
PacifiCorp West |
NG |
Net generation |
427 |
megawatthours |
2025-08-16 04:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2826 |
megawatthours |
2025-08-16 04:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2755 |
megawatthours |
2025-08-16 04:00:00 |
PACE |
PacifiCorp East |
TI |
Total interchange |
-279 |
megawatthours |
2025-08-16 04:00:00 |
PACE |
PacifiCorp East |
NG |
Net generation |
7043 |
megawatthours |
2025-08-16 04:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
8219 |
megawatthours |
2025-08-16 04:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
7322 |
megawatthours |
2025-08-16 04:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
20268 |
megawatthours |
2025-08-16 04:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
20755 |
megawatthours |
2025-08-16 04:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
20268 |
megawatthours |
2025-08-16 04:00:00 |
NY |
New York |
D |
Demand |
20755 |
megawatthours |
2025-08-16 04:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1581 |
megawatthours |
2025-08-16 04:00:00 |
NW |
Northwest |
TI |
Total interchange |
-1644 |
megawatthours |
2025-08-16 04:00:00 |
NW |
Northwest |
NG |
Net generation |
46985 |
megawatthours |
2025-08-16 04:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
48638 |
megawatthours |
2025-08-16 04:00:00 |
NW |
Northwest |
D |
Demand |
50219 |
megawatthours |
2025-08-16 04:00:00 |
NEVP |
Nevada Power Company |
TI |
Total interchange |
-2014 |
megawatthours |
2025-08-16 04:00:00 |
NEVP |
Nevada Power Company |
NG |
Net generation |
5056 |
megawatthours |
2025-08-16 04:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
6801 |
megawatthours |
2025-08-16 04:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
7070 |
megawatthours |
2025-08-16 04:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
14120 |
megawatthours |
2025-08-16 04:00:00 |
NE |
New England |
D |
Demand |
14443 |
megawatthours |
2025-08-16 04:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
TI |
Total interchange |
-4483 |
megawatthours |
2025-08-16 04:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
NG |
Net generation |
88422 |
megawatthours |
2025-08-16 04:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
92387 |
megawatthours |
2025-08-16 04:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
91390 |
megawatthours |
2025-08-16 04:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
100577 |
megawatthours |
2025-08-16 04:00:00 |
MIDW |
Midwest |
D |
Demand |
100183 |
megawatthours |
2025-08-16 04:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
100983 |
megawatthours |
2025-08-16 04:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
113005 |
megawatthours |
2025-08-16 04:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
TI |
Total interchange |
-689 |
megawatthours |
2025-08-16 04:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
NG |
Net generation |
4663 |
megawatthours |
2025-08-16 04:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
4826 |
megawatthours |
2025-08-16 04:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
5352 |
megawatthours |
2025-08-16 04:00:00 |
LDWP |
Los Angeles Department of Water and Power |
TI |
Total interchange |
-68 |
megawatthours |
2025-08-16 04:00:00 |
LDWP |
Los Angeles Department of Water and Power |
NG |
Net generation |
3166 |
megawatthours |
2025-08-16 04:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3178 |
megawatthours |
2025-08-16 04:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
3234 |
megawatthours |
2025-08-16 04:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1874 |
megawatthours |
2025-08-16 04:00:00 |
JEA |
JEA |
D |
Demand |
1831 |
megawatthours |
2025-08-16 04:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
14120 |
megawatthours |
2025-08-16 04:00:00 |
ISNE |
ISO New England |
D |
Demand |
14443 |
megawatthours |
2025-08-16 04:00:00 |
IPCO |
Idaho Power Company |
TI |
Total interchange |
-870 |
megawatthours |
2025-08-16 04:00:00 |
IPCO |
Idaho Power Company |
NG |
Net generation |
2242 |
megawatthours |
2025-08-16 04:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3169 |
megawatthours |
2025-08-16 04:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
3114 |
megawatthours |
2025-08-16 04:00:00 |
IID |
Imperial Irrigation District |
NG |
Net generation |
765 |
megawatthours |
2025-08-16 04:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
751 |
megawatthours |
2025-08-16 04:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
790 |
megawatthours |
2025-08-16 04:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
96 |
megawatthours |
2025-08-16 04:00:00 |
HST |
City of Homestead |
D |
Demand |
99 |
megawatthours |
2025-08-16 04:00:00 |
GWA |
NaturEner Power Watch, LLC |
TI |
Total interchange |
0 |
megawatthours |
2025-08-16 04:00:00 |
GWA |
NaturEner Power Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 04:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
215 |
megawatthours |
2025-08-16 04:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
295 |
megawatthours |
2025-08-16 04:00:00 |
GRID |
Gridforce Energy Management, LLC |
TI |
Total interchange |
2027 |
megawatthours |
2025-08-16 04:00:00 |
GRID |
Gridforce Energy Management, LLC |
NG |
Net generation |
2027 |
megawatthours |
2025-08-16 04:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
TI |
Total interchange |
527 |
megawatthours |
2025-08-16 04:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
NG |
Net generation |
1383 |
megawatthours |
2025-08-16 04:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
817 |
megawatthours |
2025-08-16 04:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
863 |
megawatthours |
2025-08-16 04:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
20123 |
megawatthours |
2025-08-16 04:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
20454 |
megawatthours |
2025-08-16 04:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
6499 |
megawatthours |
2025-08-16 04:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
8182 |
megawatthours |
2025-08-16 04:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
2625 |
megawatthours |
2025-08-16 04:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
29435 |
megawatthours |
2025-08-16 04:00:00 |
FLA |
Florida |
D |
Demand |
37325 |
megawatthours |
2025-08-16 04:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
TI |
Total interchange |
-42 |
megawatthours |
2025-08-16 04:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
NG |
Net generation |
68365 |
megawatthours |
2025-08-16 04:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
70192 |
megawatthours |
2025-08-16 04:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
68407 |
megawatthours |
2025-08-16 04:00:00 |
EPE |
El Paso Electric Company |
TI |
Total interchange |
-413 |
megawatthours |
2025-08-16 04:00:00 |
EPE |
El Paso Electric Company |
NG |
Net generation |
1109 |
megawatthours |
2025-08-16 04:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1524 |
megawatthours |
2025-08-16 04:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1521 |
megawatthours |
2025-08-16 04:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
13718 |
megawatthours |
2025-08-16 04:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
13742 |
megawatthours |
2025-08-16 04:00:00 |
DOPD |
PUD No. 1 of Douglas County |
TI |
Total interchange |
297 |
megawatthours |
2025-08-16 04:00:00 |
DOPD |
PUD No. 1 of Douglas County |
NG |
Net generation |
560 |
megawatthours |
2025-08-16 04:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
301 |
megawatthours |
2025-08-16 04:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
263 |
megawatthours |
2025-08-16 04:00:00 |
DEAA |
Arlington Valley, LLC |
TI |
Total interchange |
485 |
megawatthours |
2025-08-16 04:00:00 |
DEAA |
Arlington Valley, LLC |
NG |
Net generation |
485 |
megawatthours |
2025-08-16 04:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
524 |
megawatthours |
2025-08-16 04:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
523 |
megawatthours |
2025-08-16 04:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
7881 |
megawatthours |
2025-08-16 04:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
8107 |
megawatthours |
2025-08-16 04:00:00 |
CISO |
California Independent System Operator |
TI |
Total interchange |
-4278 |
megawatthours |
2025-08-16 04:00:00 |
CISO |
California Independent System Operator |
NG |
Net generation |
29468 |
megawatthours |
2025-08-16 04:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
33565 |
megawatthours |
2025-08-16 04:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
33854 |
megawatthours |
2025-08-16 04:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
TI |
Total interchange |
1106 |
megawatthours |
2025-08-16 04:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
NG |
Net generation |
1307 |
megawatthours |
2025-08-16 04:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
196 |
megawatthours |
2025-08-16 04:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
201 |
megawatthours |
2025-08-16 04:00:00 |
CENT |
Central |
TI |
Total interchange |
1268 |
megawatthours |
2025-08-16 04:00:00 |
CENT |
Central |
NG |
Net generation |
46227 |
megawatthours |
2025-08-16 04:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
48334 |
megawatthours |
2025-08-16 04:00:00 |
CENT |
Central |
D |
Demand |
44958 |
megawatthours |
2025-08-16 04:00:00 |
CAR |
Carolinas |
TI |
Total interchange |
631 |
megawatthours |
2025-08-16 04:00:00 |
CAR |
Carolinas |
NG |
Net generation |
28723 |
megawatthours |
2025-08-16 04:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
29030 |
megawatthours |
2025-08-16 04:00:00 |
CAR |
Carolinas |
D |
Demand |
29035 |
megawatthours |
2025-08-16 04:00:00 |
CAL |
California |
TI |
Total interchange |
-5123 |
megawatthours |
2025-08-16 04:00:00 |
CAL |
California |
NG |
Net generation |
36245 |
megawatthours |
2025-08-16 04:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
41125 |
megawatthours |
2025-08-16 04:00:00 |
CAL |
California |
D |
Demand |
41503 |
megawatthours |
2025-08-16 04:00:00 |
BPAT |
Bonneville Power Administration |
TI |
Total interchange |
3257 |
megawatthours |
2025-08-16 04:00:00 |
BPAT |
Bonneville Power Administration |
NG |
Net generation |
10503 |
megawatthours |
2025-08-16 04:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
7086 |
megawatthours |
2025-08-16 04:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
7246 |
megawatthours |
2025-08-16 04:00:00 |
BANC |
Balancing Authority of Northern California |
TI |
Total interchange |
-593 |
megawatthours |
2025-08-16 04:00:00 |
BANC |
Balancing Authority of Northern California |
NG |
Net generation |
2512 |
megawatthours |
2025-08-16 04:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
3107 |
megawatthours |
2025-08-16 04:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
3106 |
megawatthours |
2025-08-16 04:00:00 |
AZPS |
Arizona Public Service Company |
TI |
Total interchange |
-1926 |
megawatthours |
2025-08-16 04:00:00 |
AZPS |
Arizona Public Service Company |
NG |
Net generation |
4461 |
megawatthours |
2025-08-16 04:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6288 |
megawatthours |
2025-08-16 04:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
6387 |
megawatthours |
2025-08-16 04:00:00 |
AVRN |
Avangrid Renewables, LLC |
TI |
Total interchange |
1256 |
megawatthours |
2025-08-16 04:00:00 |
AVRN |
Avangrid Renewables, LLC |
NG |
Net generation |
1256 |
megawatthours |
2025-08-16 04:00:00 |
AVA |
Avista Corporation |
TI |
Total interchange |
-520 |
megawatthours |
2025-08-16 04:00:00 |
AVA |
Avista Corporation |
NG |
Net generation |
1002 |
megawatthours |
2025-08-16 04:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1556 |
megawatthours |
2025-08-16 04:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1522 |
megawatthours |
2025-08-16 04:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
NG |
Net generation |
3276 |
megawatthours |
2025-08-16 04:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
DF |
Day-ahead demand forecast |
3364 |
megawatthours |
2025-08-16 04:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
3441 |
megawatthours |
2025-08-16 03:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
TI |
Total interchange |
179 |
megawatthours |
2025-08-16 03:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
NG |
Net generation |
186 |
megawatthours |
2025-08-16 03:00:00 |
WWA |
NaturEner Wind Watch, LLC |
NG |
Net generation |
44 |
megawatthours |
2025-08-16 03:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
TI |
Total interchange |
-14 |
megawatthours |
2025-08-16 03:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
NG |
Net generation |
83 |
megawatthours |
2025-08-16 03:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
104 |
megawatthours |
2025-08-16 03:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
97 |
megawatthours |
2025-08-16 03:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
TI |
Total interchange |
737 |
megawatthours |
2025-08-16 03:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
NG |
Net generation |
2223 |
megawatthours |
2025-08-16 03:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1817 |
megawatthours |
2025-08-16 03:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
1486 |
megawatthours |
2025-08-16 03:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
TI |
Total interchange |
647 |
megawatthours |
2025-08-16 03:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
NG |
Net generation |
5230 |
megawatthours |
2025-08-16 03:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4166 |
megawatthours |
2025-08-16 03:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
4583 |
megawatthours |
2025-08-16 03:00:00 |
US48 |
United States Lower 48 |
TI |
Total interchange |
-10249 |
megawatthours |
2025-08-16 03:00:00 |
US48 |
United States Lower 48 |
NG |
Net generation |
621612 |
megawatthours |
2025-08-16 03:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
577091 |
megawatthours |
2025-08-16 03:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
624241 |
megawatthours |
2025-08-16 03:00:00 |
TVA |
Tennessee Valley Authority |
TI |
Total interchange |
-1997 |
megawatthours |
2025-08-16 03:00:00 |
TVA |
Tennessee Valley Authority |
NG |
Net generation |
22235 |
megawatthours |
2025-08-16 03:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
24819 |
megawatthours |
2025-08-16 03:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
24227 |
megawatthours |
2025-08-16 03:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
TI |
Total interchange |
-254 |
megawatthours |
2025-08-16 03:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
NG |
Net generation |
226 |
megawatthours |
2025-08-16 03:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
476 |
megawatthours |
2025-08-16 03:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
480 |
megawatthours |
2025-08-16 03:00:00 |
TIDC |
Turlock Irrigation District |
TI |
Total interchange |
-204 |
megawatthours |
2025-08-16 03:00:00 |
TIDC |
Turlock Irrigation District |
NG |
Net generation |
345 |
megawatthours |
2025-08-16 03:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
553 |
megawatthours |
2025-08-16 03:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
550 |
megawatthours |
2025-08-16 03:00:00 |
TEX |
Texas |
TI |
Total interchange |
14 |
megawatthours |
2025-08-16 03:00:00 |
TEX |
Texas |
NG |
Net generation |
71812 |
megawatthours |
2025-08-16 03:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
73075 |
megawatthours |
2025-08-16 03:00:00 |
TEX |
Texas |
D |
Demand |
71798 |
megawatthours |
2025-08-16 03:00:00 |
TEPC |
Tucson Electric Power |
TI |
Total interchange |
-271 |
megawatthours |
2025-08-16 03:00:00 |
TEPC |
Tucson Electric Power |
NG |
Net generation |
2094 |
megawatthours |
2025-08-16 03:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2421 |
megawatthours |
2025-08-16 03:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
2365 |
megawatthours |
2025-08-16 03:00:00 |
TEN |
Tennessee |
TI |
Total interchange |
-1997 |
megawatthours |
2025-08-16 03:00:00 |
TEN |
Tennessee |
NG |
Net generation |
22235 |
megawatthours |
2025-08-16 03:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
24819 |
megawatthours |
2025-08-16 03:00:00 |
TEN |
Tennessee |
D |
Demand |
24227 |
megawatthours |
2025-08-16 03:00:00 |
TEC |
Tampa Electric Company |
TI |
Total interchange |
-880 |
megawatthours |
2025-08-16 03:00:00 |
TEC |
Tampa Electric Company |
NG |
Net generation |
2566 |
megawatthours |
2025-08-16 03:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
3388 |
megawatthours |
2025-08-16 03:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
3446 |
megawatthours |
2025-08-16 03:00:00 |
TAL |
City of Tallahassee |
TI |
Total interchange |
1 |
megawatthours |
2025-08-16 03:00:00 |
TAL |
City of Tallahassee |
NG |
Net generation |
376 |
megawatthours |
2025-08-16 03:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
378 |
megawatthours |
2025-08-16 03:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
374 |
megawatthours |
2025-08-16 03:00:00 |
SWPP |
Southwest Power Pool |
TI |
Total interchange |
1414 |
megawatthours |
2025-08-16 03:00:00 |
SWPP |
Southwest Power Pool |
NG |
Net generation |
48739 |
megawatthours |
2025-08-16 03:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
50589 |
megawatthours |
2025-08-16 03:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
47323 |
megawatthours |
2025-08-16 03:00:00 |
SW |
Southwest |
TI |
Total interchange |
1472 |
megawatthours |
2025-08-16 03:00:00 |
SW |
Southwest |
NG |
Net generation |
21744 |
megawatthours |
2025-08-16 03:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
21194 |
megawatthours |
2025-08-16 03:00:00 |
SW |
Southwest |
D |
Demand |
20316 |
megawatthours |
2025-08-16 03:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
TI |
Total interchange |
3405 |
megawatthours |
2025-08-16 03:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
NG |
Net generation |
9638 |
megawatthours |
2025-08-16 03:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6657 |
megawatthours |
2025-08-16 03:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
6233 |
megawatthours |
2025-08-16 03:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
TI |
Total interchange |
3838 |
megawatthours |
2025-08-16 03:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
NG |
Net generation |
35372 |
megawatthours |
2025-08-16 03:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
33291 |
megawatthours |
2025-08-16 03:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
31534 |
megawatthours |
2025-08-16 03:00:00 |
SEPA |
Southeastern Power Administration |
TI |
Total interchange |
-74 |
megawatthours |
2025-08-16 03:00:00 |
SEPA |
Southeastern Power Administration |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 03:00:00 |
SEC |
Seminole Electric Cooperative |
TI |
Total interchange |
1989 |
megawatthours |
2025-08-16 03:00:00 |
SEC |
Seminole Electric Cooperative |
NG |
Net generation |
2274 |
megawatthours |
2025-08-16 03:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
312 |
megawatthours |
2025-08-16 03:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
285 |
megawatthours |
2025-08-16 03:00:00 |
SE |
Southeast |
TI |
Total interchange |
3764 |
megawatthours |
2025-08-16 03:00:00 |
SE |
Southeast |
NG |
Net generation |
35372 |
megawatthours |
2025-08-16 03:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
33291 |
megawatthours |
2025-08-16 03:00:00 |
SE |
Southeast |
D |
Demand |
31534 |
megawatthours |
2025-08-16 03:00:00 |
SCL |
Seattle City Light |
TI |
Total interchange |
-536 |
megawatthours |
2025-08-16 03:00:00 |
SCL |
Seattle City Light |
NG |
Net generation |
532 |
megawatthours |
2025-08-16 03:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
988 |
megawatthours |
2025-08-16 03:00:00 |
SCL |
Seattle City Light |
D |
Demand |
1068 |
megawatthours |
2025-08-16 03:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
TI |
Total interchange |
238 |
megawatthours |
2025-08-16 03:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
NG |
Net generation |
3633 |
megawatthours |
2025-08-16 03:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3489 |
megawatthours |
2025-08-16 03:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
3395 |
megawatthours |
2025-08-16 03:00:00 |
SC |
South Carolina Public Service Authority |
NG |
Net generation |
2975 |
megawatthours |
2025-08-16 03:00:00 |
SC |
South Carolina Public Service Authority |
DF |
Day-ahead demand forecast |
3878 |
megawatthours |
2025-08-16 03:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
3752 |
megawatthours |
2025-08-16 03:00:00 |
PSEI |
Puget Sound Energy, Inc. |
TI |
Total interchange |
-2001 |
megawatthours |
2025-08-16 03:00:00 |
PSEI |
Puget Sound Energy, Inc. |
NG |
Net generation |
734 |
megawatthours |
2025-08-16 03:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2514 |
megawatthours |
2025-08-16 03:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2735 |
megawatthours |
2025-08-16 03:00:00 |
PSCO |
Public Service Company of Colorado |
TI |
Total interchange |
-522 |
megawatthours |
2025-08-16 03:00:00 |
PSCO |
Public Service Company of Colorado |
NG |
Net generation |
6512 |
megawatthours |
2025-08-16 03:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
6877 |
megawatthours |
2025-08-16 03:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
7034 |
megawatthours |
2025-08-16 03:00:00 |
PNM |
Public Service Company of New Mexico |
TI |
Total interchange |
-664 |
megawatthours |
2025-08-16 03:00:00 |
PNM |
Public Service Company of New Mexico |
NG |
Net generation |
1307 |
megawatthours |
2025-08-16 03:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
2085 |
megawatthours |
2025-08-16 03:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
2016 |
megawatthours |
2025-08-16 03:00:00 |
PJM |
PJM Interconnection, LLC |
TI |
Total interchange |
-486 |
megawatthours |
2025-08-16 03:00:00 |
PJM |
PJM Interconnection, LLC |
NG |
Net generation |
126879 |
megawatthours |
2025-08-16 03:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
107391 |
megawatthours |
2025-08-16 03:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
119623 |
megawatthours |
2025-08-16 03:00:00 |
PGE |
Portland General Electric Company |
TI |
Total interchange |
-1877 |
megawatthours |
2025-08-16 03:00:00 |
PGE |
Portland General Electric Company |
NG |
Net generation |
1050 |
megawatthours |
2025-08-16 03:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
3084 |
megawatthours |
2025-08-16 03:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2927 |
megawatthours |
2025-08-16 03:00:00 |
PACW |
PacifiCorp West |
TI |
Total interchange |
-2339 |
megawatthours |
2025-08-16 03:00:00 |
PACW |
PacifiCorp West |
NG |
Net generation |
493 |
megawatthours |
2025-08-16 03:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2944 |
megawatthours |
2025-08-16 03:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2832 |
megawatthours |
2025-08-16 03:00:00 |
PACE |
PacifiCorp East |
TI |
Total interchange |
-293 |
megawatthours |
2025-08-16 03:00:00 |
PACE |
PacifiCorp East |
NG |
Net generation |
7305 |
megawatthours |
2025-08-16 03:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
8573 |
megawatthours |
2025-08-16 03:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
7598 |
megawatthours |
2025-08-16 03:00:00 |
NYIS |
New York Independent System Operator |
TI |
Total interchange |
-1450 |
megawatthours |
2025-08-16 03:00:00 |
NYIS |
New York Independent System Operator |
NG |
Net generation |
20640 |
megawatthours |
2025-08-16 03:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
21631 |
megawatthours |
2025-08-16 03:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
22090 |
megawatthours |
2025-08-16 03:00:00 |
NY |
New York |
TI |
Total interchange |
-1450 |
megawatthours |
2025-08-16 03:00:00 |
NY |
New York |
NG |
Net generation |
20640 |
megawatthours |
2025-08-16 03:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
21631 |
megawatthours |
2025-08-16 03:00:00 |
NY |
New York |
D |
Demand |
22090 |
megawatthours |
2025-08-16 03:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1634 |
megawatthours |
2025-08-16 03:00:00 |
NW |
Northwest |
TI |
Total interchange |
-1485 |
megawatthours |
2025-08-16 03:00:00 |
NW |
Northwest |
NG |
Net generation |
48729 |
megawatthours |
2025-08-16 03:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
50144 |
megawatthours |
2025-08-16 03:00:00 |
NW |
Northwest |
D |
Demand |
51807 |
megawatthours |
2025-08-16 03:00:00 |
NEVP |
Nevada Power Company |
TI |
Total interchange |
-1934 |
megawatthours |
2025-08-16 03:00:00 |
NEVP |
Nevada Power Company |
NG |
Net generation |
5448 |
megawatthours |
2025-08-16 03:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
6922 |
megawatthours |
2025-08-16 03:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
7383 |
megawatthours |
2025-08-16 03:00:00 |
NE |
New England |
TI |
Total interchange |
100 |
megawatthours |
2025-08-16 03:00:00 |
NE |
New England |
NG |
Net generation |
15590 |
megawatthours |
2025-08-16 03:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
15370 |
megawatthours |
2025-08-16 03:00:00 |
NE |
New England |
D |
Demand |
15490 |
megawatthours |
2025-08-16 03:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
TI |
Total interchange |
-5518 |
megawatthours |
2025-08-16 03:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
NG |
Net generation |
92638 |
megawatthours |
2025-08-16 03:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
98523 |
megawatthours |
2025-08-16 03:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
96389 |
megawatthours |
2025-08-16 03:00:00 |
MIDW |
Midwest |
TI |
Total interchange |
-5701 |
megawatthours |
2025-08-16 03:00:00 |
MIDW |
Midwest |
NG |
Net generation |
101767 |
megawatthours |
2025-08-16 03:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
107371 |
megawatthours |
2025-08-16 03:00:00 |
MIDW |
Midwest |
D |
Demand |
105791 |
megawatthours |
2025-08-16 03:00:00 |
MIDA |
Mid-Atlantic |
TI |
Total interchange |
-486 |
megawatthours |
2025-08-16 03:00:00 |
MIDA |
Mid-Atlantic |
NG |
Net generation |
126879 |
megawatthours |
2025-08-16 03:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
107391 |
megawatthours |
2025-08-16 03:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
119623 |
megawatthours |
2025-08-16 03:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
TI |
Total interchange |
-183 |
megawatthours |
2025-08-16 03:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
NG |
Net generation |
5469 |
megawatthours |
2025-08-16 03:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
5184 |
megawatthours |
2025-08-16 03:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
5652 |
megawatthours |
2025-08-16 03:00:00 |
LDWP |
Los Angeles Department of Water and Power |
TI |
Total interchange |
-314 |
megawatthours |
2025-08-16 03:00:00 |
LDWP |
Los Angeles Department of Water and Power |
NG |
Net generation |
3004 |
megawatthours |
2025-08-16 03:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3274 |
megawatthours |
2025-08-16 03:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
3318 |
megawatthours |
2025-08-16 03:00:00 |
JEA |
JEA |
TI |
Total interchange |
-388 |
megawatthours |
2025-08-16 03:00:00 |
JEA |
JEA |
NG |
Net generation |
1552 |
megawatthours |
2025-08-16 03:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
1994 |
megawatthours |
2025-08-16 03:00:00 |
JEA |
JEA |
D |
Demand |
1939 |
megawatthours |
2025-08-16 03:00:00 |
ISNE |
ISO New England |
TI |
Total interchange |
100 |
megawatthours |
2025-08-16 03:00:00 |
ISNE |
ISO New England |
NG |
Net generation |
15590 |
megawatthours |
2025-08-16 03:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
15370 |
megawatthours |
2025-08-16 03:00:00 |
ISNE |
ISO New England |
D |
Demand |
15490 |
megawatthours |
2025-08-16 03:00:00 |
IPCO |
Idaho Power Company |
TI |
Total interchange |
-995 |
megawatthours |
2025-08-16 03:00:00 |
IPCO |
Idaho Power Company |
NG |
Net generation |
2274 |
megawatthours |
2025-08-16 03:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3310 |
megawatthours |
2025-08-16 03:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
3271 |
megawatthours |
2025-08-16 03:00:00 |
IID |
Imperial Irrigation District |
NG |
Net generation |
806 |
megawatthours |
2025-08-16 03:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
805 |
megawatthours |
2025-08-16 03:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
841 |
megawatthours |
2025-08-16 03:00:00 |
HST |
City of Homestead |
TI |
Total interchange |
-106 |
megawatthours |
2025-08-16 03:00:00 |
HST |
City of Homestead |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 03:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
106 |
megawatthours |
2025-08-16 03:00:00 |
HST |
City of Homestead |
D |
Demand |
106 |
megawatthours |
2025-08-16 03:00:00 |
GWA |
NaturEner Power Watch, LLC |
TI |
Total interchange |
0 |
megawatthours |
2025-08-16 03:00:00 |
GWA |
NaturEner Power Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 03:00:00 |
GVL |
Gainesville Regional Utilities |
TI |
Total interchange |
-104 |
megawatthours |
2025-08-16 03:00:00 |
GVL |
Gainesville Regional Utilities |
NG |
Net generation |
207 |
megawatthours |
2025-08-16 03:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
226 |
megawatthours |
2025-08-16 03:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
318 |
megawatthours |
2025-08-16 03:00:00 |
GRID |
Gridforce Energy Management, LLC |
TI |
Total interchange |
2187 |
megawatthours |
2025-08-16 03:00:00 |
GRID |
Gridforce Energy Management, LLC |
NG |
Net generation |
2187 |
megawatthours |
2025-08-16 03:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
TI |
Total interchange |
409 |
megawatthours |
2025-08-16 03:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
NG |
Net generation |
1273 |
megawatthours |
2025-08-16 03:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
822 |
megawatthours |
2025-08-16 03:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
864 |
megawatthours |
2025-08-16 03:00:00 |
FPL |
Florida Power & Light Co. |
TI |
Total interchange |
-37 |
megawatthours |
2025-08-16 03:00:00 |
FPL |
Florida Power & Light Co. |
NG |
Net generation |
21887 |
megawatthours |
2025-08-16 03:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
21753 |
megawatthours |
2025-08-16 03:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
21924 |
megawatthours |
2025-08-16 03:00:00 |
FPC |
Duke Energy Florida, Inc. |
TI |
Total interchange |
-1991 |
megawatthours |
2025-08-16 03:00:00 |
FPC |
Duke Energy Florida, Inc. |
NG |
Net generation |
6914 |
megawatthours |
2025-08-16 03:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
7035 |
megawatthours |
2025-08-16 03:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
8905 |
megawatthours |
2025-08-16 03:00:00 |
FMPP |
Florida Municipal Power Pool |
TI |
Total interchange |
68 |
megawatthours |
2025-08-16 03:00:00 |
FMPP |
Florida Municipal Power Pool |
NG |
Net generation |
2883 |
megawatthours |
2025-08-16 03:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
2815 |
megawatthours |
2025-08-16 03:00:00 |
FLA |
Florida |
TI |
Total interchange |
-1448 |
megawatthours |
2025-08-16 03:00:00 |
FLA |
Florida |
NG |
Net generation |
38659 |
megawatthours |
2025-08-16 03:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
31804 |
megawatthours |
2025-08-16 03:00:00 |
FLA |
Florida |
D |
Demand |
40112 |
megawatthours |
2025-08-16 03:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
TI |
Total interchange |
14 |
megawatthours |
2025-08-16 03:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
NG |
Net generation |
71812 |
megawatthours |
2025-08-16 03:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
73075 |
megawatthours |
2025-08-16 03:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
71798 |
megawatthours |
2025-08-16 03:00:00 |
EPE |
El Paso Electric Company |
TI |
Total interchange |
-469 |
megawatthours |
2025-08-16 03:00:00 |
EPE |
El Paso Electric Company |
NG |
Net generation |
1139 |
megawatthours |
2025-08-16 03:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1613 |
megawatthours |
2025-08-16 03:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1607 |
megawatthours |
2025-08-16 03:00:00 |
DUK |
Duke Energy Carolinas |
TI |
Total interchange |
1606 |
megawatthours |
2025-08-16 03:00:00 |
DUK |
Duke Energy Carolinas |
NG |
Net generation |
16473 |
megawatthours |
2025-08-16 03:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
14792 |
megawatthours |
2025-08-16 03:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
14867 |
megawatthours |
2025-08-16 03:00:00 |
DOPD |
PUD No. 1 of Douglas County |
TI |
Total interchange |
283 |
megawatthours |
2025-08-16 03:00:00 |
DOPD |
PUD No. 1 of Douglas County |
NG |
Net generation |
552 |
megawatthours |
2025-08-16 03:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
306 |
megawatthours |
2025-08-16 03:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
269 |
megawatthours |
2025-08-16 03:00:00 |
DEAA |
Arlington Valley, LLC |
TI |
Total interchange |
483 |
megawatthours |
2025-08-16 03:00:00 |
DEAA |
Arlington Valley, LLC |
NG |
Net generation |
483 |
megawatthours |
2025-08-16 03:00:00 |
CPLW |
Duke Energy Progress West |
TI |
Total interchange |
-97 |
megawatthours |
2025-08-16 03:00:00 |
CPLW |
Duke Energy Progress West |
NG |
Net generation |
476 |
megawatthours |
2025-08-16 03:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
570 |
megawatthours |
2025-08-16 03:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
573 |
megawatthours |
2025-08-16 03:00:00 |
CPLE |
Duke Energy Progress East |
TI |
Total interchange |
-1152 |
megawatthours |
2025-08-16 03:00:00 |
CPLE |
Duke Energy Progress East |
NG |
Net generation |
7706 |
megawatthours |
2025-08-16 03:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
8604 |
megawatthours |
2025-08-16 03:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
8858 |
megawatthours |
2025-08-16 03:00:00 |
CISO |
California Independent System Operator |
TI |
Total interchange |
-3961 |
megawatthours |
2025-08-16 03:00:00 |
CISO |
California Independent System Operator |
NG |
Net generation |
31282 |
megawatthours |
2025-08-16 03:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
34414 |
megawatthours |
2025-08-16 03:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
34674 |
megawatthours |
2025-08-16 03:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
TI |
Total interchange |
1226 |
megawatthours |
2025-08-16 03:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
NG |
Net generation |
1431 |
megawatthours |
2025-08-16 03:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
200 |
megawatthours |
2025-08-16 03:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
205 |
megawatthours |
2025-08-16 03:00:00 |
CENT |
Central |
TI |
Total interchange |
1414 |
megawatthours |
2025-08-16 03:00:00 |
CENT |
Central |
NG |
Net generation |
48739 |
megawatthours |
2025-08-16 03:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
50589 |
megawatthours |
2025-08-16 03:00:00 |
CENT |
Central |
D |
Demand |
47323 |
megawatthours |
2025-08-16 03:00:00 |
CAR |
Carolinas |
TI |
Total interchange |
774 |
megawatthours |
2025-08-16 03:00:00 |
CAR |
Carolinas |
NG |
Net generation |
31449 |
megawatthours |
2025-08-16 03:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
31333 |
megawatthours |
2025-08-16 03:00:00 |
CAR |
Carolinas |
D |
Demand |
31445 |
megawatthours |
2025-08-16 03:00:00 |
CAL |
California |
TI |
Total interchange |
-5220 |
megawatthours |
2025-08-16 03:00:00 |
CAL |
California |
NG |
Net generation |
37997 |
megawatthours |
2025-08-16 03:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
42371 |
megawatthours |
2025-08-16 03:00:00 |
CAL |
California |
D |
Demand |
42685 |
megawatthours |
2025-08-16 03:00:00 |
BPAT |
Bonneville Power Administration |
TI |
Total interchange |
3613 |
megawatthours |
2025-08-16 03:00:00 |
BPAT |
Bonneville Power Administration |
NG |
Net generation |
10902 |
megawatthours |
2025-08-16 03:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
7241 |
megawatthours |
2025-08-16 03:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
7289 |
megawatthours |
2025-08-16 03:00:00 |
BANC |
Balancing Authority of Northern California |
TI |
Total interchange |
-741 |
megawatthours |
2025-08-16 03:00:00 |
BANC |
Balancing Authority of Northern California |
NG |
Net generation |
2560 |
megawatthours |
2025-08-16 03:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
3325 |
megawatthours |
2025-08-16 03:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
3302 |
megawatthours |
2025-08-16 03:00:00 |
AZPS |
Arizona Public Service Company |
TI |
Total interchange |
-1749 |
megawatthours |
2025-08-16 03:00:00 |
AZPS |
Arizona Public Service Company |
NG |
Net generation |
4860 |
megawatthours |
2025-08-16 03:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6601 |
megawatthours |
2025-08-16 03:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
6609 |
megawatthours |
2025-08-16 03:00:00 |
AVRN |
Avangrid Renewables, LLC |
TI |
Total interchange |
1357 |
megawatthours |
2025-08-16 03:00:00 |
AVRN |
Avangrid Renewables, LLC |
NG |
Net generation |
1357 |
megawatthours |
2025-08-16 03:00:00 |
AVA |
Avista Corporation |
TI |
Total interchange |
-442 |
megawatthours |
2025-08-16 03:00:00 |
AVA |
Avista Corporation |
NG |
Net generation |
1096 |
megawatthours |
2025-08-16 03:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1617 |
megawatthours |
2025-08-16 03:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1538 |
megawatthours |
2025-08-16 03:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
NG |
Net generation |
3660 |
megawatthours |
2025-08-16 03:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
DF |
Day-ahead demand forecast |
3664 |
megawatthours |
2025-08-16 03:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
3750 |
megawatthours |
2025-08-16 02:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
TI |
Total interchange |
188 |
megawatthours |
2025-08-16 02:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
NG |
Net generation |
188 |
megawatthours |
2025-08-16 02:00:00 |
WWA |
NaturEner Wind Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 02:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
TI |
Total interchange |
-15 |
megawatthours |
2025-08-16 02:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
NG |
Net generation |
83 |
megawatthours |
2025-08-16 02:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
113 |
megawatthours |
2025-08-16 02:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
98 |
megawatthours |
2025-08-16 02:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
TI |
Total interchange |
686 |
megawatthours |
2025-08-16 02:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
NG |
Net generation |
2228 |
megawatthours |
2025-08-16 02:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1702 |
megawatthours |
2025-08-16 02:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
1542 |
megawatthours |
2025-08-16 02:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
TI |
Total interchange |
658 |
megawatthours |
2025-08-16 02:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
NG |
Net generation |
5242 |
megawatthours |
2025-08-16 02:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4304 |
megawatthours |
2025-08-16 02:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
4584 |
megawatthours |
2025-08-16 02:00:00 |
US48 |
United States Lower 48 |
TI |
Total interchange |
-10224 |
megawatthours |
2025-08-16 02:00:00 |
US48 |
United States Lower 48 |
NG |
Net generation |
652503 |
megawatthours |
2025-08-16 02:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
605842 |
megawatthours |
2025-08-16 02:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
653083 |
megawatthours |
2025-08-16 02:00:00 |
TVA |
Tennessee Valley Authority |
TI |
Total interchange |
-2186 |
megawatthours |
2025-08-16 02:00:00 |
TVA |
Tennessee Valley Authority |
NG |
Net generation |
23569 |
megawatthours |
2025-08-16 02:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
26323 |
megawatthours |
2025-08-16 02:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
25754 |
megawatthours |
2025-08-16 02:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
TI |
Total interchange |
-263 |
megawatthours |
2025-08-16 02:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
NG |
Net generation |
223 |
megawatthours |
2025-08-16 02:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
483 |
megawatthours |
2025-08-16 02:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
486 |
megawatthours |
2025-08-16 02:00:00 |
TIDC |
Turlock Irrigation District |
TI |
Total interchange |
-241 |
megawatthours |
2025-08-16 02:00:00 |
TIDC |
Turlock Irrigation District |
NG |
Net generation |
339 |
megawatthours |
2025-08-16 02:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
578 |
megawatthours |
2025-08-16 02:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
580 |
megawatthours |
2025-08-16 02:00:00 |
TEX |
Texas |
TI |
Total interchange |
-36 |
megawatthours |
2025-08-16 02:00:00 |
TEX |
Texas |
NG |
Net generation |
74000 |
megawatthours |
2025-08-16 02:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
75334 |
megawatthours |
2025-08-16 02:00:00 |
TEX |
Texas |
D |
Demand |
74037 |
megawatthours |
2025-08-16 02:00:00 |
TEPC |
Tucson Electric Power |
TI |
Total interchange |
-204 |
megawatthours |
2025-08-16 02:00:00 |
TEPC |
Tucson Electric Power |
NG |
Net generation |
2272 |
megawatthours |
2025-08-16 02:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2488 |
megawatthours |
2025-08-16 02:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
2476 |
megawatthours |
2025-08-16 02:00:00 |
TEN |
Tennessee |
TI |
Total interchange |
-2186 |
megawatthours |
2025-08-16 02:00:00 |
TEN |
Tennessee |
NG |
Net generation |
23569 |
megawatthours |
2025-08-16 02:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
26323 |
megawatthours |
2025-08-16 02:00:00 |
TEN |
Tennessee |
D |
Demand |
25754 |
megawatthours |
2025-08-16 02:00:00 |
TEC |
Tampa Electric Company |
TI |
Total interchange |
-1370 |
megawatthours |
2025-08-16 02:00:00 |
TEC |
Tampa Electric Company |
NG |
Net generation |
2294 |
megawatthours |
2025-08-16 02:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
3632 |
megawatthours |
2025-08-16 02:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
3665 |
megawatthours |
2025-08-16 02:00:00 |
TAL |
City of Tallahassee |
TI |
Total interchange |
0 |
megawatthours |
2025-08-16 02:00:00 |
TAL |
City of Tallahassee |
NG |
Net generation |
386 |
megawatthours |
2025-08-16 02:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
404 |
megawatthours |
2025-08-16 02:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
385 |
megawatthours |
2025-08-16 02:00:00 |
SWPP |
Southwest Power Pool |
TI |
Total interchange |
1553 |
megawatthours |
2025-08-16 02:00:00 |
SWPP |
Southwest Power Pool |
NG |
Net generation |
50518 |
megawatthours |
2025-08-16 02:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
52298 |
megawatthours |
2025-08-16 02:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
48964 |
megawatthours |
2025-08-16 02:00:00 |
SW |
Southwest |
TI |
Total interchange |
1175 |
megawatthours |
2025-08-16 02:00:00 |
SW |
Southwest |
NG |
Net generation |
21925 |
megawatthours |
2025-08-16 02:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
21851 |
megawatthours |
2025-08-16 02:00:00 |
SW |
Southwest |
D |
Demand |
20804 |
megawatthours |
2025-08-16 02:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
TI |
Total interchange |
3393 |
megawatthours |
2025-08-16 02:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
NG |
Net generation |
9856 |
megawatthours |
2025-08-16 02:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6948 |
megawatthours |
2025-08-16 02:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
6475 |
megawatthours |
2025-08-16 02:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
TI |
Total interchange |
4629 |
megawatthours |
2025-08-16 02:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
NG |
Net generation |
38064 |
megawatthours |
2025-08-16 02:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
35400 |
megawatthours |
2025-08-16 02:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
33435 |
megawatthours |
2025-08-16 02:00:00 |
SEPA |
Southeastern Power Administration |
TI |
Total interchange |
120 |
megawatthours |
2025-08-16 02:00:00 |
SEPA |
Southeastern Power Administration |
NG |
Net generation |
118 |
megawatthours |
2025-08-16 02:00:00 |
SEC |
Seminole Electric Cooperative |
TI |
Total interchange |
1956 |
megawatthours |
2025-08-16 02:00:00 |
SEC |
Seminole Electric Cooperative |
NG |
Net generation |
2263 |
megawatthours |
2025-08-16 02:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
341 |
megawatthours |
2025-08-16 02:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
306 |
megawatthours |
2025-08-16 02:00:00 |
SE |
Southeast |
TI |
Total interchange |
4749 |
megawatthours |
2025-08-16 02:00:00 |
SE |
Southeast |
NG |
Net generation |
38182 |
megawatthours |
2025-08-16 02:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
35400 |
megawatthours |
2025-08-16 02:00:00 |
SE |
Southeast |
D |
Demand |
33435 |
megawatthours |
2025-08-16 02:00:00 |
SCL |
Seattle City Light |
TI |
Total interchange |
-477 |
megawatthours |
2025-08-16 02:00:00 |
SCL |
Seattle City Light |
NG |
Net generation |
617 |
megawatthours |
2025-08-16 02:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
1011 |
megawatthours |
2025-08-16 02:00:00 |
SCL |
Seattle City Light |
D |
Demand |
1094 |
megawatthours |
2025-08-16 02:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
TI |
Total interchange |
231 |
megawatthours |
2025-08-16 02:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
NG |
Net generation |
3886 |
megawatthours |
2025-08-16 02:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3702 |
megawatthours |
2025-08-16 02:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
3655 |
megawatthours |
2025-08-16 02:00:00 |
SC |
South Carolina Public Service Authority |
NG |
Net generation |
3134 |
megawatthours |
2025-08-16 02:00:00 |
SC |
South Carolina Public Service Authority |
DF |
Day-ahead demand forecast |
4073 |
megawatthours |
2025-08-16 02:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
3975 |
megawatthours |
2025-08-16 02:00:00 |
PSEI |
Puget Sound Energy, Inc. |
TI |
Total interchange |
-2048 |
megawatthours |
2025-08-16 02:00:00 |
PSEI |
Puget Sound Energy, Inc. |
NG |
Net generation |
743 |
megawatthours |
2025-08-16 02:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2479 |
megawatthours |
2025-08-16 02:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2791 |
megawatthours |
2025-08-16 02:00:00 |
PSCO |
Public Service Company of Colorado |
TI |
Total interchange |
-391 |
megawatthours |
2025-08-16 02:00:00 |
PSCO |
Public Service Company of Colorado |
NG |
Net generation |
6849 |
megawatthours |
2025-08-16 02:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
6939 |
megawatthours |
2025-08-16 02:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
7240 |
megawatthours |
2025-08-16 02:00:00 |
PNM |
Public Service Company of New Mexico |
TI |
Total interchange |
-525 |
megawatthours |
2025-08-16 02:00:00 |
PNM |
Public Service Company of New Mexico |
NG |
Net generation |
1445 |
megawatthours |
2025-08-16 02:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
2131 |
megawatthours |
2025-08-16 02:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
2013 |
megawatthours |
2025-08-16 02:00:00 |
PJM |
PJM Interconnection, LLC |
TI |
Total interchange |
-357 |
megawatthours |
2025-08-16 02:00:00 |
PJM |
PJM Interconnection, LLC |
NG |
Net generation |
134995 |
megawatthours |
2025-08-16 02:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
115368 |
megawatthours |
2025-08-16 02:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
127185 |
megawatthours |
2025-08-16 02:00:00 |
PGE |
Portland General Electric Company |
TI |
Total interchange |
-1956 |
megawatthours |
2025-08-16 02:00:00 |
PGE |
Portland General Electric Company |
NG |
Net generation |
996 |
megawatthours |
2025-08-16 02:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
3128 |
megawatthours |
2025-08-16 02:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2952 |
megawatthours |
2025-08-16 02:00:00 |
PACW |
PacifiCorp West |
TI |
Total interchange |
-2291 |
megawatthours |
2025-08-16 02:00:00 |
PACW |
PacifiCorp West |
NG |
Net generation |
613 |
megawatthours |
2025-08-16 02:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
3021 |
megawatthours |
2025-08-16 02:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2904 |
megawatthours |
2025-08-16 02:00:00 |
PACE |
PacifiCorp East |
TI |
Total interchange |
-194 |
megawatthours |
2025-08-16 02:00:00 |
PACE |
PacifiCorp East |
NG |
Net generation |
7399 |
megawatthours |
2025-08-16 02:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
8958 |
megawatthours |
2025-08-16 02:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
7593 |
megawatthours |
2025-08-16 02:00:00 |
NYIS |
New York Independent System Operator |
TI |
Total interchange |
-878 |
megawatthours |
2025-08-16 02:00:00 |
NYIS |
New York Independent System Operator |
NG |
Net generation |
22517 |
megawatthours |
2025-08-16 02:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
22964 |
megawatthours |
2025-08-16 02:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
23395 |
megawatthours |
2025-08-16 02:00:00 |
NY |
New York |
TI |
Total interchange |
-878 |
megawatthours |
2025-08-16 02:00:00 |
NY |
New York |
NG |
Net generation |
22517 |
megawatthours |
2025-08-16 02:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
22964 |
megawatthours |
2025-08-16 02:00:00 |
NY |
New York |
D |
Demand |
23395 |
megawatthours |
2025-08-16 02:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1670 |
megawatthours |
2025-08-16 02:00:00 |
NW |
Northwest |
TI |
Total interchange |
-772 |
megawatthours |
2025-08-16 02:00:00 |
NW |
Northwest |
NG |
Net generation |
50309 |
megawatthours |
2025-08-16 02:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
51661 |
megawatthours |
2025-08-16 02:00:00 |
NW |
Northwest |
D |
Demand |
52761 |
megawatthours |
2025-08-16 02:00:00 |
NEVP |
Nevada Power Company |
TI |
Total interchange |
-1973 |
megawatthours |
2025-08-16 02:00:00 |
NEVP |
Nevada Power Company |
NG |
Net generation |
5615 |
megawatthours |
2025-08-16 02:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
7286 |
megawatthours |
2025-08-16 02:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
7588 |
megawatthours |
2025-08-16 02:00:00 |
NE |
New England |
TI |
Total interchange |
-350 |
megawatthours |
2025-08-16 02:00:00 |
NE |
New England |
NG |
Net generation |
16431 |
megawatthours |
2025-08-16 02:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
16580 |
megawatthours |
2025-08-16 02:00:00 |
NE |
New England |
D |
Demand |
16781 |
megawatthours |
2025-08-16 02:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
TI |
Total interchange |
-6725 |
megawatthours |
2025-08-16 02:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
NG |
Net generation |
95902 |
megawatthours |
2025-08-16 02:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
103120 |
megawatthours |
2025-08-16 02:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
100799 |
megawatthours |
2025-08-16 02:00:00 |
MIDW |
Midwest |
TI |
Total interchange |
-6806 |
megawatthours |
2025-08-16 02:00:00 |
MIDW |
Midwest |
NG |
Net generation |
105669 |
megawatthours |
2025-08-16 02:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
112524 |
megawatthours |
2025-08-16 02:00:00 |
MIDW |
Midwest |
D |
Demand |
110774 |
megawatthours |
2025-08-16 02:00:00 |
MIDA |
Mid-Atlantic |
TI |
Total interchange |
-357 |
megawatthours |
2025-08-16 02:00:00 |
MIDA |
Mid-Atlantic |
NG |
Net generation |
134995 |
megawatthours |
2025-08-16 02:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
115368 |
megawatthours |
2025-08-16 02:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
127185 |
megawatthours |
2025-08-16 02:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
TI |
Total interchange |
-81 |
megawatthours |
2025-08-16 02:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
NG |
Net generation |
5942 |
megawatthours |
2025-08-16 02:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
5511 |
megawatthours |
2025-08-16 02:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
6023 |
megawatthours |
2025-08-16 02:00:00 |
LDWP |
Los Angeles Department of Water and Power |
TI |
Total interchange |
-414 |
megawatthours |
2025-08-16 02:00:00 |
LDWP |
Los Angeles Department of Water and Power |
NG |
Net generation |
3092 |
megawatthours |
2025-08-16 02:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3426 |
megawatthours |
2025-08-16 02:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
3506 |
megawatthours |
2025-08-16 02:00:00 |
JEA |
JEA |
TI |
Total interchange |
-348 |
megawatthours |
2025-08-16 02:00:00 |
JEA |
JEA |
NG |
Net generation |
1700 |
megawatthours |
2025-08-16 02:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2099 |
megawatthours |
2025-08-16 02:00:00 |
JEA |
JEA |
D |
Demand |
2050 |
megawatthours |
2025-08-16 02:00:00 |
ISNE |
ISO New England |
TI |
Total interchange |
-350 |
megawatthours |
2025-08-16 02:00:00 |
ISNE |
ISO New England |
NG |
Net generation |
16431 |
megawatthours |
2025-08-16 02:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
16580 |
megawatthours |
2025-08-16 02:00:00 |
ISNE |
ISO New England |
D |
Demand |
16781 |
megawatthours |
2025-08-16 02:00:00 |
IPCO |
Idaho Power Company |
TI |
Total interchange |
-1041 |
megawatthours |
2025-08-16 02:00:00 |
IPCO |
Idaho Power Company |
NG |
Net generation |
2351 |
megawatthours |
2025-08-16 02:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3446 |
megawatthours |
2025-08-16 02:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
3394 |
megawatthours |
2025-08-16 02:00:00 |
IID |
Imperial Irrigation District |
NG |
Net generation |
915 |
megawatthours |
2025-08-16 02:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
869 |
megawatthours |
2025-08-16 02:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
894 |
megawatthours |
2025-08-16 02:00:00 |
HST |
City of Homestead |
TI |
Total interchange |
-113 |
megawatthours |
2025-08-16 02:00:00 |
HST |
City of Homestead |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 02:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
114 |
megawatthours |
2025-08-16 02:00:00 |
HST |
City of Homestead |
D |
Demand |
113 |
megawatthours |
2025-08-16 02:00:00 |
GWA |
NaturEner Power Watch, LLC |
TI |
Total interchange |
0 |
megawatthours |
2025-08-16 02:00:00 |
GWA |
NaturEner Power Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 02:00:00 |
GVL |
Gainesville Regional Utilities |
TI |
Total interchange |
-107 |
megawatthours |
2025-08-16 02:00:00 |
GVL |
Gainesville Regional Utilities |
NG |
Net generation |
225 |
megawatthours |
2025-08-16 02:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
235 |
megawatthours |
2025-08-16 02:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
340 |
megawatthours |
2025-08-16 02:00:00 |
GRID |
Gridforce Energy Management, LLC |
TI |
Total interchange |
2177 |
megawatthours |
2025-08-16 02:00:00 |
GRID |
Gridforce Energy Management, LLC |
NG |
Net generation |
2177 |
megawatthours |
2025-08-16 02:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
TI |
Total interchange |
420 |
megawatthours |
2025-08-16 02:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
NG |
Net generation |
1288 |
megawatthours |
2025-08-16 02:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
839 |
megawatthours |
2025-08-16 02:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
876 |
megawatthours |
2025-08-16 02:00:00 |
FPL |
Florida Power & Light Co. |
TI |
Total interchange |
84 |
megawatthours |
2025-08-16 02:00:00 |
FPL |
Florida Power & Light Co. |
NG |
Net generation |
23417 |
megawatthours |
2025-08-16 02:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
23142 |
megawatthours |
2025-08-16 02:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
23333 |
megawatthours |
2025-08-16 02:00:00 |
FPC |
Duke Energy Florida, Inc. |
TI |
Total interchange |
-2142 |
megawatthours |
2025-08-16 02:00:00 |
FPC |
Duke Energy Florida, Inc. |
NG |
Net generation |
7420 |
megawatthours |
2025-08-16 02:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
7578 |
megawatthours |
2025-08-16 02:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
9562 |
megawatthours |
2025-08-16 02:00:00 |
FMPP |
Florida Municipal Power Pool |
TI |
Total interchange |
204 |
megawatthours |
2025-08-16 02:00:00 |
FMPP |
Florida Municipal Power Pool |
NG |
Net generation |
3202 |
megawatthours |
2025-08-16 02:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
2998 |
megawatthours |
2025-08-16 02:00:00 |
FLA |
Florida |
TI |
Total interchange |
-1836 |
megawatthours |
2025-08-16 02:00:00 |
FLA |
Florida |
NG |
Net generation |
40907 |
megawatthours |
2025-08-16 02:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
33913 |
megawatthours |
2025-08-16 02:00:00 |
FLA |
Florida |
D |
Demand |
42752 |
megawatthours |
2025-08-16 02:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
TI |
Total interchange |
-36 |
megawatthours |
2025-08-16 02:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
NG |
Net generation |
74000 |
megawatthours |
2025-08-16 02:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
75334 |
megawatthours |
2025-08-16 02:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
74037 |
megawatthours |
2025-08-16 02:00:00 |
EPE |
El Paso Electric Company |
TI |
Total interchange |
-490 |
megawatthours |
2025-08-16 02:00:00 |
EPE |
El Paso Electric Company |
NG |
Net generation |
1181 |
megawatthours |
2025-08-16 02:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1683 |
megawatthours |
2025-08-16 02:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1670 |
megawatthours |
2025-08-16 02:00:00 |
DUK |
Duke Energy Carolinas |
TI |
Total interchange |
1625 |
megawatthours |
2025-08-16 02:00:00 |
DUK |
Duke Energy Carolinas |
NG |
Net generation |
17613 |
megawatthours |
2025-08-16 02:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
15933 |
megawatthours |
2025-08-16 02:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
15988 |
megawatthours |
2025-08-16 02:00:00 |
DOPD |
PUD No. 1 of Douglas County |
TI |
Total interchange |
280 |
megawatthours |
2025-08-16 02:00:00 |
DOPD |
PUD No. 1 of Douglas County |
NG |
Net generation |
560 |
megawatthours |
2025-08-16 02:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
309 |
megawatthours |
2025-08-16 02:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
280 |
megawatthours |
2025-08-16 02:00:00 |
DEAA |
Arlington Valley, LLC |
TI |
Total interchange |
483 |
megawatthours |
2025-08-16 02:00:00 |
DEAA |
Arlington Valley, LLC |
NG |
Net generation |
483 |
megawatthours |
2025-08-16 02:00:00 |
CPLW |
Duke Energy Progress West |
TI |
Total interchange |
-35 |
megawatthours |
2025-08-16 02:00:00 |
CPLW |
Duke Energy Progress West |
NG |
Net generation |
585 |
megawatthours |
2025-08-16 02:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
623 |
megawatthours |
2025-08-16 02:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
620 |
megawatthours |
2025-08-16 02:00:00 |
CPLE |
Duke Energy Progress East |
TI |
Total interchange |
-1329 |
megawatthours |
2025-08-16 02:00:00 |
CPLE |
Duke Energy Progress East |
NG |
Net generation |
8259 |
megawatthours |
2025-08-16 02:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
9246 |
megawatthours |
2025-08-16 02:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
9588 |
megawatthours |
2025-08-16 02:00:00 |
CISO |
California Independent System Operator |
TI |
Total interchange |
-3482 |
megawatthours |
2025-08-16 02:00:00 |
CISO |
California Independent System Operator |
NG |
Net generation |
32955 |
megawatthours |
2025-08-16 02:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
35063 |
megawatthours |
2025-08-16 02:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
34096 |
megawatthours |
2025-08-16 02:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
TI |
Total interchange |
1233 |
megawatthours |
2025-08-16 02:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
NG |
Net generation |
1442 |
megawatthours |
2025-08-16 02:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
204 |
megawatthours |
2025-08-16 02:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
209 |
megawatthours |
2025-08-16 02:00:00 |
CENT |
Central |
TI |
Total interchange |
1553 |
megawatthours |
2025-08-16 02:00:00 |
CENT |
Central |
NG |
Net generation |
50518 |
megawatthours |
2025-08-16 02:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
52298 |
megawatthours |
2025-08-16 02:00:00 |
CENT |
Central |
D |
Demand |
48964 |
megawatthours |
2025-08-16 02:00:00 |
CAR |
Carolinas |
TI |
Total interchange |
680 |
megawatthours |
2025-08-16 02:00:00 |
CAR |
Carolinas |
NG |
Net generation |
33665 |
megawatthours |
2025-08-16 02:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
33577 |
megawatthours |
2025-08-16 02:00:00 |
CAR |
Carolinas |
D |
Demand |
33826 |
megawatthours |
2025-08-16 02:00:00 |
CAL |
California |
TI |
Total interchange |
-5160 |
megawatthours |
2025-08-16 02:00:00 |
CAL |
California |
NG |
Net generation |
39816 |
megawatthours |
2025-08-16 02:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
43449 |
megawatthours |
2025-08-16 02:00:00 |
CAL |
California |
D |
Demand |
42615 |
megawatthours |
2025-08-16 02:00:00 |
BPAT |
Bonneville Power Administration |
TI |
Total interchange |
3690 |
megawatthours |
2025-08-16 02:00:00 |
BPAT |
Bonneville Power Administration |
NG |
Net generation |
11121 |
megawatthours |
2025-08-16 02:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
7455 |
megawatthours |
2025-08-16 02:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
7431 |
megawatthours |
2025-08-16 02:00:00 |
BANC |
Balancing Authority of Northern California |
TI |
Total interchange |
-1023 |
megawatthours |
2025-08-16 02:00:00 |
BANC |
Balancing Authority of Northern California |
NG |
Net generation |
2515 |
megawatthours |
2025-08-16 02:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
3513 |
megawatthours |
2025-08-16 02:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
3539 |
megawatthours |
2025-08-16 02:00:00 |
AZPS |
Arizona Public Service Company |
TI |
Total interchange |
-2168 |
megawatthours |
2025-08-16 02:00:00 |
AZPS |
Arizona Public Service Company |
NG |
Net generation |
4460 |
megawatthours |
2025-08-16 02:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6899 |
megawatthours |
2025-08-16 02:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
6628 |
megawatthours |
2025-08-16 02:00:00 |
AVRN |
Avangrid Renewables, LLC |
TI |
Total interchange |
1735 |
megawatthours |
2025-08-16 02:00:00 |
AVRN |
Avangrid Renewables, LLC |
NG |
Net generation |
1735 |
megawatthours |
2025-08-16 02:00:00 |
AVA |
Avista Corporation |
TI |
Total interchange |
-316 |
megawatthours |
2025-08-16 02:00:00 |
AVA |
Avista Corporation |
NG |
Net generation |
1255 |
megawatthours |
2025-08-16 02:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1686 |
megawatthours |
2025-08-16 02:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1571 |
megawatthours |
2025-08-16 02:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
NG |
Net generation |
3825 |
megawatthours |
2025-08-16 02:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
DF |
Day-ahead demand forecast |
3893 |
megawatthours |
2025-08-16 02:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
3952 |
megawatthours |
2025-08-16 01:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
TI |
Total interchange |
180 |
megawatthours |
2025-08-16 01:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
NG |
Net generation |
194 |
megawatthours |
2025-08-16 01:00:00 |
WWA |
NaturEner Wind Watch, LLC |
NG |
Net generation |
16 |
megawatthours |
2025-08-16 01:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
TI |
Total interchange |
-21 |
megawatthours |
2025-08-16 01:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
NG |
Net generation |
83 |
megawatthours |
2025-08-16 01:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
116 |
megawatthours |
2025-08-16 01:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
104 |
megawatthours |
2025-08-16 01:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
TI |
Total interchange |
521 |
megawatthours |
2025-08-16 01:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
NG |
Net generation |
1751 |
megawatthours |
2025-08-16 01:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1608 |
megawatthours |
2025-08-16 01:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
1230 |
megawatthours |
2025-08-16 01:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
TI |
Total interchange |
360 |
megawatthours |
2025-08-16 01:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
NG |
Net generation |
5104 |
megawatthours |
2025-08-16 01:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4444 |
megawatthours |
2025-08-16 01:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
4744 |
megawatthours |
2025-08-16 01:00:00 |
US48 |
United States Lower 48 |
TI |
Total interchange |
-10953 |
megawatthours |
2025-08-16 01:00:00 |
US48 |
United States Lower 48 |
NG |
Net generation |
674591 |
megawatthours |
2025-08-16 01:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
629223 |
megawatthours |
2025-08-16 01:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
677298 |
megawatthours |
2025-08-16 01:00:00 |
TVA |
Tennessee Valley Authority |
TI |
Total interchange |
-2430 |
megawatthours |
2025-08-16 01:00:00 |
TVA |
Tennessee Valley Authority |
NG |
Net generation |
24209 |
megawatthours |
2025-08-16 01:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
27487 |
megawatthours |
2025-08-16 01:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
26642 |
megawatthours |
2025-08-16 01:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
TI |
Total interchange |
-276 |
megawatthours |
2025-08-16 01:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
NG |
Net generation |
217 |
megawatthours |
2025-08-16 01:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
487 |
megawatthours |
2025-08-16 01:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
493 |
megawatthours |
2025-08-16 01:00:00 |
TIDC |
Turlock Irrigation District |
TI |
Total interchange |
-280 |
megawatthours |
2025-08-16 01:00:00 |
TIDC |
Turlock Irrigation District |
NG |
Net generation |
307 |
megawatthours |
2025-08-16 01:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
585 |
megawatthours |
2025-08-16 01:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
588 |
megawatthours |
2025-08-16 01:00:00 |
TEX |
Texas |
TI |
Total interchange |
-124 |
megawatthours |
2025-08-16 01:00:00 |
TEX |
Texas |
NG |
Net generation |
76537 |
megawatthours |
2025-08-16 01:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
77719 |
megawatthours |
2025-08-16 01:00:00 |
TEX |
Texas |
D |
Demand |
76662 |
megawatthours |
2025-08-16 01:00:00 |
TEPC |
Tucson Electric Power |
TI |
Total interchange |
-258 |
megawatthours |
2025-08-16 01:00:00 |
TEPC |
Tucson Electric Power |
NG |
Net generation |
2324 |
megawatthours |
2025-08-16 01:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2539 |
megawatthours |
2025-08-16 01:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
2582 |
megawatthours |
2025-08-16 01:00:00 |
TEN |
Tennessee |
TI |
Total interchange |
-2430 |
megawatthours |
2025-08-16 01:00:00 |
TEN |
Tennessee |
NG |
Net generation |
24209 |
megawatthours |
2025-08-16 01:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
27487 |
megawatthours |
2025-08-16 01:00:00 |
TEN |
Tennessee |
D |
Demand |
26642 |
megawatthours |
2025-08-16 01:00:00 |
TEC |
Tampa Electric Company |
TI |
Total interchange |
-1205 |
megawatthours |
2025-08-16 01:00:00 |
TEC |
Tampa Electric Company |
NG |
Net generation |
2660 |
megawatthours |
2025-08-16 01:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
3865 |
megawatthours |
2025-08-16 01:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
3866 |
megawatthours |
2025-08-16 01:00:00 |
TAL |
City of Tallahassee |
TI |
Total interchange |
0 |
megawatthours |
2025-08-16 01:00:00 |
TAL |
City of Tallahassee |
NG |
Net generation |
400 |
megawatthours |
2025-08-16 01:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
428 |
megawatthours |
2025-08-16 01:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
400 |
megawatthours |
2025-08-16 01:00:00 |
SWPP |
Southwest Power Pool |
TI |
Total interchange |
2098 |
megawatthours |
2025-08-16 01:00:00 |
SWPP |
Southwest Power Pool |
NG |
Net generation |
52827 |
megawatthours |
2025-08-16 01:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
54081 |
megawatthours |
2025-08-16 01:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
50728 |
megawatthours |
2025-08-16 01:00:00 |
SW |
Southwest |
TI |
Total interchange |
212 |
megawatthours |
2025-08-16 01:00:00 |
SW |
Southwest |
NG |
Net generation |
21131 |
megawatthours |
2025-08-16 01:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
22239 |
megawatthours |
2025-08-16 01:00:00 |
SW |
Southwest |
D |
Demand |
20978 |
megawatthours |
2025-08-16 01:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
TI |
Total interchange |
3018 |
megawatthours |
2025-08-16 01:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
NG |
Net generation |
9683 |
megawatthours |
2025-08-16 01:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
7145 |
megawatthours |
2025-08-16 01:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
6697 |
megawatthours |
2025-08-16 01:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
TI |
Total interchange |
4615 |
megawatthours |
2025-08-16 01:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
NG |
Net generation |
39500 |
megawatthours |
2025-08-16 01:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
36954 |
megawatthours |
2025-08-16 01:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
34885 |
megawatthours |
2025-08-16 01:00:00 |
SEPA |
Southeastern Power Administration |
TI |
Total interchange |
382 |
megawatthours |
2025-08-16 01:00:00 |
SEPA |
Southeastern Power Administration |
NG |
Net generation |
379 |
megawatthours |
2025-08-16 01:00:00 |
SEC |
Seminole Electric Cooperative |
TI |
Total interchange |
1987 |
megawatthours |
2025-08-16 01:00:00 |
SEC |
Seminole Electric Cooperative |
NG |
Net generation |
2314 |
megawatthours |
2025-08-16 01:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
369 |
megawatthours |
2025-08-16 01:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
327 |
megawatthours |
2025-08-16 01:00:00 |
SE |
Southeast |
TI |
Total interchange |
4997 |
megawatthours |
2025-08-16 01:00:00 |
SE |
Southeast |
NG |
Net generation |
39879 |
megawatthours |
2025-08-16 01:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
36954 |
megawatthours |
2025-08-16 01:00:00 |
SE |
Southeast |
D |
Demand |
34885 |
megawatthours |
2025-08-16 01:00:00 |
SCL |
Seattle City Light |
TI |
Total interchange |
-523 |
megawatthours |
2025-08-16 01:00:00 |
SCL |
Seattle City Light |
NG |
Net generation |
608 |
megawatthours |
2025-08-16 01:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
1043 |
megawatthours |
2025-08-16 01:00:00 |
SCL |
Seattle City Light |
D |
Demand |
1131 |
megawatthours |
2025-08-16 01:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
TI |
Total interchange |
243 |
megawatthours |
2025-08-16 01:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
NG |
Net generation |
4074 |
megawatthours |
2025-08-16 01:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
3945 |
megawatthours |
2025-08-16 01:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
3831 |
megawatthours |
2025-08-16 01:00:00 |
SC |
South Carolina Public Service Authority |
NG |
Net generation |
3203 |
megawatthours |
2025-08-16 01:00:00 |
SC |
South Carolina Public Service Authority |
DF |
Day-ahead demand forecast |
4217 |
megawatthours |
2025-08-16 01:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
4097 |
megawatthours |
2025-08-16 01:00:00 |
PSEI |
Puget Sound Energy, Inc. |
TI |
Total interchange |
-2192 |
megawatthours |
2025-08-16 01:00:00 |
PSEI |
Puget Sound Energy, Inc. |
NG |
Net generation |
631 |
megawatthours |
2025-08-16 01:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2452 |
megawatthours |
2025-08-16 01:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2823 |
megawatthours |
2025-08-16 01:00:00 |
PSCO |
Public Service Company of Colorado |
TI |
Total interchange |
-211 |
megawatthours |
2025-08-16 01:00:00 |
PSCO |
Public Service Company of Colorado |
NG |
Net generation |
7574 |
megawatthours |
2025-08-16 01:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
7170 |
megawatthours |
2025-08-16 01:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
7785 |
megawatthours |
2025-08-16 01:00:00 |
PNM |
Public Service Company of New Mexico |
TI |
Total interchange |
-662 |
megawatthours |
2025-08-16 01:00:00 |
PNM |
Public Service Company of New Mexico |
NG |
Net generation |
1379 |
megawatthours |
2025-08-16 01:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
2192 |
megawatthours |
2025-08-16 01:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
2069 |
megawatthours |
2025-08-16 01:00:00 |
PJM |
PJM Interconnection, LLC |
TI |
Total interchange |
-136 |
megawatthours |
2025-08-16 01:00:00 |
PJM |
PJM Interconnection, LLC |
NG |
Net generation |
140268 |
megawatthours |
2025-08-16 01:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
122950 |
megawatthours |
2025-08-16 01:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
133322 |
megawatthours |
2025-08-16 01:00:00 |
PGE |
Portland General Electric Company |
TI |
Total interchange |
-2051 |
megawatthours |
2025-08-16 01:00:00 |
PGE |
Portland General Electric Company |
NG |
Net generation |
947 |
megawatthours |
2025-08-16 01:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
3165 |
megawatthours |
2025-08-16 01:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2998 |
megawatthours |
2025-08-16 01:00:00 |
PACW |
PacifiCorp West |
TI |
Total interchange |
-2369 |
megawatthours |
2025-08-16 01:00:00 |
PACW |
PacifiCorp West |
NG |
Net generation |
574 |
megawatthours |
2025-08-16 01:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
3057 |
megawatthours |
2025-08-16 01:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2943 |
megawatthours |
2025-08-16 01:00:00 |
PACE |
PacifiCorp East |
TI |
Total interchange |
-154 |
megawatthours |
2025-08-16 01:00:00 |
PACE |
PacifiCorp East |
NG |
Net generation |
7763 |
megawatthours |
2025-08-16 01:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
9195 |
megawatthours |
2025-08-16 01:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
7917 |
megawatthours |
2025-08-16 01:00:00 |
NYIS |
New York Independent System Operator |
TI |
Total interchange |
-805 |
megawatthours |
2025-08-16 01:00:00 |
NYIS |
New York Independent System Operator |
NG |
Net generation |
23677 |
megawatthours |
2025-08-16 01:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
23960 |
megawatthours |
2025-08-16 01:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
24482 |
megawatthours |
2025-08-16 01:00:00 |
NY |
New York |
TI |
Total interchange |
-805 |
megawatthours |
2025-08-16 01:00:00 |
NY |
New York |
NG |
Net generation |
23677 |
megawatthours |
2025-08-16 01:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
23960 |
megawatthours |
2025-08-16 01:00:00 |
NY |
New York |
D |
Demand |
24482 |
megawatthours |
2025-08-16 01:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1703 |
megawatthours |
2025-08-16 01:00:00 |
NW |
Northwest |
TI |
Total interchange |
-1310 |
megawatthours |
2025-08-16 01:00:00 |
NW |
Northwest |
NG |
Net generation |
51338 |
megawatthours |
2025-08-16 01:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
52663 |
megawatthours |
2025-08-16 01:00:00 |
NW |
Northwest |
D |
Demand |
54342 |
megawatthours |
2025-08-16 01:00:00 |
NEVP |
Nevada Power Company |
TI |
Total interchange |
-1719 |
megawatthours |
2025-08-16 01:00:00 |
NEVP |
Nevada Power Company |
NG |
Net generation |
6085 |
megawatthours |
2025-08-16 01:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
7436 |
megawatthours |
2025-08-16 01:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
7804 |
megawatthours |
2025-08-16 01:00:00 |
NE |
New England |
TI |
Total interchange |
-840 |
megawatthours |
2025-08-16 01:00:00 |
NE |
New England |
NG |
Net generation |
16993 |
megawatthours |
2025-08-16 01:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
17510 |
megawatthours |
2025-08-16 01:00:00 |
NE |
New England |
D |
Demand |
17833 |
megawatthours |
2025-08-16 01:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
TI |
Total interchange |
-7599 |
megawatthours |
2025-08-16 01:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
NG |
Net generation |
98485 |
megawatthours |
2025-08-16 01:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
106507 |
megawatthours |
2025-08-16 01:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
104128 |
megawatthours |
2025-08-16 01:00:00 |
MIDW |
Midwest |
TI |
Total interchange |
-7531 |
megawatthours |
2025-08-16 01:00:00 |
MIDW |
Midwest |
NG |
Net generation |
108780 |
megawatthours |
2025-08-16 01:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
116355 |
megawatthours |
2025-08-16 01:00:00 |
MIDW |
Midwest |
D |
Demand |
114596 |
megawatthours |
2025-08-16 01:00:00 |
MIDA |
Mid-Atlantic |
TI |
Total interchange |
-136 |
megawatthours |
2025-08-16 01:00:00 |
MIDA |
Mid-Atlantic |
NG |
Net generation |
140268 |
megawatthours |
2025-08-16 01:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
122950 |
megawatthours |
2025-08-16 01:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
133322 |
megawatthours |
2025-08-16 01:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
TI |
Total interchange |
68 |
megawatthours |
2025-08-16 01:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
NG |
Net generation |
6331 |
megawatthours |
2025-08-16 01:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
5727 |
megawatthours |
2025-08-16 01:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
6263 |
megawatthours |
2025-08-16 01:00:00 |
LDWP |
Los Angeles Department of Water and Power |
TI |
Total interchange |
-555 |
megawatthours |
2025-08-16 01:00:00 |
LDWP |
Los Angeles Department of Water and Power |
NG |
Net generation |
3147 |
megawatthours |
2025-08-16 01:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3552 |
megawatthours |
2025-08-16 01:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
3702 |
megawatthours |
2025-08-16 01:00:00 |
JEA |
JEA |
TI |
Total interchange |
-347 |
megawatthours |
2025-08-16 01:00:00 |
JEA |
JEA |
NG |
Net generation |
1792 |
megawatthours |
2025-08-16 01:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2156 |
megawatthours |
2025-08-16 01:00:00 |
JEA |
JEA |
D |
Demand |
2138 |
megawatthours |
2025-08-16 01:00:00 |
ISNE |
ISO New England |
TI |
Total interchange |
-840 |
megawatthours |
2025-08-16 01:00:00 |
ISNE |
ISO New England |
NG |
Net generation |
16993 |
megawatthours |
2025-08-16 01:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
17510 |
megawatthours |
2025-08-16 01:00:00 |
ISNE |
ISO New England |
D |
Demand |
17833 |
megawatthours |
2025-08-16 01:00:00 |
IPCO |
Idaho Power Company |
TI |
Total interchange |
-1034 |
megawatthours |
2025-08-16 01:00:00 |
IPCO |
Idaho Power Company |
NG |
Net generation |
2421 |
megawatthours |
2025-08-16 01:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3480 |
megawatthours |
2025-08-16 01:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
3457 |
megawatthours |
2025-08-16 01:00:00 |
IID |
Imperial Irrigation District |
NG |
Net generation |
1017 |
megawatthours |
2025-08-16 01:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
903 |
megawatthours |
2025-08-16 01:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
913 |
megawatthours |
2025-08-16 01:00:00 |
HST |
City of Homestead |
TI |
Total interchange |
-118 |
megawatthours |
2025-08-16 01:00:00 |
HST |
City of Homestead |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 01:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
119 |
megawatthours |
2025-08-16 01:00:00 |
HST |
City of Homestead |
D |
Demand |
118 |
megawatthours |
2025-08-16 01:00:00 |
GWA |
NaturEner Power Watch, LLC |
TI |
Total interchange |
0 |
megawatthours |
2025-08-16 01:00:00 |
GWA |
NaturEner Power Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 01:00:00 |
GVL |
Gainesville Regional Utilities |
TI |
Total interchange |
-111 |
megawatthours |
2025-08-16 01:00:00 |
GVL |
Gainesville Regional Utilities |
NG |
Net generation |
249 |
megawatthours |
2025-08-16 01:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
240 |
megawatthours |
2025-08-16 01:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
368 |
megawatthours |
2025-08-16 01:00:00 |
GRID |
Gridforce Energy Management, LLC |
TI |
Total interchange |
2211 |
megawatthours |
2025-08-16 01:00:00 |
GRID |
Gridforce Energy Management, LLC |
NG |
Net generation |
2211 |
megawatthours |
2025-08-16 01:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
TI |
Total interchange |
402 |
megawatthours |
2025-08-16 01:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
NG |
Net generation |
1291 |
megawatthours |
2025-08-16 01:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
858 |
megawatthours |
2025-08-16 01:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
894 |
megawatthours |
2025-08-16 01:00:00 |
FPL |
Florida Power & Light Co. |
TI |
Total interchange |
105 |
megawatthours |
2025-08-16 01:00:00 |
FPL |
Florida Power & Light Co. |
NG |
Net generation |
24627 |
megawatthours |
2025-08-16 01:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
24700 |
megawatthours |
2025-08-16 01:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
24522 |
megawatthours |
2025-08-16 01:00:00 |
FPC |
Duke Energy Florida, Inc. |
TI |
Total interchange |
-2505 |
megawatthours |
2025-08-16 01:00:00 |
FPC |
Duke Energy Florida, Inc. |
NG |
Net generation |
7616 |
megawatthours |
2025-08-16 01:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
8029 |
megawatthours |
2025-08-16 01:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
10121 |
megawatthours |
2025-08-16 01:00:00 |
FMPP |
Florida Municipal Power Pool |
TI |
Total interchange |
221 |
megawatthours |
2025-08-16 01:00:00 |
FMPP |
Florida Municipal Power Pool |
NG |
Net generation |
3374 |
megawatthours |
2025-08-16 01:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
3153 |
megawatthours |
2025-08-16 01:00:00 |
FLA |
Florida |
TI |
Total interchange |
-1973 |
megawatthours |
2025-08-16 01:00:00 |
FLA |
Florida |
NG |
Net generation |
43032 |
megawatthours |
2025-08-16 01:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
36041 |
megawatthours |
2025-08-16 01:00:00 |
FLA |
Florida |
D |
Demand |
45013 |
megawatthours |
2025-08-16 01:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
TI |
Total interchange |
-124 |
megawatthours |
2025-08-16 01:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
NG |
Net generation |
76537 |
megawatthours |
2025-08-16 01:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
77719 |
megawatthours |
2025-08-16 01:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
76662 |
megawatthours |
2025-08-16 01:00:00 |
EPE |
El Paso Electric Company |
TI |
Total interchange |
-438 |
megawatthours |
2025-08-16 01:00:00 |
EPE |
El Paso Electric Company |
NG |
Net generation |
1307 |
megawatthours |
2025-08-16 01:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1769 |
megawatthours |
2025-08-16 01:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1744 |
megawatthours |
2025-08-16 01:00:00 |
DUK |
Duke Energy Carolinas |
TI |
Total interchange |
2096 |
megawatthours |
2025-08-16 01:00:00 |
DUK |
Duke Energy Carolinas |
NG |
Net generation |
18969 |
megawatthours |
2025-08-16 01:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
16785 |
megawatthours |
2025-08-16 01:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
16873 |
megawatthours |
2025-08-16 01:00:00 |
DOPD |
PUD No. 1 of Douglas County |
TI |
Total interchange |
284 |
megawatthours |
2025-08-16 01:00:00 |
DOPD |
PUD No. 1 of Douglas County |
NG |
Net generation |
560 |
megawatthours |
2025-08-16 01:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
311 |
megawatthours |
2025-08-16 01:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
276 |
megawatthours |
2025-08-16 01:00:00 |
DEAA |
Arlington Valley, LLC |
TI |
Total interchange |
482 |
megawatthours |
2025-08-16 01:00:00 |
DEAA |
Arlington Valley, LLC |
NG |
Net generation |
482 |
megawatthours |
2025-08-16 01:00:00 |
CPLW |
Duke Energy Progress West |
TI |
Total interchange |
15 |
megawatthours |
2025-08-16 01:00:00 |
CPLW |
Duke Energy Progress West |
NG |
Net generation |
666 |
megawatthours |
2025-08-16 01:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
666 |
megawatthours |
2025-08-16 01:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
651 |
megawatthours |
2025-08-16 01:00:00 |
CPLE |
Duke Energy Progress East |
TI |
Total interchange |
-1606 |
megawatthours |
2025-08-16 01:00:00 |
CPLE |
Duke Energy Progress East |
NG |
Net generation |
8617 |
megawatthours |
2025-08-16 01:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
9721 |
megawatthours |
2025-08-16 01:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
10223 |
megawatthours |
2025-08-16 01:00:00 |
CISO |
California Independent System Operator |
TI |
Total interchange |
-1674 |
megawatthours |
2025-08-16 01:00:00 |
CISO |
California Independent System Operator |
NG |
Net generation |
33578 |
megawatthours |
2025-08-16 01:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
34234 |
megawatthours |
2025-08-16 01:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
33259 |
megawatthours |
2025-08-16 01:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
TI |
Total interchange |
1031 |
megawatthours |
2025-08-16 01:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
NG |
Net generation |
1244 |
megawatthours |
2025-08-16 01:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
207 |
megawatthours |
2025-08-16 01:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
213 |
megawatthours |
2025-08-16 01:00:00 |
CENT |
Central |
TI |
Total interchange |
2098 |
megawatthours |
2025-08-16 01:00:00 |
CENT |
Central |
NG |
Net generation |
52827 |
megawatthours |
2025-08-16 01:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
54081 |
megawatthours |
2025-08-16 01:00:00 |
CENT |
Central |
D |
Demand |
50728 |
megawatthours |
2025-08-16 01:00:00 |
CAR |
Carolinas |
TI |
Total interchange |
928 |
megawatthours |
2025-08-16 01:00:00 |
CAR |
Carolinas |
NG |
Net generation |
35723 |
megawatthours |
2025-08-16 01:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
35334 |
megawatthours |
2025-08-16 01:00:00 |
CAR |
Carolinas |
D |
Demand |
35675 |
megawatthours |
2025-08-16 01:00:00 |
CAL |
California |
TI |
Total interchange |
-4039 |
megawatthours |
2025-08-16 01:00:00 |
CAL |
California |
NG |
Net generation |
40197 |
megawatthours |
2025-08-16 01:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
42885 |
megawatthours |
2025-08-16 01:00:00 |
CAL |
California |
D |
Demand |
42140 |
megawatthours |
2025-08-16 01:00:00 |
BPAT |
Bonneville Power Administration |
TI |
Total interchange |
3585 |
megawatthours |
2025-08-16 01:00:00 |
BPAT |
Bonneville Power Administration |
NG |
Net generation |
11040 |
megawatthours |
2025-08-16 01:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
7528 |
megawatthours |
2025-08-16 01:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
7455 |
megawatthours |
2025-08-16 01:00:00 |
BANC |
Balancing Authority of Northern California |
TI |
Total interchange |
-1530 |
megawatthours |
2025-08-16 01:00:00 |
BANC |
Balancing Authority of Northern California |
NG |
Net generation |
2148 |
megawatthours |
2025-08-16 01:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
3611 |
megawatthours |
2025-08-16 01:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
3678 |
megawatthours |
2025-08-16 01:00:00 |
AZPS |
Arizona Public Service Company |
TI |
Total interchange |
-2451 |
megawatthours |
2025-08-16 01:00:00 |
AZPS |
Arizona Public Service Company |
NG |
Net generation |
4205 |
megawatthours |
2025-08-16 01:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6986 |
megawatthours |
2025-08-16 01:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
6656 |
megawatthours |
2025-08-16 01:00:00 |
AVRN |
Avangrid Renewables, LLC |
TI |
Total interchange |
1675 |
megawatthours |
2025-08-16 01:00:00 |
AVRN |
Avangrid Renewables, LLC |
NG |
Net generation |
1675 |
megawatthours |
2025-08-16 01:00:00 |
AVA |
Avista Corporation |
TI |
Total interchange |
-308 |
megawatthours |
2025-08-16 01:00:00 |
AVA |
Avista Corporation |
NG |
Net generation |
1294 |
megawatthours |
2025-08-16 01:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1714 |
megawatthours |
2025-08-16 01:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1602 |
megawatthours |
2025-08-16 01:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
NG |
Net generation |
3964 |
megawatthours |
2025-08-16 01:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
DF |
Day-ahead demand forecast |
4121 |
megawatthours |
2025-08-16 01:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
4205 |
megawatthours |
2025-08-16 00:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
TI |
Total interchange |
189 |
megawatthours |
2025-08-16 00:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
NG |
Net generation |
190 |
megawatthours |
2025-08-16 00:00:00 |
WWA |
NaturEner Wind Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 00:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
TI |
Total interchange |
-23 |
megawatthours |
2025-08-16 00:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
NG |
Net generation |
87 |
megawatthours |
2025-08-16 00:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
114 |
megawatthours |
2025-08-16 00:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
110 |
megawatthours |
2025-08-16 00:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
TI |
Total interchange |
510 |
megawatthours |
2025-08-16 00:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
NG |
Net generation |
1760 |
megawatthours |
2025-08-16 00:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1586 |
megawatthours |
2025-08-16 00:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
1250 |
megawatthours |
2025-08-16 00:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
TI |
Total interchange |
213 |
megawatthours |
2025-08-16 00:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
NG |
Net generation |
5170 |
megawatthours |
2025-08-16 00:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4574 |
megawatthours |
2025-08-16 00:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
4957 |
megawatthours |
2025-08-16 00:00:00 |
US48 |
United States Lower 48 |
TI |
Total interchange |
-11788 |
megawatthours |
2025-08-16 00:00:00 |
US48 |
United States Lower 48 |
NG |
Net generation |
692142 |
megawatthours |
2025-08-16 00:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
646216 |
megawatthours |
2025-08-16 00:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
697575 |
megawatthours |
2025-08-16 00:00:00 |
TVA |
Tennessee Valley Authority |
TI |
Total interchange |
-2742 |
megawatthours |
2025-08-16 00:00:00 |
TVA |
Tennessee Valley Authority |
NG |
Net generation |
24854 |
megawatthours |
2025-08-16 00:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
28388 |
megawatthours |
2025-08-16 00:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
27680 |
megawatthours |
2025-08-16 00:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
TI |
Total interchange |
-287 |
megawatthours |
2025-08-16 00:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
NG |
Net generation |
200 |
megawatthours |
2025-08-16 00:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
493 |
megawatthours |
2025-08-16 00:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
487 |
megawatthours |
2025-08-16 00:00:00 |
TIDC |
Turlock Irrigation District |
TI |
Total interchange |
-244 |
megawatthours |
2025-08-16 00:00:00 |
TIDC |
Turlock Irrigation District |
NG |
Net generation |
335 |
megawatthours |
2025-08-16 00:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
580 |
megawatthours |
2025-08-16 00:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
580 |
megawatthours |
2025-08-16 00:00:00 |
TEX |
Texas |
TI |
Total interchange |
-9 |
megawatthours |
2025-08-16 00:00:00 |
TEX |
Texas |
NG |
Net generation |
79693 |
megawatthours |
2025-08-16 00:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
80259 |
megawatthours |
2025-08-16 00:00:00 |
TEX |
Texas |
D |
Demand |
79703 |
megawatthours |
2025-08-16 00:00:00 |
TEPC |
Tucson Electric Power |
TI |
Total interchange |
-491 |
megawatthours |
2025-08-16 00:00:00 |
TEPC |
Tucson Electric Power |
NG |
Net generation |
2178 |
megawatthours |
2025-08-16 00:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2554 |
megawatthours |
2025-08-16 00:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
2669 |
megawatthours |
2025-08-16 00:00:00 |
TEN |
Tennessee |
TI |
Total interchange |
-2742 |
megawatthours |
2025-08-16 00:00:00 |
TEN |
Tennessee |
NG |
Net generation |
24854 |
megawatthours |
2025-08-16 00:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
28388 |
megawatthours |
2025-08-16 00:00:00 |
TEN |
Tennessee |
D |
Demand |
27680 |
megawatthours |
2025-08-16 00:00:00 |
TEC |
Tampa Electric Company |
TI |
Total interchange |
-1193 |
megawatthours |
2025-08-16 00:00:00 |
TEC |
Tampa Electric Company |
NG |
Net generation |
2867 |
megawatthours |
2025-08-16 00:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
3999 |
megawatthours |
2025-08-16 00:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
4060 |
megawatthours |
2025-08-16 00:00:00 |
TAL |
City of Tallahassee |
TI |
Total interchange |
0 |
megawatthours |
2025-08-16 00:00:00 |
TAL |
City of Tallahassee |
NG |
Net generation |
402 |
megawatthours |
2025-08-16 00:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
447 |
megawatthours |
2025-08-16 00:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
402 |
megawatthours |
2025-08-16 00:00:00 |
SWPP |
Southwest Power Pool |
TI |
Total interchange |
1696 |
megawatthours |
2025-08-16 00:00:00 |
SWPP |
Southwest Power Pool |
NG |
Net generation |
54042 |
megawatthours |
2025-08-16 00:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
55575 |
megawatthours |
2025-08-16 00:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
52345 |
megawatthours |
2025-08-16 00:00:00 |
SW |
Southwest |
TI |
Total interchange |
573 |
megawatthours |
2025-08-16 00:00:00 |
SW |
Southwest |
NG |
Net generation |
21578 |
megawatthours |
2025-08-16 00:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
22527 |
megawatthours |
2025-08-16 00:00:00 |
SW |
Southwest |
D |
Demand |
21106 |
megawatthours |
2025-08-16 00:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
TI |
Total interchange |
2901 |
megawatthours |
2025-08-16 00:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
NG |
Net generation |
9684 |
megawatthours |
2025-08-16 00:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
7214 |
megawatthours |
2025-08-16 00:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
6870 |
megawatthours |
2025-08-16 00:00:00 |
SPA |
Southwestern Power Administration |
D |
Demand |
29 |
megawatthours |
2025-08-16 00:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
TI |
Total interchange |
4309 |
megawatthours |
2025-08-16 00:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
NG |
Net generation |
40390 |
megawatthours |
2025-08-16 00:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
38277 |
megawatthours |
2025-08-16 00:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
36081 |
megawatthours |
2025-08-16 00:00:00 |
SEPA |
Southeastern Power Administration |
TI |
Total interchange |
602 |
megawatthours |
2025-08-16 00:00:00 |
SEPA |
Southeastern Power Administration |
NG |
Net generation |
587 |
megawatthours |
2025-08-16 00:00:00 |
SEC |
Seminole Electric Cooperative |
TI |
Total interchange |
1937 |
megawatthours |
2025-08-16 00:00:00 |
SEC |
Seminole Electric Cooperative |
NG |
Net generation |
2278 |
megawatthours |
2025-08-16 00:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
389 |
megawatthours |
2025-08-16 00:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
341 |
megawatthours |
2025-08-16 00:00:00 |
SE |
Southeast |
TI |
Total interchange |
4911 |
megawatthours |
2025-08-16 00:00:00 |
SE |
Southeast |
NG |
Net generation |
40977 |
megawatthours |
2025-08-16 00:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
38277 |
megawatthours |
2025-08-16 00:00:00 |
SE |
Southeast |
D |
Demand |
36081 |
megawatthours |
2025-08-16 00:00:00 |
SCL |
Seattle City Light |
TI |
Total interchange |
-545 |
megawatthours |
2025-08-16 00:00:00 |
SCL |
Seattle City Light |
NG |
Net generation |
600 |
megawatthours |
2025-08-16 00:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
1043 |
megawatthours |
2025-08-16 00:00:00 |
SCL |
Seattle City Light |
D |
Demand |
1145 |
megawatthours |
2025-08-16 00:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
TI |
Total interchange |
197 |
megawatthours |
2025-08-16 00:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
NG |
Net generation |
4154 |
megawatthours |
2025-08-16 00:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
4116 |
megawatthours |
2025-08-16 00:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
3957 |
megawatthours |
2025-08-16 00:00:00 |
SC |
South Carolina Public Service Authority |
NG |
Net generation |
3192 |
megawatthours |
2025-08-16 00:00:00 |
SC |
South Carolina Public Service Authority |
DF |
Day-ahead demand forecast |
4392 |
megawatthours |
2025-08-16 00:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
4135 |
megawatthours |
2025-08-16 00:00:00 |
PSEI |
Puget Sound Energy, Inc. |
TI |
Total interchange |
-2184 |
megawatthours |
2025-08-16 00:00:00 |
PSEI |
Puget Sound Energy, Inc. |
NG |
Net generation |
621 |
megawatthours |
2025-08-16 00:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2227 |
megawatthours |
2025-08-16 00:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2805 |
megawatthours |
2025-08-16 00:00:00 |
PSCO |
Public Service Company of Colorado |
TI |
Total interchange |
-180 |
megawatthours |
2025-08-16 00:00:00 |
PSCO |
Public Service Company of Colorado |
NG |
Net generation |
7784 |
megawatthours |
2025-08-16 00:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
7523 |
megawatthours |
2025-08-16 00:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
7964 |
megawatthours |
2025-08-16 00:00:00 |
PNM |
Public Service Company of New Mexico |
TI |
Total interchange |
-282 |
megawatthours |
2025-08-16 00:00:00 |
PNM |
Public Service Company of New Mexico |
NG |
Net generation |
1811 |
megawatthours |
2025-08-16 00:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
2231 |
megawatthours |
2025-08-16 00:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
2108 |
megawatthours |
2025-08-16 00:00:00 |
PJM |
PJM Interconnection, LLC |
TI |
Total interchange |
-91 |
megawatthours |
2025-08-16 00:00:00 |
PJM |
PJM Interconnection, LLC |
NG |
Net generation |
143868 |
megawatthours |
2025-08-16 00:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
128434 |
megawatthours |
2025-08-16 00:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
138090 |
megawatthours |
2025-08-16 00:00:00 |
PGE |
Portland General Electric Company |
TI |
Total interchange |
-2130 |
megawatthours |
2025-08-16 00:00:00 |
PGE |
Portland General Electric Company |
NG |
Net generation |
884 |
megawatthours |
2025-08-16 00:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
3090 |
megawatthours |
2025-08-16 00:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
3014 |
megawatthours |
2025-08-16 00:00:00 |
PACW |
PacifiCorp West |
TI |
Total interchange |
-2374 |
megawatthours |
2025-08-16 00:00:00 |
PACW |
PacifiCorp West |
NG |
Net generation |
577 |
megawatthours |
2025-08-16 00:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
3038 |
megawatthours |
2025-08-16 00:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2951 |
megawatthours |
2025-08-16 00:00:00 |
PACE |
PacifiCorp East |
TI |
Total interchange |
-642 |
megawatthours |
2025-08-16 00:00:00 |
PACE |
PacifiCorp East |
NG |
Net generation |
7715 |
megawatthours |
2025-08-16 00:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
9316 |
megawatthours |
2025-08-16 00:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
8357 |
megawatthours |
2025-08-16 00:00:00 |
NYIS |
New York Independent System Operator |
TI |
Total interchange |
-281 |
megawatthours |
2025-08-16 00:00:00 |
NYIS |
New York Independent System Operator |
NG |
Net generation |
25054 |
megawatthours |
2025-08-16 00:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
24725 |
megawatthours |
2025-08-16 00:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
25335 |
megawatthours |
2025-08-16 00:00:00 |
NY |
New York |
TI |
Total interchange |
-281 |
megawatthours |
2025-08-16 00:00:00 |
NY |
New York |
NG |
Net generation |
25054 |
megawatthours |
2025-08-16 00:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
24725 |
megawatthours |
2025-08-16 00:00:00 |
NY |
New York |
D |
Demand |
25335 |
megawatthours |
2025-08-16 00:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1730 |
megawatthours |
2025-08-16 00:00:00 |
NW |
Northwest |
TI |
Total interchange |
-2764 |
megawatthours |
2025-08-16 00:00:00 |
NW |
Northwest |
NG |
Net generation |
50659 |
megawatthours |
2025-08-16 00:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
52763 |
megawatthours |
2025-08-16 00:00:00 |
NW |
Northwest |
D |
Demand |
55163 |
megawatthours |
2025-08-16 00:00:00 |
NEVP |
Nevada Power Company |
TI |
Total interchange |
-1734 |
megawatthours |
2025-08-16 00:00:00 |
NEVP |
Nevada Power Company |
NG |
Net generation |
6125 |
megawatthours |
2025-08-16 00:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
7389 |
megawatthours |
2025-08-16 00:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
7859 |
megawatthours |
2025-08-16 00:00:00 |
NE |
New England |
TI |
Total interchange |
-1776 |
megawatthours |
2025-08-16 00:00:00 |
NE |
New England |
NG |
Net generation |
16679 |
megawatthours |
2025-08-16 00:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
17980 |
megawatthours |
2025-08-16 00:00:00 |
NE |
New England |
D |
Demand |
18455 |
megawatthours |
2025-08-16 00:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
TI |
Total interchange |
-7136 |
megawatthours |
2025-08-16 00:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
NG |
Net generation |
103079 |
megawatthours |
2025-08-16 00:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
110247 |
megawatthours |
2025-08-16 00:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
108040 |
megawatthours |
2025-08-16 00:00:00 |
MIDW |
Midwest |
TI |
Total interchange |
-7004 |
megawatthours |
2025-08-16 00:00:00 |
MIDW |
Midwest |
NG |
Net generation |
113642 |
megawatthours |
2025-08-16 00:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
120659 |
megawatthours |
2025-08-16 00:00:00 |
MIDW |
Midwest |
D |
Demand |
118962 |
megawatthours |
2025-08-16 00:00:00 |
MIDA |
Mid-Atlantic |
TI |
Total interchange |
-91 |
megawatthours |
2025-08-16 00:00:00 |
MIDA |
Mid-Atlantic |
NG |
Net generation |
143868 |
megawatthours |
2025-08-16 00:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
128434 |
megawatthours |
2025-08-16 00:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
138090 |
megawatthours |
2025-08-16 00:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
TI |
Total interchange |
132 |
megawatthours |
2025-08-16 00:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
NG |
Net generation |
6596 |
megawatthours |
2025-08-16 00:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
6022 |
megawatthours |
2025-08-16 00:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
6464 |
megawatthours |
2025-08-16 00:00:00 |
LDWP |
Los Angeles Department of Water and Power |
TI |
Total interchange |
-590 |
megawatthours |
2025-08-16 00:00:00 |
LDWP |
Los Angeles Department of Water and Power |
NG |
Net generation |
3098 |
megawatthours |
2025-08-16 00:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3527 |
megawatthours |
2025-08-16 00:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
3688 |
megawatthours |
2025-08-16 00:00:00 |
JEA |
JEA |
TI |
Total interchange |
-284 |
megawatthours |
2025-08-16 00:00:00 |
JEA |
JEA |
NG |
Net generation |
1914 |
megawatthours |
2025-08-16 00:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2237 |
megawatthours |
2025-08-16 00:00:00 |
JEA |
JEA |
D |
Demand |
2201 |
megawatthours |
2025-08-16 00:00:00 |
ISNE |
ISO New England |
TI |
Total interchange |
-1776 |
megawatthours |
2025-08-16 00:00:00 |
ISNE |
ISO New England |
NG |
Net generation |
16679 |
megawatthours |
2025-08-16 00:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
17980 |
megawatthours |
2025-08-16 00:00:00 |
ISNE |
ISO New England |
D |
Demand |
18455 |
megawatthours |
2025-08-16 00:00:00 |
IPCO |
Idaho Power Company |
TI |
Total interchange |
-1172 |
megawatthours |
2025-08-16 00:00:00 |
IPCO |
Idaho Power Company |
NG |
Net generation |
2261 |
megawatthours |
2025-08-16 00:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3414 |
megawatthours |
2025-08-16 00:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
3435 |
megawatthours |
2025-08-16 00:00:00 |
IID |
Imperial Irrigation District |
NG |
Net generation |
1064 |
megawatthours |
2025-08-16 00:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
903 |
megawatthours |
2025-08-16 00:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
901 |
megawatthours |
2025-08-16 00:00:00 |
HST |
City of Homestead |
TI |
Total interchange |
-120 |
megawatthours |
2025-08-16 00:00:00 |
HST |
City of Homestead |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 00:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
122 |
megawatthours |
2025-08-16 00:00:00 |
HST |
City of Homestead |
D |
Demand |
120 |
megawatthours |
2025-08-16 00:00:00 |
GWA |
NaturEner Power Watch, LLC |
TI |
Total interchange |
0 |
megawatthours |
2025-08-16 00:00:00 |
GWA |
NaturEner Power Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-16 00:00:00 |
GVL |
Gainesville Regional Utilities |
TI |
Total interchange |
-103 |
megawatthours |
2025-08-16 00:00:00 |
GVL |
Gainesville Regional Utilities |
NG |
Net generation |
297 |
megawatthours |
2025-08-16 00:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
238 |
megawatthours |
2025-08-16 00:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
408 |
megawatthours |
2025-08-16 00:00:00 |
GRID |
Gridforce Energy Management, LLC |
TI |
Total interchange |
2178 |
megawatthours |
2025-08-16 00:00:00 |
GRID |
Gridforce Energy Management, LLC |
NG |
Net generation |
2178 |
megawatthours |
2025-08-16 00:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
TI |
Total interchange |
257 |
megawatthours |
2025-08-16 00:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
NG |
Net generation |
1146 |
megawatthours |
2025-08-16 00:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
872 |
megawatthours |
2025-08-16 00:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
897 |
megawatthours |
2025-08-16 00:00:00 |
FPL |
Florida Power & Light Co. |
TI |
Total interchange |
190 |
megawatthours |
2025-08-16 00:00:00 |
FPL |
Florida Power & Light Co. |
NG |
Net generation |
26091 |
megawatthours |
2025-08-16 00:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
25485 |
megawatthours |
2025-08-16 00:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
25901 |
megawatthours |
2025-08-16 00:00:00 |
FPC |
Duke Energy Florida, Inc. |
TI |
Total interchange |
-2584 |
megawatthours |
2025-08-16 00:00:00 |
FPC |
Duke Energy Florida, Inc. |
NG |
Net generation |
7990 |
megawatthours |
2025-08-16 00:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
8382 |
megawatthours |
2025-08-16 00:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
10574 |
megawatthours |
2025-08-16 00:00:00 |
FMPP |
Florida Municipal Power Pool |
TI |
Total interchange |
199 |
megawatthours |
2025-08-16 00:00:00 |
FMPP |
Florida Municipal Power Pool |
NG |
Net generation |
3494 |
megawatthours |
2025-08-16 00:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
3295 |
megawatthours |
2025-08-16 00:00:00 |
FLA |
Florida |
TI |
Total interchange |
-1958 |
megawatthours |
2025-08-16 00:00:00 |
FLA |
Florida |
NG |
Net generation |
45333 |
megawatthours |
2025-08-16 00:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
37300 |
megawatthours |
2025-08-16 00:00:00 |
FLA |
Florida |
D |
Demand |
47302 |
megawatthours |
2025-08-16 00:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
TI |
Total interchange |
-9 |
megawatthours |
2025-08-16 00:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
NG |
Net generation |
79693 |
megawatthours |
2025-08-16 00:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
80259 |
megawatthours |
2025-08-16 00:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
79703 |
megawatthours |
2025-08-16 00:00:00 |
EPE |
El Paso Electric Company |
TI |
Total interchange |
-505 |
megawatthours |
2025-08-16 00:00:00 |
EPE |
El Paso Electric Company |
NG |
Net generation |
1295 |
megawatthours |
2025-08-16 00:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1842 |
megawatthours |
2025-08-16 00:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1799 |
megawatthours |
2025-08-16 00:00:00 |
DUK |
Duke Energy Carolinas |
TI |
Total interchange |
2033 |
megawatthours |
2025-08-16 00:00:00 |
DUK |
Duke Energy Carolinas |
NG |
Net generation |
19622 |
megawatthours |
2025-08-16 00:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
17510 |
megawatthours |
2025-08-16 00:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
17589 |
megawatthours |
2025-08-16 00:00:00 |
DOPD |
PUD No. 1 of Douglas County |
TI |
Total interchange |
279 |
megawatthours |
2025-08-16 00:00:00 |
DOPD |
PUD No. 1 of Douglas County |
NG |
Net generation |
558 |
megawatthours |
2025-08-16 00:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
310 |
megawatthours |
2025-08-16 00:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
279 |
megawatthours |
2025-08-16 00:00:00 |
DEAA |
Arlington Valley, LLC |
TI |
Total interchange |
483 |
megawatthours |
2025-08-16 00:00:00 |
DEAA |
Arlington Valley, LLC |
NG |
Net generation |
483 |
megawatthours |
2025-08-16 00:00:00 |
CPLW |
Duke Energy Progress West |
TI |
Total interchange |
3 |
megawatthours |
2025-08-16 00:00:00 |
CPLW |
Duke Energy Progress West |
NG |
Net generation |
684 |
megawatthours |
2025-08-16 00:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
689 |
megawatthours |
2025-08-16 00:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
681 |
megawatthours |
2025-08-16 00:00:00 |
CPLE |
Duke Energy Progress East |
TI |
Total interchange |
-1745 |
megawatthours |
2025-08-16 00:00:00 |
CPLE |
Duke Energy Progress East |
NG |
Net generation |
8847 |
megawatthours |
2025-08-16 00:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
10070 |
megawatthours |
2025-08-16 00:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
10592 |
megawatthours |
2025-08-16 00:00:00 |
CISO |
California Independent System Operator |
TI |
Total interchange |
-799 |
megawatthours |
2025-08-16 00:00:00 |
CISO |
California Independent System Operator |
NG |
Net generation |
32288 |
megawatthours |
2025-08-16 00:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
32245 |
megawatthours |
2025-08-16 00:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
31525 |
megawatthours |
2025-08-16 00:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
TI |
Total interchange |
754 |
megawatthours |
2025-08-16 00:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
NG |
Net generation |
968 |
megawatthours |
2025-08-16 00:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
206 |
megawatthours |
2025-08-16 00:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
214 |
megawatthours |
2025-08-16 00:00:00 |
CENT |
Central |
TI |
Total interchange |
1696 |
megawatthours |
2025-08-16 00:00:00 |
CENT |
Central |
NG |
Net generation |
54042 |
megawatthours |
2025-08-16 00:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
55575 |
megawatthours |
2025-08-16 00:00:00 |
CENT |
Central |
D |
Demand |
52374 |
megawatthours |
2025-08-16 00:00:00 |
CAR |
Carolinas |
TI |
Total interchange |
677 |
megawatthours |
2025-08-16 00:00:00 |
CAR |
Carolinas |
NG |
Net generation |
36689 |
megawatthours |
2025-08-16 00:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
36777 |
megawatthours |
2025-08-16 00:00:00 |
CAR |
Carolinas |
D |
Demand |
36954 |
megawatthours |
2025-08-16 00:00:00 |
CAL |
California |
TI |
Total interchange |
-3020 |
megawatthours |
2025-08-16 00:00:00 |
CAL |
California |
NG |
Net generation |
39074 |
megawatthours |
2025-08-16 00:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
40829 |
megawatthours |
2025-08-16 00:00:00 |
CAL |
California |
D |
Demand |
40370 |
megawatthours |
2025-08-16 00:00:00 |
BPAT |
Bonneville Power Administration |
TI |
Total interchange |
3659 |
megawatthours |
2025-08-16 00:00:00 |
BPAT |
Bonneville Power Administration |
NG |
Net generation |
11030 |
megawatthours |
2025-08-16 00:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
7450 |
megawatthours |
2025-08-16 00:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
7371 |
megawatthours |
2025-08-16 00:00:00 |
BANC |
Balancing Authority of Northern California |
TI |
Total interchange |
-1387 |
megawatthours |
2025-08-16 00:00:00 |
BANC |
Balancing Authority of Northern California |
NG |
Net generation |
2289 |
megawatthours |
2025-08-16 00:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
3574 |
megawatthours |
2025-08-16 00:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
3676 |
megawatthours |
2025-08-16 00:00:00 |
AZPS |
Arizona Public Service Company |
TI |
Total interchange |
-2043 |
megawatthours |
2025-08-16 00:00:00 |
AZPS |
Arizona Public Service Company |
NG |
Net generation |
4367 |
megawatthours |
2025-08-16 00:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
7100 |
megawatthours |
2025-08-16 00:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
6410 |
megawatthours |
2025-08-16 00:00:00 |
AVRN |
Avangrid Renewables, LLC |
TI |
Total interchange |
1678 |
megawatthours |
2025-08-16 00:00:00 |
AVRN |
Avangrid Renewables, LLC |
NG |
Net generation |
1678 |
megawatthours |
2025-08-16 00:00:00 |
AVA |
Avista Corporation |
TI |
Total interchange |
-511 |
megawatthours |
2025-08-16 00:00:00 |
AVA |
Avista Corporation |
NG |
Net generation |
1077 |
megawatthours |
2025-08-16 00:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1704 |
megawatthours |
2025-08-16 00:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1588 |
megawatthours |
2025-08-16 00:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
NG |
Net generation |
3967 |
megawatthours |
2025-08-16 00:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
DF |
Day-ahead demand forecast |
4390 |
megawatthours |
2025-08-16 00:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
4458 |
megawatthours |
2025-08-15 23:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
TI |
Total interchange |
183 |
megawatthours |
2025-08-15 23:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
NG |
Net generation |
188 |
megawatthours |
2025-08-15 23:00:00 |
WWA |
NaturEner Wind Watch, LLC |
NG |
Net generation |
7 |
megawatthours |
2025-08-15 23:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
TI |
Total interchange |
-24 |
megawatthours |
2025-08-15 23:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
NG |
Net generation |
85 |
megawatthours |
2025-08-15 23:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
117 |
megawatthours |
2025-08-15 23:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
109 |
megawatthours |
2025-08-15 23:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
TI |
Total interchange |
334 |
megawatthours |
2025-08-15 23:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
NG |
Net generation |
1628 |
megawatthours |
2025-08-15 23:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1543 |
megawatthours |
2025-08-15 23:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
1294 |
megawatthours |
2025-08-15 23:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
TI |
Total interchange |
-215 |
megawatthours |
2025-08-15 23:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
NG |
Net generation |
4888 |
megawatthours |
2025-08-15 23:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4581 |
megawatthours |
2025-08-15 23:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
5103 |
megawatthours |
2025-08-15 23:00:00 |
US48 |
United States Lower 48 |
TI |
Total interchange |
-13480 |
megawatthours |
2025-08-15 23:00:00 |
US48 |
United States Lower 48 |
NG |
Net generation |
706969 |
megawatthours |
2025-08-15 23:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
659545 |
megawatthours |
2025-08-15 23:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
714472 |
megawatthours |
2025-08-15 23:00:00 |
TVA |
Tennessee Valley Authority |
TI |
Total interchange |
-2882 |
megawatthours |
2025-08-15 23:00:00 |
TVA |
Tennessee Valley Authority |
NG |
Net generation |
25732 |
megawatthours |
2025-08-15 23:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
29559 |
megawatthours |
2025-08-15 23:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
28760 |
megawatthours |
2025-08-15 23:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
TI |
Total interchange |
-363 |
megawatthours |
2025-08-15 23:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
NG |
Net generation |
125 |
megawatthours |
2025-08-15 23:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
490 |
megawatthours |
2025-08-15 23:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
488 |
megawatthours |
2025-08-15 23:00:00 |
TIDC |
Turlock Irrigation District |
TI |
Total interchange |
-281 |
megawatthours |
2025-08-15 23:00:00 |
TIDC |
Turlock Irrigation District |
NG |
Net generation |
276 |
megawatthours |
2025-08-15 23:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
559 |
megawatthours |
2025-08-15 23:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
557 |
megawatthours |
2025-08-15 23:00:00 |
TEX |
Texas |
TI |
Total interchange |
-13 |
megawatthours |
2025-08-15 23:00:00 |
TEX |
Texas |
NG |
Net generation |
80978 |
megawatthours |
2025-08-15 23:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
81890 |
megawatthours |
2025-08-15 23:00:00 |
TEX |
Texas |
D |
Demand |
80992 |
megawatthours |
2025-08-15 23:00:00 |
TEPC |
Tucson Electric Power |
TI |
Total interchange |
-487 |
megawatthours |
2025-08-15 23:00:00 |
TEPC |
Tucson Electric Power |
NG |
Net generation |
2083 |
megawatthours |
2025-08-15 23:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2507 |
megawatthours |
2025-08-15 23:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
2570 |
megawatthours |
2025-08-15 23:00:00 |
TEN |
Tennessee |
TI |
Total interchange |
-2882 |
megawatthours |
2025-08-15 23:00:00 |
TEN |
Tennessee |
NG |
Net generation |
25732 |
megawatthours |
2025-08-15 23:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
29559 |
megawatthours |
2025-08-15 23:00:00 |
TEN |
Tennessee |
D |
Demand |
28760 |
megawatthours |
2025-08-15 23:00:00 |
TEC |
Tampa Electric Company |
TI |
Total interchange |
-1162 |
megawatthours |
2025-08-15 23:00:00 |
TEC |
Tampa Electric Company |
NG |
Net generation |
3128 |
megawatthours |
2025-08-15 23:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
4225 |
megawatthours |
2025-08-15 23:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
4290 |
megawatthours |
2025-08-15 23:00:00 |
TAL |
City of Tallahassee |
TI |
Total interchange |
-2 |
megawatthours |
2025-08-15 23:00:00 |
TAL |
City of Tallahassee |
NG |
Net generation |
420 |
megawatthours |
2025-08-15 23:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
458 |
megawatthours |
2025-08-15 23:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
421 |
megawatthours |
2025-08-15 23:00:00 |
SWPP |
Southwest Power Pool |
TI |
Total interchange |
835 |
megawatthours |
2025-08-15 23:00:00 |
SWPP |
Southwest Power Pool |
NG |
Net generation |
54096 |
megawatthours |
2025-08-15 23:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
56469 |
megawatthours |
2025-08-15 23:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
53261 |
megawatthours |
2025-08-15 23:00:00 |
SW |
Southwest |
TI |
Total interchange |
962 |
megawatthours |
2025-08-15 23:00:00 |
SW |
Southwest |
NG |
Net generation |
21219 |
megawatthours |
2025-08-15 23:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
22240 |
megawatthours |
2025-08-15 23:00:00 |
SW |
Southwest |
D |
Demand |
20546 |
megawatthours |
2025-08-15 23:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
TI |
Total interchange |
3586 |
megawatthours |
2025-08-15 23:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
NG |
Net generation |
9818 |
megawatthours |
2025-08-15 23:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
7158 |
megawatthours |
2025-08-15 23:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
6503 |
megawatthours |
2025-08-15 23:00:00 |
SPA |
Southwestern Power Administration |
D |
Demand |
39 |
megawatthours |
2025-08-15 23:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
TI |
Total interchange |
3309 |
megawatthours |
2025-08-15 23:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
NG |
Net generation |
41324 |
megawatthours |
2025-08-15 23:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
39996 |
megawatthours |
2025-08-15 23:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
38015 |
megawatthours |
2025-08-15 23:00:00 |
SEPA |
Southeastern Power Administration |
TI |
Total interchange |
766 |
megawatthours |
2025-08-15 23:00:00 |
SEPA |
Southeastern Power Administration |
NG |
Net generation |
758 |
megawatthours |
2025-08-15 23:00:00 |
SEC |
Seminole Electric Cooperative |
TI |
Total interchange |
1960 |
megawatthours |
2025-08-15 23:00:00 |
SEC |
Seminole Electric Cooperative |
NG |
Net generation |
2320 |
megawatthours |
2025-08-15 23:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
411 |
megawatthours |
2025-08-15 23:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
359 |
megawatthours |
2025-08-15 23:00:00 |
SE |
Southeast |
TI |
Total interchange |
4075 |
megawatthours |
2025-08-15 23:00:00 |
SE |
Southeast |
NG |
Net generation |
42082 |
megawatthours |
2025-08-15 23:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
39996 |
megawatthours |
2025-08-15 23:00:00 |
SE |
Southeast |
D |
Demand |
38015 |
megawatthours |
2025-08-15 23:00:00 |
SCL |
Seattle City Light |
TI |
Total interchange |
-808 |
megawatthours |
2025-08-15 23:00:00 |
SCL |
Seattle City Light |
NG |
Net generation |
339 |
megawatthours |
2025-08-15 23:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
1036 |
megawatthours |
2025-08-15 23:00:00 |
SCL |
Seattle City Light |
D |
Demand |
1147 |
megawatthours |
2025-08-15 23:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
TI |
Total interchange |
239 |
megawatthours |
2025-08-15 23:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
NG |
Net generation |
4365 |
megawatthours |
2025-08-15 23:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
4302 |
megawatthours |
2025-08-15 23:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
4126 |
megawatthours |
2025-08-15 23:00:00 |
SC |
South Carolina Public Service Authority |
NG |
Net generation |
3270 |
megawatthours |
2025-08-15 23:00:00 |
SC |
South Carolina Public Service Authority |
DF |
Day-ahead demand forecast |
4501 |
megawatthours |
2025-08-15 23:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
4331 |
megawatthours |
2025-08-15 23:00:00 |
PSEI |
Puget Sound Energy, Inc. |
TI |
Total interchange |
-2159 |
megawatthours |
2025-08-15 23:00:00 |
PSEI |
Puget Sound Energy, Inc. |
NG |
Net generation |
639 |
megawatthours |
2025-08-15 23:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2208 |
megawatthours |
2025-08-15 23:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2798 |
megawatthours |
2025-08-15 23:00:00 |
PSCO |
Public Service Company of Colorado |
TI |
Total interchange |
67 |
megawatthours |
2025-08-15 23:00:00 |
PSCO |
Public Service Company of Colorado |
NG |
Net generation |
8397 |
megawatthours |
2025-08-15 23:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
7556 |
megawatthours |
2025-08-15 23:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
8330 |
megawatthours |
2025-08-15 23:00:00 |
PNM |
Public Service Company of New Mexico |
TI |
Total interchange |
-113 |
megawatthours |
2025-08-15 23:00:00 |
PNM |
Public Service Company of New Mexico |
NG |
Net generation |
2005 |
megawatthours |
2025-08-15 23:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
2224 |
megawatthours |
2025-08-15 23:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
2137 |
megawatthours |
2025-08-15 23:00:00 |
PJM |
PJM Interconnection, LLC |
TI |
Total interchange |
-323 |
megawatthours |
2025-08-15 23:00:00 |
PJM |
PJM Interconnection, LLC |
NG |
Net generation |
149230 |
megawatthours |
2025-08-15 23:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
133894 |
megawatthours |
2025-08-15 23:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
143330 |
megawatthours |
2025-08-15 23:00:00 |
PGE |
Portland General Electric Company |
TI |
Total interchange |
-2143 |
megawatthours |
2025-08-15 23:00:00 |
PGE |
Portland General Electric Company |
NG |
Net generation |
846 |
megawatthours |
2025-08-15 23:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
3033 |
megawatthours |
2025-08-15 23:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2989 |
megawatthours |
2025-08-15 23:00:00 |
PACW |
PacifiCorp West |
TI |
Total interchange |
-2303 |
megawatthours |
2025-08-15 23:00:00 |
PACW |
PacifiCorp West |
NG |
Net generation |
632 |
megawatthours |
2025-08-15 23:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2990 |
megawatthours |
2025-08-15 23:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2935 |
megawatthours |
2025-08-15 23:00:00 |
PACE |
PacifiCorp East |
TI |
Total interchange |
-340 |
megawatthours |
2025-08-15 23:00:00 |
PACE |
PacifiCorp East |
NG |
Net generation |
8183 |
megawatthours |
2025-08-15 23:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
9265 |
megawatthours |
2025-08-15 23:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
8523 |
megawatthours |
2025-08-15 23:00:00 |
NYIS |
New York Independent System Operator |
TI |
Total interchange |
-900 |
megawatthours |
2025-08-15 23:00:00 |
NYIS |
New York Independent System Operator |
NG |
Net generation |
24929 |
megawatthours |
2025-08-15 23:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
25127 |
megawatthours |
2025-08-15 23:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
25829 |
megawatthours |
2025-08-15 23:00:00 |
NY |
New York |
TI |
Total interchange |
-900 |
megawatthours |
2025-08-15 23:00:00 |
NY |
New York |
NG |
Net generation |
24929 |
megawatthours |
2025-08-15 23:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
25127 |
megawatthours |
2025-08-15 23:00:00 |
NY |
New York |
D |
Demand |
25829 |
megawatthours |
2025-08-15 23:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1674 |
megawatthours |
2025-08-15 23:00:00 |
NW |
Northwest |
TI |
Total interchange |
-3172 |
megawatthours |
2025-08-15 23:00:00 |
NW |
Northwest |
NG |
Net generation |
50477 |
megawatthours |
2025-08-15 23:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
52304 |
megawatthours |
2025-08-15 23:00:00 |
NW |
Northwest |
D |
Demand |
55325 |
megawatthours |
2025-08-15 23:00:00 |
NEVP |
Nevada Power Company |
TI |
Total interchange |
-1481 |
megawatthours |
2025-08-15 23:00:00 |
NEVP |
Nevada Power Company |
NG |
Net generation |
6052 |
megawatthours |
2025-08-15 23:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
7296 |
megawatthours |
2025-08-15 23:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
7533 |
megawatthours |
2025-08-15 23:00:00 |
NE |
New England |
TI |
Total interchange |
-1925 |
megawatthours |
2025-08-15 23:00:00 |
NE |
New England |
NG |
Net generation |
16846 |
megawatthours |
2025-08-15 23:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
18400 |
megawatthours |
2025-08-15 23:00:00 |
NE |
New England |
D |
Demand |
18771 |
megawatthours |
2025-08-15 23:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
TI |
Total interchange |
-5765 |
megawatthours |
2025-08-15 23:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
NG |
Net generation |
106992 |
megawatthours |
2025-08-15 23:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
112785 |
megawatthours |
2025-08-15 23:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
110612 |
megawatthours |
2025-08-15 23:00:00 |
MIDW |
Midwest |
TI |
Total interchange |
-5915 |
megawatthours |
2025-08-15 23:00:00 |
MIDW |
Midwest |
NG |
Net generation |
117410 |
megawatthours |
2025-08-15 23:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
123550 |
megawatthours |
2025-08-15 23:00:00 |
MIDW |
Midwest |
D |
Demand |
121763 |
megawatthours |
2025-08-15 23:00:00 |
MIDA |
Mid-Atlantic |
TI |
Total interchange |
-323 |
megawatthours |
2025-08-15 23:00:00 |
MIDA |
Mid-Atlantic |
NG |
Net generation |
149230 |
megawatthours |
2025-08-15 23:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
133894 |
megawatthours |
2025-08-15 23:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
143330 |
megawatthours |
2025-08-15 23:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
TI |
Total interchange |
-150 |
megawatthours |
2025-08-15 23:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
NG |
Net generation |
6448 |
megawatthours |
2025-08-15 23:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
6255 |
megawatthours |
2025-08-15 23:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
6598 |
megawatthours |
2025-08-15 23:00:00 |
LDWP |
Los Angeles Department of Water and Power |
TI |
Total interchange |
-557 |
megawatthours |
2025-08-15 23:00:00 |
LDWP |
Los Angeles Department of Water and Power |
NG |
Net generation |
3109 |
megawatthours |
2025-08-15 23:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3429 |
megawatthours |
2025-08-15 23:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
3666 |
megawatthours |
2025-08-15 23:00:00 |
JEA |
JEA |
TI |
Total interchange |
-278 |
megawatthours |
2025-08-15 23:00:00 |
JEA |
JEA |
NG |
Net generation |
1991 |
megawatthours |
2025-08-15 23:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2316 |
megawatthours |
2025-08-15 23:00:00 |
JEA |
JEA |
D |
Demand |
2270 |
megawatthours |
2025-08-15 23:00:00 |
ISNE |
ISO New England |
TI |
Total interchange |
-1925 |
megawatthours |
2025-08-15 23:00:00 |
ISNE |
ISO New England |
NG |
Net generation |
16846 |
megawatthours |
2025-08-15 23:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
18400 |
megawatthours |
2025-08-15 23:00:00 |
ISNE |
ISO New England |
D |
Demand |
18771 |
megawatthours |
2025-08-15 23:00:00 |
IPCO |
Idaho Power Company |
TI |
Total interchange |
-1182 |
megawatthours |
2025-08-15 23:00:00 |
IPCO |
Idaho Power Company |
NG |
Net generation |
2219 |
megawatthours |
2025-08-15 23:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3344 |
megawatthours |
2025-08-15 23:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
3403 |
megawatthours |
2025-08-15 23:00:00 |
IID |
Imperial Irrigation District |
NG |
Net generation |
1128 |
megawatthours |
2025-08-15 23:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
881 |
megawatthours |
2025-08-15 23:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
877 |
megawatthours |
2025-08-15 23:00:00 |
HST |
City of Homestead |
TI |
Total interchange |
-122 |
megawatthours |
2025-08-15 23:00:00 |
HST |
City of Homestead |
NG |
Net generation |
0 |
megawatthours |
2025-08-15 23:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
124 |
megawatthours |
2025-08-15 23:00:00 |
HST |
City of Homestead |
D |
Demand |
122 |
megawatthours |
2025-08-15 23:00:00 |
GWA |
NaturEner Power Watch, LLC |
TI |
Total interchange |
0 |
megawatthours |
2025-08-15 23:00:00 |
GWA |
NaturEner Power Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-15 23:00:00 |
GVL |
Gainesville Regional Utilities |
TI |
Total interchange |
-119 |
megawatthours |
2025-08-15 23:00:00 |
GVL |
Gainesville Regional Utilities |
NG |
Net generation |
306 |
megawatthours |
2025-08-15 23:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
240 |
megawatthours |
2025-08-15 23:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
433 |
megawatthours |
2025-08-15 23:00:00 |
GRID |
Gridforce Energy Management, LLC |
TI |
Total interchange |
2247 |
megawatthours |
2025-08-15 23:00:00 |
GRID |
Gridforce Energy Management, LLC |
NG |
Net generation |
2247 |
megawatthours |
2025-08-15 23:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
TI |
Total interchange |
22 |
megawatthours |
2025-08-15 23:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
NG |
Net generation |
919 |
megawatthours |
2025-08-15 23:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
869 |
megawatthours |
2025-08-15 23:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
904 |
megawatthours |
2025-08-15 23:00:00 |
FPL |
Florida Power & Light Co. |
TI |
Total interchange |
309 |
megawatthours |
2025-08-15 23:00:00 |
FPL |
Florida Power & Light Co. |
NG |
Net generation |
27568 |
megawatthours |
2025-08-15 23:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
26751 |
megawatthours |
2025-08-15 23:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
27259 |
megawatthours |
2025-08-15 23:00:00 |
FPC |
Duke Energy Florida, Inc. |
TI |
Total interchange |
-2499 |
megawatthours |
2025-08-15 23:00:00 |
FPC |
Duke Energy Florida, Inc. |
NG |
Net generation |
8627 |
megawatthours |
2025-08-15 23:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
8774 |
megawatthours |
2025-08-15 23:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
11126 |
megawatthours |
2025-08-15 23:00:00 |
FMPP |
Florida Municipal Power Pool |
TI |
Total interchange |
119 |
megawatthours |
2025-08-15 23:00:00 |
FMPP |
Florida Municipal Power Pool |
NG |
Net generation |
3577 |
megawatthours |
2025-08-15 23:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
3458 |
megawatthours |
2025-08-15 23:00:00 |
FLA |
Florida |
TI |
Total interchange |
-1794 |
megawatthours |
2025-08-15 23:00:00 |
FLA |
Florida |
NG |
Net generation |
47937 |
megawatthours |
2025-08-15 23:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
39074 |
megawatthours |
2025-08-15 23:00:00 |
FLA |
Florida |
D |
Demand |
49738 |
megawatthours |
2025-08-15 23:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
TI |
Total interchange |
-13 |
megawatthours |
2025-08-15 23:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
NG |
Net generation |
80978 |
megawatthours |
2025-08-15 23:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
81890 |
megawatthours |
2025-08-15 23:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
80992 |
megawatthours |
2025-08-15 23:00:00 |
EPE |
El Paso Electric Company |
TI |
Total interchange |
-507 |
megawatthours |
2025-08-15 23:00:00 |
EPE |
El Paso Electric Company |
NG |
Net generation |
1284 |
megawatthours |
2025-08-15 23:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1874 |
megawatthours |
2025-08-15 23:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1790 |
megawatthours |
2025-08-15 23:00:00 |
DUK |
Duke Energy Carolinas |
TI |
Total interchange |
1534 |
megawatthours |
2025-08-15 23:00:00 |
DUK |
Duke Energy Carolinas |
NG |
Net generation |
20144 |
megawatthours |
2025-08-15 23:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
18374 |
megawatthours |
2025-08-15 23:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
18610 |
megawatthours |
2025-08-15 23:00:00 |
DOPD |
PUD No. 1 of Douglas County |
TI |
Total interchange |
277 |
megawatthours |
2025-08-15 23:00:00 |
DOPD |
PUD No. 1 of Douglas County |
NG |
Net generation |
558 |
megawatthours |
2025-08-15 23:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
316 |
megawatthours |
2025-08-15 23:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
281 |
megawatthours |
2025-08-15 23:00:00 |
DEAA |
Arlington Valley, LLC |
TI |
Total interchange |
404 |
megawatthours |
2025-08-15 23:00:00 |
DEAA |
Arlington Valley, LLC |
NG |
Net generation |
404 |
megawatthours |
2025-08-15 23:00:00 |
CPLW |
Duke Energy Progress West |
TI |
Total interchange |
-25 |
megawatthours |
2025-08-15 23:00:00 |
CPLW |
Duke Energy Progress West |
NG |
Net generation |
679 |
megawatthours |
2025-08-15 23:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
728 |
megawatthours |
2025-08-15 23:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
704 |
megawatthours |
2025-08-15 23:00:00 |
CPLE |
Duke Energy Progress East |
TI |
Total interchange |
-1419 |
megawatthours |
2025-08-15 23:00:00 |
CPLE |
Duke Energy Progress East |
NG |
Net generation |
9459 |
megawatthours |
2025-08-15 23:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
10505 |
megawatthours |
2025-08-15 23:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
10878 |
megawatthours |
2025-08-15 23:00:00 |
CISO |
California Independent System Operator |
TI |
Total interchange |
-679 |
megawatthours |
2025-08-15 23:00:00 |
CISO |
California Independent System Operator |
NG |
Net generation |
31325 |
megawatthours |
2025-08-15 23:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
30360 |
megawatthours |
2025-08-15 23:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
30841 |
megawatthours |
2025-08-15 23:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
TI |
Total interchange |
741 |
megawatthours |
2025-08-15 23:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
NG |
Net generation |
954 |
megawatthours |
2025-08-15 23:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
205 |
megawatthours |
2025-08-15 23:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
213 |
megawatthours |
2025-08-15 23:00:00 |
CENT |
Central |
TI |
Total interchange |
835 |
megawatthours |
2025-08-15 23:00:00 |
CENT |
Central |
NG |
Net generation |
54096 |
megawatthours |
2025-08-15 23:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
56469 |
megawatthours |
2025-08-15 23:00:00 |
CENT |
Central |
D |
Demand |
53300 |
megawatthours |
2025-08-15 23:00:00 |
CAR |
Carolinas |
TI |
Total interchange |
512 |
megawatthours |
2025-08-15 23:00:00 |
CAR |
Carolinas |
NG |
Net generation |
38105 |
megawatthours |
2025-08-15 23:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
38410 |
megawatthours |
2025-08-15 23:00:00 |
CAR |
Carolinas |
D |
Demand |
38649 |
megawatthours |
2025-08-15 23:00:00 |
CAL |
California |
TI |
Total interchange |
-2940 |
megawatthours |
2025-08-15 23:00:00 |
CAL |
California |
NG |
Net generation |
37928 |
megawatthours |
2025-08-15 23:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
38628 |
megawatthours |
2025-08-15 23:00:00 |
CAL |
California |
D |
Demand |
39454 |
megawatthours |
2025-08-15 23:00:00 |
BPAT |
Bonneville Power Administration |
TI |
Total interchange |
3536 |
megawatthours |
2025-08-15 23:00:00 |
BPAT |
Bonneville Power Administration |
NG |
Net generation |
10855 |
megawatthours |
2025-08-15 23:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
7332 |
megawatthours |
2025-08-15 23:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
7319 |
megawatthours |
2025-08-15 23:00:00 |
BANC |
Balancing Authority of Northern California |
TI |
Total interchange |
-1423 |
megawatthours |
2025-08-15 23:00:00 |
BANC |
Balancing Authority of Northern California |
NG |
Net generation |
2090 |
megawatthours |
2025-08-15 23:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
3399 |
megawatthours |
2025-08-15 23:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
3513 |
megawatthours |
2025-08-15 23:00:00 |
AZPS |
Arizona Public Service Company |
TI |
Total interchange |
-2255 |
megawatthours |
2025-08-15 23:00:00 |
AZPS |
Arizona Public Service Company |
NG |
Net generation |
3997 |
megawatthours |
2025-08-15 23:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6934 |
megawatthours |
2025-08-15 23:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
6252 |
megawatthours |
2025-08-15 23:00:00 |
AVRN |
Avangrid Renewables, LLC |
TI |
Total interchange |
1615 |
megawatthours |
2025-08-15 23:00:00 |
AVRN |
Avangrid Renewables, LLC |
NG |
Net generation |
1615 |
megawatthours |
2025-08-15 23:00:00 |
AVA |
Avista Corporation |
TI |
Total interchange |
-659 |
megawatthours |
2025-08-15 23:00:00 |
AVA |
Avista Corporation |
NG |
Net generation |
917 |
megawatthours |
2025-08-15 23:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1666 |
megawatthours |
2025-08-15 23:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1576 |
megawatthours |
2025-08-15 23:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
NG |
Net generation |
3970 |
megawatthours |
2025-08-15 23:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
DF |
Day-ahead demand forecast |
4510 |
megawatthours |
2025-08-15 23:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
4553 |
megawatthours |
2025-08-15 22:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
TI |
Total interchange |
185 |
megawatthours |
2025-08-15 22:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
NG |
Net generation |
190 |
megawatthours |
2025-08-15 22:00:00 |
WWA |
NaturEner Wind Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-15 22:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
TI |
Total interchange |
-22 |
megawatthours |
2025-08-15 22:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
NG |
Net generation |
86 |
megawatthours |
2025-08-15 22:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
117 |
megawatthours |
2025-08-15 22:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
108 |
megawatthours |
2025-08-15 22:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
TI |
Total interchange |
321 |
megawatthours |
2025-08-15 22:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
NG |
Net generation |
1548 |
megawatthours |
2025-08-15 22:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1552 |
megawatthours |
2025-08-15 22:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
1227 |
megawatthours |
2025-08-15 22:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
TI |
Total interchange |
-151 |
megawatthours |
2025-08-15 22:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
NG |
Net generation |
5004 |
megawatthours |
2025-08-15 22:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4551 |
megawatthours |
2025-08-15 22:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
5155 |
megawatthours |
2025-08-15 22:00:00 |
US48 |
United States Lower 48 |
TI |
Total interchange |
-11895 |
megawatthours |
2025-08-15 22:00:00 |
US48 |
United States Lower 48 |
NG |
Net generation |
714624 |
megawatthours |
2025-08-15 22:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
664921 |
megawatthours |
2025-08-15 22:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
722301 |
megawatthours |
2025-08-15 22:00:00 |
TVA |
Tennessee Valley Authority |
TI |
Total interchange |
-2941 |
megawatthours |
2025-08-15 22:00:00 |
TVA |
Tennessee Valley Authority |
NG |
Net generation |
26460 |
megawatthours |
2025-08-15 22:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
30006 |
megawatthours |
2025-08-15 22:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
29575 |
megawatthours |
2025-08-15 22:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
TI |
Total interchange |
-372 |
megawatthours |
2025-08-15 22:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
NG |
Net generation |
124 |
megawatthours |
2025-08-15 22:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
495 |
megawatthours |
2025-08-15 22:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
496 |
megawatthours |
2025-08-15 22:00:00 |
TIDC |
Turlock Irrigation District |
TI |
Total interchange |
-245 |
megawatthours |
2025-08-15 22:00:00 |
TIDC |
Turlock Irrigation District |
NG |
Net generation |
277 |
megawatthours |
2025-08-15 22:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
529 |
megawatthours |
2025-08-15 22:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
523 |
megawatthours |
2025-08-15 22:00:00 |
TEX |
Texas |
TI |
Total interchange |
16 |
megawatthours |
2025-08-15 22:00:00 |
TEX |
Texas |
NG |
Net generation |
81102 |
megawatthours |
2025-08-15 22:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
82356 |
megawatthours |
2025-08-15 22:00:00 |
TEX |
Texas |
D |
Demand |
81087 |
megawatthours |
2025-08-15 22:00:00 |
TEPC |
Tucson Electric Power |
TI |
Total interchange |
-349 |
megawatthours |
2025-08-15 22:00:00 |
TEPC |
Tucson Electric Power |
NG |
Net generation |
2089 |
megawatthours |
2025-08-15 22:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2443 |
megawatthours |
2025-08-15 22:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
2438 |
megawatthours |
2025-08-15 22:00:00 |
TEN |
Tennessee |
TI |
Total interchange |
-2941 |
megawatthours |
2025-08-15 22:00:00 |
TEN |
Tennessee |
NG |
Net generation |
26460 |
megawatthours |
2025-08-15 22:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
30006 |
megawatthours |
2025-08-15 22:00:00 |
TEN |
Tennessee |
D |
Demand |
29575 |
megawatthours |
2025-08-15 22:00:00 |
TEC |
Tampa Electric Company |
TI |
Total interchange |
-1188 |
megawatthours |
2025-08-15 22:00:00 |
TEC |
Tampa Electric Company |
NG |
Net generation |
3241 |
megawatthours |
2025-08-15 22:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
4433 |
megawatthours |
2025-08-15 22:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
4429 |
megawatthours |
2025-08-15 22:00:00 |
TAL |
City of Tallahassee |
TI |
Total interchange |
-39 |
megawatthours |
2025-08-15 22:00:00 |
TAL |
City of Tallahassee |
NG |
Net generation |
392 |
megawatthours |
2025-08-15 22:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
474 |
megawatthours |
2025-08-15 22:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
430 |
megawatthours |
2025-08-15 22:00:00 |
SWPP |
Southwest Power Pool |
TI |
Total interchange |
422 |
megawatthours |
2025-08-15 22:00:00 |
SWPP |
Southwest Power Pool |
NG |
Net generation |
54109 |
megawatthours |
2025-08-15 22:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
56729 |
megawatthours |
2025-08-15 22:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
53687 |
megawatthours |
2025-08-15 22:00:00 |
SW |
Southwest |
TI |
Total interchange |
1257 |
megawatthours |
2025-08-15 22:00:00 |
SW |
Southwest |
NG |
Net generation |
20721 |
megawatthours |
2025-08-15 22:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
21894 |
megawatthours |
2025-08-15 22:00:00 |
SW |
Southwest |
D |
Demand |
19801 |
megawatthours |
2025-08-15 22:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
TI |
Total interchange |
3788 |
megawatthours |
2025-08-15 22:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
NG |
Net generation |
9808 |
megawatthours |
2025-08-15 22:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
7058 |
megawatthours |
2025-08-15 22:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
6307 |
megawatthours |
2025-08-15 22:00:00 |
SPA |
Southwestern Power Administration |
D |
Demand |
24 |
megawatthours |
2025-08-15 22:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
TI |
Total interchange |
3452 |
megawatthours |
2025-08-15 22:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
NG |
Net generation |
42847 |
megawatthours |
2025-08-15 22:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
41383 |
megawatthours |
2025-08-15 22:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
39395 |
megawatthours |
2025-08-15 22:00:00 |
SEPA |
Southeastern Power Administration |
TI |
Total interchange |
918 |
megawatthours |
2025-08-15 22:00:00 |
SEPA |
Southeastern Power Administration |
NG |
Net generation |
912 |
megawatthours |
2025-08-15 22:00:00 |
SEC |
Seminole Electric Cooperative |
TI |
Total interchange |
2042 |
megawatthours |
2025-08-15 22:00:00 |
SEC |
Seminole Electric Cooperative |
NG |
Net generation |
2380 |
megawatthours |
2025-08-15 22:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
424 |
megawatthours |
2025-08-15 22:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
338 |
megawatthours |
2025-08-15 22:00:00 |
SE |
Southeast |
TI |
Total interchange |
4370 |
megawatthours |
2025-08-15 22:00:00 |
SE |
Southeast |
NG |
Net generation |
43759 |
megawatthours |
2025-08-15 22:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
41383 |
megawatthours |
2025-08-15 22:00:00 |
SE |
Southeast |
D |
Demand |
39395 |
megawatthours |
2025-08-15 22:00:00 |
SCL |
Seattle City Light |
TI |
Total interchange |
-838 |
megawatthours |
2025-08-15 22:00:00 |
SCL |
Seattle City Light |
NG |
Net generation |
312 |
megawatthours |
2025-08-15 22:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
1028 |
megawatthours |
2025-08-15 22:00:00 |
SCL |
Seattle City Light |
D |
Demand |
1150 |
megawatthours |
2025-08-15 22:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
TI |
Total interchange |
255 |
megawatthours |
2025-08-15 22:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
NG |
Net generation |
4520 |
megawatthours |
2025-08-15 22:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
4425 |
megawatthours |
2025-08-15 22:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
4265 |
megawatthours |
2025-08-15 22:00:00 |
SC |
South Carolina Public Service Authority |
NG |
Net generation |
3212 |
megawatthours |
2025-08-15 22:00:00 |
SC |
South Carolina Public Service Authority |
DF |
Day-ahead demand forecast |
4512 |
megawatthours |
2025-08-15 22:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
4499 |
megawatthours |
2025-08-15 22:00:00 |
PSEI |
Puget Sound Energy, Inc. |
TI |
Total interchange |
-2165 |
megawatthours |
2025-08-15 22:00:00 |
PSEI |
Puget Sound Energy, Inc. |
NG |
Net generation |
639 |
megawatthours |
2025-08-15 22:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2177 |
megawatthours |
2025-08-15 22:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2804 |
megawatthours |
2025-08-15 22:00:00 |
PSCO |
Public Service Company of Colorado |
TI |
Total interchange |
93 |
megawatthours |
2025-08-15 22:00:00 |
PSCO |
Public Service Company of Colorado |
NG |
Net generation |
8182 |
megawatthours |
2025-08-15 22:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
7341 |
megawatthours |
2025-08-15 22:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
8089 |
megawatthours |
2025-08-15 22:00:00 |
PNM |
Public Service Company of New Mexico |
TI |
Total interchange |
-255 |
megawatthours |
2025-08-15 22:00:00 |
PNM |
Public Service Company of New Mexico |
NG |
Net generation |
1813 |
megawatthours |
2025-08-15 22:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
2170 |
megawatthours |
2025-08-15 22:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
2119 |
megawatthours |
2025-08-15 22:00:00 |
PJM |
PJM Interconnection, LLC |
TI |
Total interchange |
-177 |
megawatthours |
2025-08-15 22:00:00 |
PJM |
PJM Interconnection, LLC |
NG |
Net generation |
150923 |
megawatthours |
2025-08-15 22:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
138667 |
megawatthours |
2025-08-15 22:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
145797 |
megawatthours |
2025-08-15 22:00:00 |
PGE |
Portland General Electric Company |
TI |
Total interchange |
-2111 |
megawatthours |
2025-08-15 22:00:00 |
PGE |
Portland General Electric Company |
NG |
Net generation |
842 |
megawatthours |
2025-08-15 22:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2948 |
megawatthours |
2025-08-15 22:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2953 |
megawatthours |
2025-08-15 22:00:00 |
PACW |
PacifiCorp West |
TI |
Total interchange |
-2180 |
megawatthours |
2025-08-15 22:00:00 |
PACW |
PacifiCorp West |
NG |
Net generation |
684 |
megawatthours |
2025-08-15 22:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2912 |
megawatthours |
2025-08-15 22:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2864 |
megawatthours |
2025-08-15 22:00:00 |
PACE |
PacifiCorp East |
TI |
Total interchange |
-265 |
megawatthours |
2025-08-15 22:00:00 |
PACE |
PacifiCorp East |
NG |
Net generation |
8458 |
megawatthours |
2025-08-15 22:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
9131 |
megawatthours |
2025-08-15 22:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
8723 |
megawatthours |
2025-08-15 22:00:00 |
NYIS |
New York Independent System Operator |
TI |
Total interchange |
-1031 |
megawatthours |
2025-08-15 22:00:00 |
NYIS |
New York Independent System Operator |
NG |
Net generation |
24849 |
megawatthours |
2025-08-15 22:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
25121 |
megawatthours |
2025-08-15 22:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
25880 |
megawatthours |
2025-08-15 22:00:00 |
NY |
New York |
TI |
Total interchange |
-1031 |
megawatthours |
2025-08-15 22:00:00 |
NY |
New York |
NG |
Net generation |
24849 |
megawatthours |
2025-08-15 22:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
25121 |
megawatthours |
2025-08-15 22:00:00 |
NY |
New York |
D |
Demand |
25880 |
megawatthours |
2025-08-15 22:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1636 |
megawatthours |
2025-08-15 22:00:00 |
NW |
Northwest |
TI |
Total interchange |
-3297 |
megawatthours |
2025-08-15 22:00:00 |
NW |
Northwest |
NG |
Net generation |
50040 |
megawatthours |
2025-08-15 22:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
51293 |
megawatthours |
2025-08-15 22:00:00 |
NW |
Northwest |
D |
Demand |
54981 |
megawatthours |
2025-08-15 22:00:00 |
NEVP |
Nevada Power Company |
TI |
Total interchange |
-1487 |
megawatthours |
2025-08-15 22:00:00 |
NEVP |
Nevada Power Company |
NG |
Net generation |
5950 |
megawatthours |
2025-08-15 22:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
7074 |
megawatthours |
2025-08-15 22:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
7437 |
megawatthours |
2025-08-15 22:00:00 |
NE |
New England |
TI |
Total interchange |
-1722 |
megawatthours |
2025-08-15 22:00:00 |
NE |
New England |
NG |
Net generation |
16647 |
megawatthours |
2025-08-15 22:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
18260 |
megawatthours |
2025-08-15 22:00:00 |
NE |
New England |
D |
Demand |
18369 |
megawatthours |
2025-08-15 22:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
TI |
Total interchange |
-4423 |
megawatthours |
2025-08-15 22:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
NG |
Net generation |
109547 |
megawatthours |
2025-08-15 22:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
113534 |
megawatthours |
2025-08-15 22:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
111954 |
megawatthours |
2025-08-15 22:00:00 |
MIDW |
Midwest |
TI |
Total interchange |
-4594 |
megawatthours |
2025-08-15 22:00:00 |
MIDW |
Midwest |
NG |
Net generation |
120185 |
megawatthours |
2025-08-15 22:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
124427 |
megawatthours |
2025-08-15 22:00:00 |
MIDW |
Midwest |
D |
Demand |
123297 |
megawatthours |
2025-08-15 22:00:00 |
MIDA |
Mid-Atlantic |
TI |
Total interchange |
-177 |
megawatthours |
2025-08-15 22:00:00 |
MIDA |
Mid-Atlantic |
NG |
Net generation |
150923 |
megawatthours |
2025-08-15 22:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
138667 |
megawatthours |
2025-08-15 22:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
145797 |
megawatthours |
2025-08-15 22:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
TI |
Total interchange |
-171 |
megawatthours |
2025-08-15 22:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
NG |
Net generation |
6611 |
megawatthours |
2025-08-15 22:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
6384 |
megawatthours |
2025-08-15 22:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
6782 |
megawatthours |
2025-08-15 22:00:00 |
LDWP |
Los Angeles Department of Water and Power |
TI |
Total interchange |
-366 |
megawatthours |
2025-08-15 22:00:00 |
LDWP |
Los Angeles Department of Water and Power |
NG |
Net generation |
3089 |
megawatthours |
2025-08-15 22:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3291 |
megawatthours |
2025-08-15 22:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
3455 |
megawatthours |
2025-08-15 22:00:00 |
JEA |
JEA |
TI |
Total interchange |
-327 |
megawatthours |
2025-08-15 22:00:00 |
JEA |
JEA |
NG |
Net generation |
2027 |
megawatthours |
2025-08-15 22:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2388 |
megawatthours |
2025-08-15 22:00:00 |
JEA |
JEA |
D |
Demand |
2356 |
megawatthours |
2025-08-15 22:00:00 |
ISNE |
ISO New England |
TI |
Total interchange |
-1722 |
megawatthours |
2025-08-15 22:00:00 |
ISNE |
ISO New England |
NG |
Net generation |
16647 |
megawatthours |
2025-08-15 22:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
18260 |
megawatthours |
2025-08-15 22:00:00 |
ISNE |
ISO New England |
D |
Demand |
18369 |
megawatthours |
2025-08-15 22:00:00 |
IPCO |
Idaho Power Company |
TI |
Total interchange |
-1229 |
megawatthours |
2025-08-15 22:00:00 |
IPCO |
Idaho Power Company |
NG |
Net generation |
2079 |
megawatthours |
2025-08-15 22:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3260 |
megawatthours |
2025-08-15 22:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
3310 |
megawatthours |
2025-08-15 22:00:00 |
IID |
Imperial Irrigation District |
NG |
Net generation |
1131 |
megawatthours |
2025-08-15 22:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
838 |
megawatthours |
2025-08-15 22:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
837 |
megawatthours |
2025-08-15 22:00:00 |
HST |
City of Homestead |
TI |
Total interchange |
-124 |
megawatthours |
2025-08-15 22:00:00 |
HST |
City of Homestead |
NG |
Net generation |
0 |
megawatthours |
2025-08-15 22:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
124 |
megawatthours |
2025-08-15 22:00:00 |
HST |
City of Homestead |
D |
Demand |
124 |
megawatthours |
2025-08-15 22:00:00 |
GWA |
NaturEner Power Watch, LLC |
TI |
Total interchange |
0 |
megawatthours |
2025-08-15 22:00:00 |
GWA |
NaturEner Power Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-15 22:00:00 |
GVL |
Gainesville Regional Utilities |
TI |
Total interchange |
-123 |
megawatthours |
2025-08-15 22:00:00 |
GVL |
Gainesville Regional Utilities |
NG |
Net generation |
334 |
megawatthours |
2025-08-15 22:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
241 |
megawatthours |
2025-08-15 22:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
464 |
megawatthours |
2025-08-15 22:00:00 |
GRID |
Gridforce Energy Management, LLC |
TI |
Total interchange |
2196 |
megawatthours |
2025-08-15 22:00:00 |
GRID |
Gridforce Energy Management, LLC |
NG |
Net generation |
2196 |
megawatthours |
2025-08-15 22:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
TI |
Total interchange |
12 |
megawatthours |
2025-08-15 22:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
NG |
Net generation |
911 |
megawatthours |
2025-08-15 22:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
865 |
megawatthours |
2025-08-15 22:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
905 |
megawatthours |
2025-08-15 22:00:00 |
FPL |
Florida Power & Light Co. |
TI |
Total interchange |
307 |
megawatthours |
2025-08-15 22:00:00 |
FPL |
Florida Power & Light Co. |
NG |
Net generation |
28568 |
megawatthours |
2025-08-15 22:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
27829 |
megawatthours |
2025-08-15 22:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
28261 |
megawatthours |
2025-08-15 22:00:00 |
FPC |
Duke Energy Florida, Inc. |
TI |
Total interchange |
-2588 |
megawatthours |
2025-08-15 22:00:00 |
FPC |
Duke Energy Florida, Inc. |
NG |
Net generation |
9056 |
megawatthours |
2025-08-15 22:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
9105 |
megawatthours |
2025-08-15 22:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
11644 |
megawatthours |
2025-08-15 22:00:00 |
FMPP |
Florida Municipal Power Pool |
TI |
Total interchange |
106 |
megawatthours |
2025-08-15 22:00:00 |
FMPP |
Florida Municipal Power Pool |
NG |
Net generation |
3730 |
megawatthours |
2025-08-15 22:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
3624 |
megawatthours |
2025-08-15 22:00:00 |
FLA |
Florida |
TI |
Total interchange |
-1934 |
megawatthours |
2025-08-15 22:00:00 |
FLA |
Florida |
NG |
Net generation |
49728 |
megawatthours |
2025-08-15 22:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
40585 |
megawatthours |
2025-08-15 22:00:00 |
FLA |
Florida |
D |
Demand |
51670 |
megawatthours |
2025-08-15 22:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
TI |
Total interchange |
16 |
megawatthours |
2025-08-15 22:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
NG |
Net generation |
81102 |
megawatthours |
2025-08-15 22:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
82356 |
megawatthours |
2025-08-15 22:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
81087 |
megawatthours |
2025-08-15 22:00:00 |
EPE |
El Paso Electric Company |
TI |
Total interchange |
-512 |
megawatthours |
2025-08-15 22:00:00 |
EPE |
El Paso Electric Company |
NG |
Net generation |
1218 |
megawatthours |
2025-08-15 22:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1840 |
megawatthours |
2025-08-15 22:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1729 |
megawatthours |
2025-08-15 22:00:00 |
DUK |
Duke Energy Carolinas |
TI |
Total interchange |
1004 |
megawatthours |
2025-08-15 22:00:00 |
DUK |
Duke Energy Carolinas |
NG |
Net generation |
20183 |
megawatthours |
2025-08-15 22:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
19075 |
megawatthours |
2025-08-15 22:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
19179 |
megawatthours |
2025-08-15 22:00:00 |
DOPD |
PUD No. 1 of Douglas County |
TI |
Total interchange |
272 |
megawatthours |
2025-08-15 22:00:00 |
DOPD |
PUD No. 1 of Douglas County |
NG |
Net generation |
559 |
megawatthours |
2025-08-15 22:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
313 |
megawatthours |
2025-08-15 22:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
287 |
megawatthours |
2025-08-15 22:00:00 |
DEAA |
Arlington Valley, LLC |
TI |
Total interchange |
473 |
megawatthours |
2025-08-15 22:00:00 |
DEAA |
Arlington Valley, LLC |
NG |
Net generation |
473 |
megawatthours |
2025-08-15 22:00:00 |
CPLW |
Duke Energy Progress West |
TI |
Total interchange |
-53 |
megawatthours |
2025-08-15 22:00:00 |
CPLW |
Duke Energy Progress West |
NG |
Net generation |
683 |
megawatthours |
2025-08-15 22:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
741 |
megawatthours |
2025-08-15 22:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
736 |
megawatthours |
2025-08-15 22:00:00 |
CPLE |
Duke Energy Progress East |
TI |
Total interchange |
-850 |
megawatthours |
2025-08-15 22:00:00 |
CPLE |
Duke Energy Progress East |
NG |
Net generation |
10124 |
megawatthours |
2025-08-15 22:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
10831 |
megawatthours |
2025-08-15 22:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
10974 |
megawatthours |
2025-08-15 22:00:00 |
CISO |
California Independent System Operator |
TI |
Total interchange |
-685 |
megawatthours |
2025-08-15 22:00:00 |
CISO |
California Independent System Operator |
NG |
Net generation |
30924 |
megawatthours |
2025-08-15 22:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
28193 |
megawatthours |
2025-08-15 22:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
30993 |
megawatthours |
2025-08-15 22:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
TI |
Total interchange |
704 |
megawatthours |
2025-08-15 22:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
NG |
Net generation |
914 |
megawatthours |
2025-08-15 22:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
202 |
megawatthours |
2025-08-15 22:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
210 |
megawatthours |
2025-08-15 22:00:00 |
CENT |
Central |
TI |
Total interchange |
422 |
megawatthours |
2025-08-15 22:00:00 |
CENT |
Central |
NG |
Net generation |
54109 |
megawatthours |
2025-08-15 22:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
56729 |
megawatthours |
2025-08-15 22:00:00 |
CENT |
Central |
D |
Demand |
53711 |
megawatthours |
2025-08-15 22:00:00 |
CAR |
Carolinas |
TI |
Total interchange |
541 |
megawatthours |
2025-08-15 22:00:00 |
CAR |
Carolinas |
NG |
Net generation |
38912 |
megawatthours |
2025-08-15 22:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
39584 |
megawatthours |
2025-08-15 22:00:00 |
CAR |
Carolinas |
D |
Demand |
39653 |
megawatthours |
2025-08-15 22:00:00 |
CAL |
California |
TI |
Total interchange |
-2805 |
megawatthours |
2025-08-15 22:00:00 |
CAL |
California |
NG |
Net generation |
37189 |
megawatthours |
2025-08-15 22:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
35998 |
megawatthours |
2025-08-15 22:00:00 |
CAL |
California |
D |
Demand |
39085 |
megawatthours |
2025-08-15 22:00:00 |
BPAT |
Bonneville Power Administration |
TI |
Total interchange |
3337 |
megawatthours |
2025-08-15 22:00:00 |
BPAT |
Bonneville Power Administration |
NG |
Net generation |
10624 |
megawatthours |
2025-08-15 22:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
7243 |
megawatthours |
2025-08-15 22:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
7287 |
megawatthours |
2025-08-15 22:00:00 |
BANC |
Balancing Authority of Northern California |
TI |
Total interchange |
-1509 |
megawatthours |
2025-08-15 22:00:00 |
BANC |
Balancing Authority of Northern California |
NG |
Net generation |
1768 |
megawatthours |
2025-08-15 22:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
3147 |
megawatthours |
2025-08-15 22:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
3277 |
megawatthours |
2025-08-15 22:00:00 |
AZPS |
Arizona Public Service Company |
TI |
Total interchange |
-2209 |
megawatthours |
2025-08-15 22:00:00 |
AZPS |
Arizona Public Service Company |
NG |
Net generation |
3772 |
megawatthours |
2025-08-15 22:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6831 |
megawatthours |
2025-08-15 22:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
5981 |
megawatthours |
2025-08-15 22:00:00 |
AVRN |
Avangrid Renewables, LLC |
TI |
Total interchange |
1597 |
megawatthours |
2025-08-15 22:00:00 |
AVRN |
Avangrid Renewables, LLC |
NG |
Net generation |
1597 |
megawatthours |
2025-08-15 22:00:00 |
AVA |
Avista Corporation |
TI |
Total interchange |
-688 |
megawatthours |
2025-08-15 22:00:00 |
AVA |
Avista Corporation |
NG |
Net generation |
879 |
megawatthours |
2025-08-15 22:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1636 |
megawatthours |
2025-08-15 22:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1567 |
megawatthours |
2025-08-15 22:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
NG |
Net generation |
4027 |
megawatthours |
2025-08-15 22:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
DF |
Day-ahead demand forecast |
4509 |
megawatthours |
2025-08-15 22:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
4561 |
megawatthours |
2025-08-15 21:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
TI |
Total interchange |
186 |
megawatthours |
2025-08-15 21:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
NG |
Net generation |
188 |
megawatthours |
2025-08-15 21:00:00 |
WWA |
NaturEner Wind Watch, LLC |
NG |
Net generation |
1 |
megawatthours |
2025-08-15 21:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
TI |
Total interchange |
-36 |
megawatthours |
2025-08-15 21:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
NG |
Net generation |
81 |
megawatthours |
2025-08-15 21:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
114 |
megawatthours |
2025-08-15 21:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
117 |
megawatthours |
2025-08-15 21:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
TI |
Total interchange |
316 |
megawatthours |
2025-08-15 21:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
NG |
Net generation |
1545 |
megawatthours |
2025-08-15 21:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1529 |
megawatthours |
2025-08-15 21:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
1229 |
megawatthours |
2025-08-15 21:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
TI |
Total interchange |
-110 |
megawatthours |
2025-08-15 21:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
NG |
Net generation |
4703 |
megawatthours |
2025-08-15 21:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4460 |
megawatthours |
2025-08-15 21:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
4813 |
megawatthours |
2025-08-15 21:00:00 |
US48 |
United States Lower 48 |
TI |
Total interchange |
-11631 |
megawatthours |
2025-08-15 21:00:00 |
US48 |
United States Lower 48 |
NG |
Net generation |
714151 |
megawatthours |
2025-08-15 21:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
662466 |
megawatthours |
2025-08-15 21:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
721053 |
megawatthours |
2025-08-15 21:00:00 |
TVA |
Tennessee Valley Authority |
TI |
Total interchange |
-3361 |
megawatthours |
2025-08-15 21:00:00 |
TVA |
Tennessee Valley Authority |
NG |
Net generation |
26273 |
megawatthours |
2025-08-15 21:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
29820 |
megawatthours |
2025-08-15 21:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
29789 |
megawatthours |
2025-08-15 21:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
TI |
Total interchange |
-375 |
megawatthours |
2025-08-15 21:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
NG |
Net generation |
123 |
megawatthours |
2025-08-15 21:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
496 |
megawatthours |
2025-08-15 21:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
498 |
megawatthours |
2025-08-15 21:00:00 |
TIDC |
Turlock Irrigation District |
TI |
Total interchange |
-227 |
megawatthours |
2025-08-15 21:00:00 |
TIDC |
Turlock Irrigation District |
NG |
Net generation |
258 |
megawatthours |
2025-08-15 21:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
494 |
megawatthours |
2025-08-15 21:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
485 |
megawatthours |
2025-08-15 21:00:00 |
TEX |
Texas |
TI |
Total interchange |
29 |
megawatthours |
2025-08-15 21:00:00 |
TEX |
Texas |
NG |
Net generation |
80518 |
megawatthours |
2025-08-15 21:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
82426 |
megawatthours |
2025-08-15 21:00:00 |
TEX |
Texas |
D |
Demand |
80489 |
megawatthours |
2025-08-15 21:00:00 |
TEPC |
Tucson Electric Power |
TI |
Total interchange |
-172 |
megawatthours |
2025-08-15 21:00:00 |
TEPC |
Tucson Electric Power |
NG |
Net generation |
2116 |
megawatthours |
2025-08-15 21:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2365 |
megawatthours |
2025-08-15 21:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
2288 |
megawatthours |
2025-08-15 21:00:00 |
TEN |
Tennessee |
TI |
Total interchange |
-3361 |
megawatthours |
2025-08-15 21:00:00 |
TEN |
Tennessee |
NG |
Net generation |
26273 |
megawatthours |
2025-08-15 21:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
29820 |
megawatthours |
2025-08-15 21:00:00 |
TEN |
Tennessee |
D |
Demand |
29789 |
megawatthours |
2025-08-15 21:00:00 |
TEC |
Tampa Electric Company |
TI |
Total interchange |
-1164 |
megawatthours |
2025-08-15 21:00:00 |
TEC |
Tampa Electric Company |
NG |
Net generation |
3259 |
megawatthours |
2025-08-15 21:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
4507 |
megawatthours |
2025-08-15 21:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
4424 |
megawatthours |
2025-08-15 21:00:00 |
TAL |
City of Tallahassee |
TI |
Total interchange |
-40 |
megawatthours |
2025-08-15 21:00:00 |
TAL |
City of Tallahassee |
NG |
Net generation |
415 |
megawatthours |
2025-08-15 21:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
485 |
megawatthours |
2025-08-15 21:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
454 |
megawatthours |
2025-08-15 21:00:00 |
SWPP |
Southwest Power Pool |
TI |
Total interchange |
447 |
megawatthours |
2025-08-15 21:00:00 |
SWPP |
Southwest Power Pool |
NG |
Net generation |
54317 |
megawatthours |
2025-08-15 21:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
56555 |
megawatthours |
2025-08-15 21:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
53870 |
megawatthours |
2025-08-15 21:00:00 |
SW |
Southwest |
TI |
Total interchange |
1252 |
megawatthours |
2025-08-15 21:00:00 |
SW |
Southwest |
NG |
Net generation |
20266 |
megawatthours |
2025-08-15 21:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
21101 |
megawatthours |
2025-08-15 21:00:00 |
SW |
Southwest |
D |
Demand |
19378 |
megawatthours |
2025-08-15 21:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
TI |
Total interchange |
3675 |
megawatthours |
2025-08-15 21:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
NG |
Net generation |
9479 |
megawatthours |
2025-08-15 21:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6819 |
megawatthours |
2025-08-15 21:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
6097 |
megawatthours |
2025-08-15 21:00:00 |
SPA |
Southwestern Power Administration |
D |
Demand |
36 |
megawatthours |
2025-08-15 21:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
TI |
Total interchange |
4194 |
megawatthours |
2025-08-15 21:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
NG |
Net generation |
44535 |
megawatthours |
2025-08-15 21:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
41844 |
megawatthours |
2025-08-15 21:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
40341 |
megawatthours |
2025-08-15 21:00:00 |
SEPA |
Southeastern Power Administration |
TI |
Total interchange |
925 |
megawatthours |
2025-08-15 21:00:00 |
SEPA |
Southeastern Power Administration |
NG |
Net generation |
919 |
megawatthours |
2025-08-15 21:00:00 |
SEC |
Seminole Electric Cooperative |
TI |
Total interchange |
1894 |
megawatthours |
2025-08-15 21:00:00 |
SEC |
Seminole Electric Cooperative |
NG |
Net generation |
2288 |
megawatthours |
2025-08-15 21:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
428 |
megawatthours |
2025-08-15 21:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
394 |
megawatthours |
2025-08-15 21:00:00 |
SE |
Southeast |
TI |
Total interchange |
5119 |
megawatthours |
2025-08-15 21:00:00 |
SE |
Southeast |
NG |
Net generation |
45454 |
megawatthours |
2025-08-15 21:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
41844 |
megawatthours |
2025-08-15 21:00:00 |
SE |
Southeast |
D |
Demand |
40341 |
megawatthours |
2025-08-15 21:00:00 |
SCL |
Seattle City Light |
TI |
Total interchange |
-792 |
megawatthours |
2025-08-15 21:00:00 |
SCL |
Seattle City Light |
NG |
Net generation |
351 |
megawatthours |
2025-08-15 21:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
1027 |
megawatthours |
2025-08-15 21:00:00 |
SCL |
Seattle City Light |
D |
Demand |
1143 |
megawatthours |
2025-08-15 21:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
TI |
Total interchange |
193 |
megawatthours |
2025-08-15 21:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
NG |
Net generation |
4526 |
megawatthours |
2025-08-15 21:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
4485 |
megawatthours |
2025-08-15 21:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
4333 |
megawatthours |
2025-08-15 21:00:00 |
SC |
South Carolina Public Service Authority |
NG |
Net generation |
3130 |
megawatthours |
2025-08-15 21:00:00 |
SC |
South Carolina Public Service Authority |
DF |
Day-ahead demand forecast |
4507 |
megawatthours |
2025-08-15 21:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
4537 |
megawatthours |
2025-08-15 21:00:00 |
PSEI |
Puget Sound Energy, Inc. |
TI |
Total interchange |
-2180 |
megawatthours |
2025-08-15 21:00:00 |
PSEI |
Puget Sound Energy, Inc. |
NG |
Net generation |
640 |
megawatthours |
2025-08-15 21:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2094 |
megawatthours |
2025-08-15 21:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2820 |
megawatthours |
2025-08-15 21:00:00 |
PSCO |
Public Service Company of Colorado |
TI |
Total interchange |
-88 |
megawatthours |
2025-08-15 21:00:00 |
PSCO |
Public Service Company of Colorado |
NG |
Net generation |
7938 |
megawatthours |
2025-08-15 21:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
7138 |
megawatthours |
2025-08-15 21:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
8026 |
megawatthours |
2025-08-15 21:00:00 |
PNM |
Public Service Company of New Mexico |
TI |
Total interchange |
-275 |
megawatthours |
2025-08-15 21:00:00 |
PNM |
Public Service Company of New Mexico |
NG |
Net generation |
1766 |
megawatthours |
2025-08-15 21:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
2083 |
megawatthours |
2025-08-15 21:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
2113 |
megawatthours |
2025-08-15 21:00:00 |
PJM |
PJM Interconnection, LLC |
TI |
Total interchange |
-428 |
megawatthours |
2025-08-15 21:00:00 |
PJM |
PJM Interconnection, LLC |
NG |
Net generation |
150768 |
megawatthours |
2025-08-15 21:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
141433 |
megawatthours |
2025-08-15 21:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
145391 |
megawatthours |
2025-08-15 21:00:00 |
PGE |
Portland General Electric Company |
TI |
Total interchange |
-2200 |
megawatthours |
2025-08-15 21:00:00 |
PGE |
Portland General Electric Company |
NG |
Net generation |
714 |
megawatthours |
2025-08-15 21:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2894 |
megawatthours |
2025-08-15 21:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2914 |
megawatthours |
2025-08-15 21:00:00 |
PACW |
PacifiCorp West |
TI |
Total interchange |
-2110 |
megawatthours |
2025-08-15 21:00:00 |
PACW |
PacifiCorp West |
NG |
Net generation |
700 |
megawatthours |
2025-08-15 21:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2823 |
megawatthours |
2025-08-15 21:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2810 |
megawatthours |
2025-08-15 21:00:00 |
PACE |
PacifiCorp East |
TI |
Total interchange |
-267 |
megawatthours |
2025-08-15 21:00:00 |
PACE |
PacifiCorp East |
NG |
Net generation |
8358 |
megawatthours |
2025-08-15 21:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
8900 |
megawatthours |
2025-08-15 21:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
8625 |
megawatthours |
2025-08-15 21:00:00 |
NYIS |
New York Independent System Operator |
TI |
Total interchange |
-591 |
megawatthours |
2025-08-15 21:00:00 |
NYIS |
New York Independent System Operator |
NG |
Net generation |
24780 |
megawatthours |
2025-08-15 21:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
24669 |
megawatthours |
2025-08-15 21:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
25371 |
megawatthours |
2025-08-15 21:00:00 |
NY |
New York |
TI |
Total interchange |
-591 |
megawatthours |
2025-08-15 21:00:00 |
NY |
New York |
NG |
Net generation |
24780 |
megawatthours |
2025-08-15 21:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
24669 |
megawatthours |
2025-08-15 21:00:00 |
NY |
New York |
D |
Demand |
25371 |
megawatthours |
2025-08-15 21:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1593 |
megawatthours |
2025-08-15 21:00:00 |
NW |
Northwest |
TI |
Total interchange |
-3059 |
megawatthours |
2025-08-15 21:00:00 |
NW |
Northwest |
NG |
Net generation |
48959 |
megawatthours |
2025-08-15 21:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
49928 |
megawatthours |
2025-08-15 21:00:00 |
NW |
Northwest |
D |
Demand |
53614 |
megawatthours |
2025-08-15 21:00:00 |
NEVP |
Nevada Power Company |
TI |
Total interchange |
-985 |
megawatthours |
2025-08-15 21:00:00 |
NEVP |
Nevada Power Company |
NG |
Net generation |
5917 |
megawatthours |
2025-08-15 21:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
6716 |
megawatthours |
2025-08-15 21:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
6902 |
megawatthours |
2025-08-15 21:00:00 |
NE |
New England |
TI |
Total interchange |
-1153 |
megawatthours |
2025-08-15 21:00:00 |
NE |
New England |
NG |
Net generation |
16175 |
megawatthours |
2025-08-15 21:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
17730 |
megawatthours |
2025-08-15 21:00:00 |
NE |
New England |
D |
Demand |
17328 |
megawatthours |
2025-08-15 21:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
TI |
Total interchange |
-4779 |
megawatthours |
2025-08-15 21:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
NG |
Net generation |
109613 |
megawatthours |
2025-08-15 21:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
112866 |
megawatthours |
2025-08-15 21:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
112228 |
megawatthours |
2025-08-15 21:00:00 |
MIDW |
Midwest |
TI |
Total interchange |
-5001 |
megawatthours |
2025-08-15 21:00:00 |
MIDW |
Midwest |
NG |
Net generation |
120323 |
megawatthours |
2025-08-15 21:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
123718 |
megawatthours |
2025-08-15 21:00:00 |
MIDW |
Midwest |
D |
Demand |
123602 |
megawatthours |
2025-08-15 21:00:00 |
MIDA |
Mid-Atlantic |
TI |
Total interchange |
-428 |
megawatthours |
2025-08-15 21:00:00 |
MIDA |
Mid-Atlantic |
NG |
Net generation |
150768 |
megawatthours |
2025-08-15 21:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
141433 |
megawatthours |
2025-08-15 21:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
145391 |
megawatthours |
2025-08-15 21:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
TI |
Total interchange |
-222 |
megawatthours |
2025-08-15 21:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
NG |
Net generation |
6661 |
megawatthours |
2025-08-15 21:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
6391 |
megawatthours |
2025-08-15 21:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
6883 |
megawatthours |
2025-08-15 21:00:00 |
LDWP |
Los Angeles Department of Water and Power |
TI |
Total interchange |
-619 |
megawatthours |
2025-08-15 21:00:00 |
LDWP |
Los Angeles Department of Water and Power |
NG |
Net generation |
2973 |
megawatthours |
2025-08-15 21:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3146 |
megawatthours |
2025-08-15 21:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
3592 |
megawatthours |
2025-08-15 21:00:00 |
JEA |
JEA |
TI |
Total interchange |
-413 |
megawatthours |
2025-08-15 21:00:00 |
JEA |
JEA |
NG |
Net generation |
2070 |
megawatthours |
2025-08-15 21:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2428 |
megawatthours |
2025-08-15 21:00:00 |
JEA |
JEA |
D |
Demand |
2482 |
megawatthours |
2025-08-15 21:00:00 |
ISNE |
ISO New England |
TI |
Total interchange |
-1153 |
megawatthours |
2025-08-15 21:00:00 |
ISNE |
ISO New England |
NG |
Net generation |
16175 |
megawatthours |
2025-08-15 21:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
17730 |
megawatthours |
2025-08-15 21:00:00 |
ISNE |
ISO New England |
D |
Demand |
17328 |
megawatthours |
2025-08-15 21:00:00 |
IPCO |
Idaho Power Company |
TI |
Total interchange |
-1152 |
megawatthours |
2025-08-15 21:00:00 |
IPCO |
Idaho Power Company |
NG |
Net generation |
2040 |
megawatthours |
2025-08-15 21:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
3147 |
megawatthours |
2025-08-15 21:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
3194 |
megawatthours |
2025-08-15 21:00:00 |
IID |
Imperial Irrigation District |
NG |
Net generation |
1101 |
megawatthours |
2025-08-15 21:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
795 |
megawatthours |
2025-08-15 21:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
797 |
megawatthours |
2025-08-15 21:00:00 |
HST |
City of Homestead |
TI |
Total interchange |
-122 |
megawatthours |
2025-08-15 21:00:00 |
HST |
City of Homestead |
NG |
Net generation |
0 |
megawatthours |
2025-08-15 21:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
121 |
megawatthours |
2025-08-15 21:00:00 |
HST |
City of Homestead |
D |
Demand |
122 |
megawatthours |
2025-08-15 21:00:00 |
GWA |
NaturEner Power Watch, LLC |
TI |
Total interchange |
0 |
megawatthours |
2025-08-15 21:00:00 |
GWA |
NaturEner Power Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-15 21:00:00 |
GVL |
Gainesville Regional Utilities |
TI |
Total interchange |
-123 |
megawatthours |
2025-08-15 21:00:00 |
GVL |
Gainesville Regional Utilities |
NG |
Net generation |
332 |
megawatthours |
2025-08-15 21:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
239 |
megawatthours |
2025-08-15 21:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
463 |
megawatthours |
2025-08-15 21:00:00 |
GRID |
Gridforce Energy Management, LLC |
TI |
Total interchange |
2245 |
megawatthours |
2025-08-15 21:00:00 |
GRID |
Gridforce Energy Management, LLC |
NG |
Net generation |
2245 |
megawatthours |
2025-08-15 21:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
TI |
Total interchange |
-86 |
megawatthours |
2025-08-15 21:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
NG |
Net generation |
810 |
megawatthours |
2025-08-15 21:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
862 |
megawatthours |
2025-08-15 21:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
898 |
megawatthours |
2025-08-15 21:00:00 |
FPL |
Florida Power & Light Co. |
TI |
Total interchange |
305 |
megawatthours |
2025-08-15 21:00:00 |
FPL |
Florida Power & Light Co. |
NG |
Net generation |
28931 |
megawatthours |
2025-08-15 21:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
28414 |
megawatthours |
2025-08-15 21:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
28626 |
megawatthours |
2025-08-15 21:00:00 |
FPC |
Duke Energy Florida, Inc. |
TI |
Total interchange |
-2356 |
megawatthours |
2025-08-15 21:00:00 |
FPC |
Duke Energy Florida, Inc. |
NG |
Net generation |
9566 |
megawatthours |
2025-08-15 21:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
9219 |
megawatthours |
2025-08-15 21:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
11922 |
megawatthours |
2025-08-15 21:00:00 |
FMPP |
Florida Municipal Power Pool |
TI |
Total interchange |
50 |
megawatthours |
2025-08-15 21:00:00 |
FMPP |
Florida Municipal Power Pool |
NG |
Net generation |
3842 |
megawatthours |
2025-08-15 21:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
3792 |
megawatthours |
2025-08-15 21:00:00 |
FLA |
Florida |
TI |
Total interchange |
-1969 |
megawatthours |
2025-08-15 21:00:00 |
FLA |
Florida |
NG |
Net generation |
50703 |
megawatthours |
2025-08-15 21:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
41334 |
megawatthours |
2025-08-15 21:00:00 |
FLA |
Florida |
D |
Demand |
52679 |
megawatthours |
2025-08-15 21:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
TI |
Total interchange |
29 |
megawatthours |
2025-08-15 21:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
NG |
Net generation |
80518 |
megawatthours |
2025-08-15 21:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
82426 |
megawatthours |
2025-08-15 21:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
80489 |
megawatthours |
2025-08-15 21:00:00 |
EPE |
El Paso Electric Company |
TI |
Total interchange |
-482 |
megawatthours |
2025-08-15 21:00:00 |
EPE |
El Paso Electric Company |
NG |
Net generation |
1178 |
megawatthours |
2025-08-15 21:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1779 |
megawatthours |
2025-08-15 21:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1659 |
megawatthours |
2025-08-15 21:00:00 |
DUK |
Duke Energy Carolinas |
TI |
Total interchange |
500 |
megawatthours |
2025-08-15 21:00:00 |
DUK |
Duke Energy Carolinas |
NG |
Net generation |
19976 |
megawatthours |
2025-08-15 21:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
19358 |
megawatthours |
2025-08-15 21:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
19476 |
megawatthours |
2025-08-15 21:00:00 |
DOPD |
PUD No. 1 of Douglas County |
TI |
Total interchange |
115 |
megawatthours |
2025-08-15 21:00:00 |
DOPD |
PUD No. 1 of Douglas County |
NG |
Net generation |
394 |
megawatthours |
2025-08-15 21:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
310 |
megawatthours |
2025-08-15 21:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
279 |
megawatthours |
2025-08-15 21:00:00 |
DEAA |
Arlington Valley, LLC |
TI |
Total interchange |
364 |
megawatthours |
2025-08-15 21:00:00 |
DEAA |
Arlington Valley, LLC |
NG |
Net generation |
364 |
megawatthours |
2025-08-15 21:00:00 |
CPLW |
Duke Energy Progress West |
TI |
Total interchange |
-72 |
megawatthours |
2025-08-15 21:00:00 |
CPLW |
Duke Energy Progress West |
NG |
Net generation |
687 |
megawatthours |
2025-08-15 21:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
745 |
megawatthours |
2025-08-15 21:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
759 |
megawatthours |
2025-08-15 21:00:00 |
CPLE |
Duke Energy Progress East |
TI |
Total interchange |
-403 |
megawatthours |
2025-08-15 21:00:00 |
CPLE |
Duke Energy Progress East |
NG |
Net generation |
10556 |
megawatthours |
2025-08-15 21:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
10955 |
megawatthours |
2025-08-15 21:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
10959 |
megawatthours |
2025-08-15 21:00:00 |
CISO |
California Independent System Operator |
TI |
Total interchange |
-1214 |
megawatthours |
2025-08-15 21:00:00 |
CISO |
California Independent System Operator |
NG |
Net generation |
30483 |
megawatthours |
2025-08-15 21:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
26406 |
megawatthours |
2025-08-15 21:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
31230 |
megawatthours |
2025-08-15 21:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
TI |
Total interchange |
704 |
megawatthours |
2025-08-15 21:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
NG |
Net generation |
912 |
megawatthours |
2025-08-15 21:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
199 |
megawatthours |
2025-08-15 21:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
208 |
megawatthours |
2025-08-15 21:00:00 |
CENT |
Central |
TI |
Total interchange |
447 |
megawatthours |
2025-08-15 21:00:00 |
CENT |
Central |
NG |
Net generation |
54317 |
megawatthours |
2025-08-15 21:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
56555 |
megawatthours |
2025-08-15 21:00:00 |
CENT |
Central |
D |
Demand |
53906 |
megawatthours |
2025-08-15 21:00:00 |
CAR |
Carolinas |
TI |
Total interchange |
404 |
megawatthours |
2025-08-15 21:00:00 |
CAR |
Carolinas |
NG |
Net generation |
39063 |
megawatthours |
2025-08-15 21:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
40050 |
megawatthours |
2025-08-15 21:00:00 |
CAR |
Carolinas |
D |
Demand |
40064 |
megawatthours |
2025-08-15 21:00:00 |
CAL |
California |
TI |
Total interchange |
-3320 |
megawatthours |
2025-08-15 21:00:00 |
CAL |
California |
NG |
Net generation |
36552 |
megawatthours |
2025-08-15 21:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
33702 |
megawatthours |
2025-08-15 21:00:00 |
CAL |
California |
D |
Demand |
39101 |
megawatthours |
2025-08-15 21:00:00 |
BPAT |
Bonneville Power Administration |
TI |
Total interchange |
3442 |
megawatthours |
2025-08-15 21:00:00 |
BPAT |
Bonneville Power Administration |
NG |
Net generation |
10656 |
megawatthours |
2025-08-15 21:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
7140 |
megawatthours |
2025-08-15 21:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
7214 |
megawatthours |
2025-08-15 21:00:00 |
BANC |
Balancing Authority of Northern California |
TI |
Total interchange |
-1260 |
megawatthours |
2025-08-15 21:00:00 |
BANC |
Balancing Authority of Northern California |
NG |
Net generation |
1737 |
megawatthours |
2025-08-15 21:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2861 |
megawatthours |
2025-08-15 21:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
2997 |
megawatthours |
2025-08-15 21:00:00 |
AZPS |
Arizona Public Service Company |
TI |
Total interchange |
-2174 |
megawatthours |
2025-08-15 21:00:00 |
AZPS |
Arizona Public Service Company |
NG |
Net generation |
3818 |
megawatthours |
2025-08-15 21:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6526 |
megawatthours |
2025-08-15 21:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
5992 |
megawatthours |
2025-08-15 21:00:00 |
AVRN |
Avangrid Renewables, LLC |
TI |
Total interchange |
1480 |
megawatthours |
2025-08-15 21:00:00 |
AVRN |
Avangrid Renewables, LLC |
NG |
Net generation |
1480 |
megawatthours |
2025-08-15 21:00:00 |
AVA |
Avista Corporation |
TI |
Total interchange |
-664 |
megawatthours |
2025-08-15 21:00:00 |
AVA |
Avista Corporation |
NG |
Net generation |
896 |
megawatthours |
2025-08-15 21:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1608 |
megawatthours |
2025-08-15 21:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1560 |
megawatthours |
2025-08-15 21:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
NG |
Net generation |
4049 |
megawatthours |
2025-08-15 21:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
DF |
Day-ahead demand forecast |
4461 |
megawatthours |
2025-08-15 21:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
4491 |
megawatthours |
2025-08-15 20:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
TI |
Total interchange |
184 |
megawatthours |
2025-08-15 20:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
NG |
Net generation |
187 |
megawatthours |
2025-08-15 20:00:00 |
WWA |
NaturEner Wind Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-15 20:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
TI |
Total interchange |
-30 |
megawatthours |
2025-08-15 20:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
NG |
Net generation |
86 |
megawatthours |
2025-08-15 20:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
107 |
megawatthours |
2025-08-15 20:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
116 |
megawatthours |
2025-08-15 20:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
TI |
Total interchange |
306 |
megawatthours |
2025-08-15 20:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
NG |
Net generation |
1519 |
megawatthours |
2025-08-15 20:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1470 |
megawatthours |
2025-08-15 20:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
1213 |
megawatthours |
2025-08-15 20:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
TI |
Total interchange |
-183 |
megawatthours |
2025-08-15 20:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
NG |
Net generation |
4709 |
megawatthours |
2025-08-15 20:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4359 |
megawatthours |
2025-08-15 20:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
4892 |
megawatthours |
2025-08-15 20:00:00 |
US48 |
United States Lower 48 |
TI |
Total interchange |
-10134 |
megawatthours |
2025-08-15 20:00:00 |
US48 |
United States Lower 48 |
NG |
Net generation |
707726 |
megawatthours |
2025-08-15 20:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
653194 |
megawatthours |
2025-08-15 20:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
712181 |
megawatthours |
2025-08-15 20:00:00 |
TVA |
Tennessee Valley Authority |
TI |
Total interchange |
-3473 |
megawatthours |
2025-08-15 20:00:00 |
TVA |
Tennessee Valley Authority |
NG |
Net generation |
26320 |
megawatthours |
2025-08-15 20:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
29530 |
megawatthours |
2025-08-15 20:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
29917 |
megawatthours |
2025-08-15 20:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
TI |
Total interchange |
-375 |
megawatthours |
2025-08-15 20:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
NG |
Net generation |
124 |
megawatthours |
2025-08-15 20:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
496 |
megawatthours |
2025-08-15 20:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
499 |
megawatthours |
2025-08-15 20:00:00 |
TIDC |
Turlock Irrigation District |
TI |
Total interchange |
-175 |
megawatthours |
2025-08-15 20:00:00 |
TIDC |
Turlock Irrigation District |
NG |
Net generation |
267 |
megawatthours |
2025-08-15 20:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
456 |
megawatthours |
2025-08-15 20:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
443 |
megawatthours |
2025-08-15 20:00:00 |
TEX |
Texas |
TI |
Total interchange |
0 |
megawatthours |
2025-08-15 20:00:00 |
TEX |
Texas |
NG |
Net generation |
79887 |
megawatthours |
2025-08-15 20:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
82007 |
megawatthours |
2025-08-15 20:00:00 |
TEX |
Texas |
D |
Demand |
79887 |
megawatthours |
2025-08-15 20:00:00 |
TEPC |
Tucson Electric Power |
TI |
Total interchange |
-244 |
megawatthours |
2025-08-15 20:00:00 |
TEPC |
Tucson Electric Power |
NG |
Net generation |
1936 |
megawatthours |
2025-08-15 20:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2276 |
megawatthours |
2025-08-15 20:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
2180 |
megawatthours |
2025-08-15 20:00:00 |
TEN |
Tennessee |
TI |
Total interchange |
-3473 |
megawatthours |
2025-08-15 20:00:00 |
TEN |
Tennessee |
NG |
Net generation |
26320 |
megawatthours |
2025-08-15 20:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
29530 |
megawatthours |
2025-08-15 20:00:00 |
TEN |
Tennessee |
D |
Demand |
29917 |
megawatthours |
2025-08-15 20:00:00 |
TEC |
Tampa Electric Company |
TI |
Total interchange |
-1148 |
megawatthours |
2025-08-15 20:00:00 |
TEC |
Tampa Electric Company |
NG |
Net generation |
3242 |
megawatthours |
2025-08-15 20:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
4457 |
megawatthours |
2025-08-15 20:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
4390 |
megawatthours |
2025-08-15 20:00:00 |
TAL |
City of Tallahassee |
TI |
Total interchange |
-39 |
megawatthours |
2025-08-15 20:00:00 |
TAL |
City of Tallahassee |
NG |
Net generation |
479 |
megawatthours |
2025-08-15 20:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
492 |
megawatthours |
2025-08-15 20:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
517 |
megawatthours |
2025-08-15 20:00:00 |
SWPP |
Southwest Power Pool |
TI |
Total interchange |
-64 |
megawatthours |
2025-08-15 20:00:00 |
SWPP |
Southwest Power Pool |
NG |
Net generation |
53092 |
megawatthours |
2025-08-15 20:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
55642 |
megawatthours |
2025-08-15 20:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
53156 |
megawatthours |
2025-08-15 20:00:00 |
SW |
Southwest |
TI |
Total interchange |
1492 |
megawatthours |
2025-08-15 20:00:00 |
SW |
Southwest |
NG |
Net generation |
19667 |
megawatthours |
2025-08-15 20:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
20117 |
megawatthours |
2025-08-15 20:00:00 |
SW |
Southwest |
D |
Demand |
18544 |
megawatthours |
2025-08-15 20:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
TI |
Total interchange |
3876 |
megawatthours |
2025-08-15 20:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
NG |
Net generation |
9313 |
megawatthours |
2025-08-15 20:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6505 |
megawatthours |
2025-08-15 20:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
5703 |
megawatthours |
2025-08-15 20:00:00 |
SPA |
Southwestern Power Administration |
D |
Demand |
37 |
megawatthours |
2025-08-15 20:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
TI |
Total interchange |
4328 |
megawatthours |
2025-08-15 20:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
NG |
Net generation |
44468 |
megawatthours |
2025-08-15 20:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
41699 |
megawatthours |
2025-08-15 20:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
40140 |
megawatthours |
2025-08-15 20:00:00 |
SEPA |
Southeastern Power Administration |
TI |
Total interchange |
738 |
megawatthours |
2025-08-15 20:00:00 |
SEPA |
Southeastern Power Administration |
NG |
Net generation |
736 |
megawatthours |
2025-08-15 20:00:00 |
SEC |
Seminole Electric Cooperative |
TI |
Total interchange |
1894 |
megawatthours |
2025-08-15 20:00:00 |
SEC |
Seminole Electric Cooperative |
NG |
Net generation |
2331 |
megawatthours |
2025-08-15 20:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
425 |
megawatthours |
2025-08-15 20:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
437 |
megawatthours |
2025-08-15 20:00:00 |
SE |
Southeast |
TI |
Total interchange |
5066 |
megawatthours |
2025-08-15 20:00:00 |
SE |
Southeast |
NG |
Net generation |
45204 |
megawatthours |
2025-08-15 20:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
41699 |
megawatthours |
2025-08-15 20:00:00 |
SE |
Southeast |
D |
Demand |
40140 |
megawatthours |
2025-08-15 20:00:00 |
SCL |
Seattle City Light |
TI |
Total interchange |
-794 |
megawatthours |
2025-08-15 20:00:00 |
SCL |
Seattle City Light |
NG |
Net generation |
351 |
megawatthours |
2025-08-15 20:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
1020 |
megawatthours |
2025-08-15 20:00:00 |
SCL |
Seattle City Light |
D |
Demand |
1145 |
megawatthours |
2025-08-15 20:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
TI |
Total interchange |
190 |
megawatthours |
2025-08-15 20:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
NG |
Net generation |
4627 |
megawatthours |
2025-08-15 20:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
4449 |
megawatthours |
2025-08-15 20:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
4437 |
megawatthours |
2025-08-15 20:00:00 |
SC |
South Carolina Public Service Authority |
NG |
Net generation |
3111 |
megawatthours |
2025-08-15 20:00:00 |
SC |
South Carolina Public Service Authority |
DF |
Day-ahead demand forecast |
4498 |
megawatthours |
2025-08-15 20:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
4510 |
megawatthours |
2025-08-15 20:00:00 |
PSEI |
Puget Sound Energy, Inc. |
TI |
Total interchange |
-2162 |
megawatthours |
2025-08-15 20:00:00 |
PSEI |
Puget Sound Energy, Inc. |
NG |
Net generation |
657 |
megawatthours |
2025-08-15 20:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2066 |
megawatthours |
2025-08-15 20:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2819 |
megawatthours |
2025-08-15 20:00:00 |
PSCO |
Public Service Company of Colorado |
TI |
Total interchange |
334 |
megawatthours |
2025-08-15 20:00:00 |
PSCO |
Public Service Company of Colorado |
NG |
Net generation |
8198 |
megawatthours |
2025-08-15 20:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
6818 |
megawatthours |
2025-08-15 20:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
7864 |
megawatthours |
2025-08-15 20:00:00 |
PNM |
Public Service Company of New Mexico |
TI |
Total interchange |
-51 |
megawatthours |
2025-08-15 20:00:00 |
PNM |
Public Service Company of New Mexico |
NG |
Net generation |
1956 |
megawatthours |
2025-08-15 20:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1975 |
megawatthours |
2025-08-15 20:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
2111 |
megawatthours |
2025-08-15 20:00:00 |
PJM |
PJM Interconnection, LLC |
TI |
Total interchange |
-266 |
megawatthours |
2025-08-15 20:00:00 |
PJM |
PJM Interconnection, LLC |
NG |
Net generation |
149593 |
megawatthours |
2025-08-15 20:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
141475 |
megawatthours |
2025-08-15 20:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
143296 |
megawatthours |
2025-08-15 20:00:00 |
PGE |
Portland General Electric Company |
TI |
Total interchange |
-2342 |
megawatthours |
2025-08-15 20:00:00 |
PGE |
Portland General Electric Company |
NG |
Net generation |
557 |
megawatthours |
2025-08-15 20:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2846 |
megawatthours |
2025-08-15 20:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2899 |
megawatthours |
2025-08-15 20:00:00 |
PACW |
PacifiCorp West |
TI |
Total interchange |
-2016 |
megawatthours |
2025-08-15 20:00:00 |
PACW |
PacifiCorp West |
NG |
Net generation |
702 |
megawatthours |
2025-08-15 20:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2723 |
megawatthours |
2025-08-15 20:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2718 |
megawatthours |
2025-08-15 20:00:00 |
PACE |
PacifiCorp East |
TI |
Total interchange |
-165 |
megawatthours |
2025-08-15 20:00:00 |
PACE |
PacifiCorp East |
NG |
Net generation |
7698 |
megawatthours |
2025-08-15 20:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
8635 |
megawatthours |
2025-08-15 20:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
7863 |
megawatthours |
2025-08-15 20:00:00 |
NYIS |
New York Independent System Operator |
TI |
Total interchange |
-262 |
megawatthours |
2025-08-15 20:00:00 |
NYIS |
New York Independent System Operator |
NG |
Net generation |
24359 |
megawatthours |
2025-08-15 20:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
24132 |
megawatthours |
2025-08-15 20:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
24621 |
megawatthours |
2025-08-15 20:00:00 |
NY |
New York |
TI |
Total interchange |
-262 |
megawatthours |
2025-08-15 20:00:00 |
NY |
New York |
NG |
Net generation |
24359 |
megawatthours |
2025-08-15 20:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
24132 |
megawatthours |
2025-08-15 20:00:00 |
NY |
New York |
D |
Demand |
24621 |
megawatthours |
2025-08-15 20:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1526 |
megawatthours |
2025-08-15 20:00:00 |
NW |
Northwest |
TI |
Total interchange |
-3073 |
megawatthours |
2025-08-15 20:00:00 |
NW |
Northwest |
NG |
Net generation |
47329 |
megawatthours |
2025-08-15 20:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
48374 |
megawatthours |
2025-08-15 20:00:00 |
NW |
Northwest |
D |
Demand |
51936 |
megawatthours |
2025-08-15 20:00:00 |
NEVP |
Nevada Power Company |
TI |
Total interchange |
-921 |
megawatthours |
2025-08-15 20:00:00 |
NEVP |
Nevada Power Company |
NG |
Net generation |
5545 |
megawatthours |
2025-08-15 20:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
6331 |
megawatthours |
2025-08-15 20:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
6466 |
megawatthours |
2025-08-15 20:00:00 |
NE |
New England |
TI |
Total interchange |
370 |
megawatthours |
2025-08-15 20:00:00 |
NE |
New England |
NG |
Net generation |
16542 |
megawatthours |
2025-08-15 20:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
16670 |
megawatthours |
2025-08-15 20:00:00 |
NE |
New England |
D |
Demand |
16172 |
megawatthours |
2025-08-15 20:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
TI |
Total interchange |
-4804 |
megawatthours |
2025-08-15 20:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
NG |
Net generation |
108624 |
megawatthours |
2025-08-15 20:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
111433 |
megawatthours |
2025-08-15 20:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
111419 |
megawatthours |
2025-08-15 20:00:00 |
MIDW |
Midwest |
TI |
Total interchange |
-5091 |
megawatthours |
2025-08-15 20:00:00 |
MIDW |
Midwest |
NG |
Net generation |
119206 |
megawatthours |
2025-08-15 20:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
122173 |
megawatthours |
2025-08-15 20:00:00 |
MIDW |
Midwest |
D |
Demand |
122698 |
megawatthours |
2025-08-15 20:00:00 |
MIDA |
Mid-Atlantic |
TI |
Total interchange |
-266 |
megawatthours |
2025-08-15 20:00:00 |
MIDA |
Mid-Atlantic |
NG |
Net generation |
149593 |
megawatthours |
2025-08-15 20:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
141475 |
megawatthours |
2025-08-15 20:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
143296 |
megawatthours |
2025-08-15 20:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
TI |
Total interchange |
-287 |
megawatthours |
2025-08-15 20:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
NG |
Net generation |
6597 |
megawatthours |
2025-08-15 20:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
6389 |
megawatthours |
2025-08-15 20:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
6884 |
megawatthours |
2025-08-15 20:00:00 |
LDWP |
Los Angeles Department of Water and Power |
TI |
Total interchange |
-466 |
megawatthours |
2025-08-15 20:00:00 |
LDWP |
Los Angeles Department of Water and Power |
NG |
Net generation |
3013 |
megawatthours |
2025-08-15 20:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
3019 |
megawatthours |
2025-08-15 20:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
3479 |
megawatthours |
2025-08-15 20:00:00 |
JEA |
JEA |
TI |
Total interchange |
-502 |
megawatthours |
2025-08-15 20:00:00 |
JEA |
JEA |
NG |
Net generation |
2108 |
megawatthours |
2025-08-15 20:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2475 |
megawatthours |
2025-08-15 20:00:00 |
JEA |
JEA |
D |
Demand |
2610 |
megawatthours |
2025-08-15 20:00:00 |
ISNE |
ISO New England |
TI |
Total interchange |
370 |
megawatthours |
2025-08-15 20:00:00 |
ISNE |
ISO New England |
NG |
Net generation |
16542 |
megawatthours |
2025-08-15 20:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
16670 |
megawatthours |
2025-08-15 20:00:00 |
ISNE |
ISO New England |
D |
Demand |
16172 |
megawatthours |
2025-08-15 20:00:00 |
IPCO |
Idaho Power Company |
TI |
Total interchange |
-1188 |
megawatthours |
2025-08-15 20:00:00 |
IPCO |
Idaho Power Company |
NG |
Net generation |
1892 |
megawatthours |
2025-08-15 20:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2995 |
megawatthours |
2025-08-15 20:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
3082 |
megawatthours |
2025-08-15 20:00:00 |
IID |
Imperial Irrigation District |
NG |
Net generation |
1020 |
megawatthours |
2025-08-15 20:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
740 |
megawatthours |
2025-08-15 20:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
735 |
megawatthours |
2025-08-15 20:00:00 |
HST |
City of Homestead |
TI |
Total interchange |
-119 |
megawatthours |
2025-08-15 20:00:00 |
HST |
City of Homestead |
NG |
Net generation |
0 |
megawatthours |
2025-08-15 20:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
116 |
megawatthours |
2025-08-15 20:00:00 |
HST |
City of Homestead |
D |
Demand |
119 |
megawatthours |
2025-08-15 20:00:00 |
GWA |
NaturEner Power Watch, LLC |
TI |
Total interchange |
0 |
megawatthours |
2025-08-15 20:00:00 |
GWA |
NaturEner Power Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-15 20:00:00 |
GVL |
Gainesville Regional Utilities |
TI |
Total interchange |
-122 |
megawatthours |
2025-08-15 20:00:00 |
GVL |
Gainesville Regional Utilities |
NG |
Net generation |
319 |
megawatthours |
2025-08-15 20:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
236 |
megawatthours |
2025-08-15 20:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
448 |
megawatthours |
2025-08-15 20:00:00 |
GRID |
Gridforce Energy Management, LLC |
TI |
Total interchange |
2150 |
megawatthours |
2025-08-15 20:00:00 |
GRID |
Gridforce Energy Management, LLC |
NG |
Net generation |
2150 |
megawatthours |
2025-08-15 20:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
TI |
Total interchange |
-116 |
megawatthours |
2025-08-15 20:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
NG |
Net generation |
761 |
megawatthours |
2025-08-15 20:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
862 |
megawatthours |
2025-08-15 20:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
883 |
megawatthours |
2025-08-15 20:00:00 |
FPL |
Florida Power & Light Co. |
TI |
Total interchange |
505 |
megawatthours |
2025-08-15 20:00:00 |
FPL |
Florida Power & Light Co. |
NG |
Net generation |
28953 |
megawatthours |
2025-08-15 20:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
28392 |
megawatthours |
2025-08-15 20:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
28448 |
megawatthours |
2025-08-15 20:00:00 |
FPC |
Duke Energy Florida, Inc. |
TI |
Total interchange |
-2353 |
megawatthours |
2025-08-15 20:00:00 |
FPC |
Duke Energy Florida, Inc. |
NG |
Net generation |
9676 |
megawatthours |
2025-08-15 20:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
9119 |
megawatthours |
2025-08-15 20:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
12029 |
megawatthours |
2025-08-15 20:00:00 |
FMPP |
Florida Municipal Power Pool |
TI |
Total interchange |
-8 |
megawatthours |
2025-08-15 20:00:00 |
FMPP |
Florida Municipal Power Pool |
NG |
Net generation |
3800 |
megawatthours |
2025-08-15 20:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
3808 |
megawatthours |
2025-08-15 20:00:00 |
FLA |
Florida |
TI |
Total interchange |
-1892 |
megawatthours |
2025-08-15 20:00:00 |
FLA |
Florida |
NG |
Net generation |
50908 |
megawatthours |
2025-08-15 20:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
41255 |
megawatthours |
2025-08-15 20:00:00 |
FLA |
Florida |
D |
Demand |
52806 |
megawatthours |
2025-08-15 20:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
TI |
Total interchange |
0 |
megawatthours |
2025-08-15 20:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
NG |
Net generation |
79887 |
megawatthours |
2025-08-15 20:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
82007 |
megawatthours |
2025-08-15 20:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
79887 |
megawatthours |
2025-08-15 20:00:00 |
EPE |
El Paso Electric Company |
TI |
Total interchange |
-560 |
megawatthours |
2025-08-15 20:00:00 |
EPE |
El Paso Electric Company |
NG |
Net generation |
1051 |
megawatthours |
2025-08-15 20:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1702 |
megawatthours |
2025-08-15 20:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1610 |
megawatthours |
2025-08-15 20:00:00 |
DUK |
Duke Energy Carolinas |
TI |
Total interchange |
166 |
megawatthours |
2025-08-15 20:00:00 |
DUK |
Duke Energy Carolinas |
NG |
Net generation |
19727 |
megawatthours |
2025-08-15 20:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
19267 |
megawatthours |
2025-08-15 20:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
19561 |
megawatthours |
2025-08-15 20:00:00 |
DOPD |
PUD No. 1 of Douglas County |
TI |
Total interchange |
16 |
megawatthours |
2025-08-15 20:00:00 |
DOPD |
PUD No. 1 of Douglas County |
NG |
Net generation |
292 |
megawatthours |
2025-08-15 20:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
307 |
megawatthours |
2025-08-15 20:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
276 |
megawatthours |
2025-08-15 20:00:00 |
DEAA |
Arlington Valley, LLC |
TI |
Total interchange |
480 |
megawatthours |
2025-08-15 20:00:00 |
DEAA |
Arlington Valley, LLC |
NG |
Net generation |
480 |
megawatthours |
2025-08-15 20:00:00 |
CPLW |
Duke Energy Progress West |
TI |
Total interchange |
-56 |
megawatthours |
2025-08-15 20:00:00 |
CPLW |
Duke Energy Progress West |
NG |
Net generation |
689 |
megawatthours |
2025-08-15 20:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
732 |
megawatthours |
2025-08-15 20:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
745 |
megawatthours |
2025-08-15 20:00:00 |
CPLE |
Duke Energy Progress East |
TI |
Total interchange |
-171 |
megawatthours |
2025-08-15 20:00:00 |
CPLE |
Duke Energy Progress East |
NG |
Net generation |
10657 |
megawatthours |
2025-08-15 20:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
10927 |
megawatthours |
2025-08-15 20:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
10828 |
megawatthours |
2025-08-15 20:00:00 |
CISO |
California Independent System Operator |
TI |
Total interchange |
-1613 |
megawatthours |
2025-08-15 20:00:00 |
CISO |
California Independent System Operator |
NG |
Net generation |
30597 |
megawatthours |
2025-08-15 20:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
25133 |
megawatthours |
2025-08-15 20:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
31509 |
megawatthours |
2025-08-15 20:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
TI |
Total interchange |
693 |
megawatthours |
2025-08-15 20:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
NG |
Net generation |
896 |
megawatthours |
2025-08-15 20:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
197 |
megawatthours |
2025-08-15 20:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
203 |
megawatthours |
2025-08-15 20:00:00 |
CENT |
Central |
TI |
Total interchange |
-64 |
megawatthours |
2025-08-15 20:00:00 |
CENT |
Central |
NG |
Net generation |
53092 |
megawatthours |
2025-08-15 20:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
55642 |
megawatthours |
2025-08-15 20:00:00 |
CENT |
Central |
D |
Demand |
53193 |
megawatthours |
2025-08-15 20:00:00 |
CAR |
Carolinas |
TI |
Total interchange |
313 |
megawatthours |
2025-08-15 20:00:00 |
CAR |
Carolinas |
NG |
Net generation |
38998 |
megawatthours |
2025-08-15 20:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
39873 |
megawatthours |
2025-08-15 20:00:00 |
CAR |
Carolinas |
D |
Demand |
40081 |
megawatthours |
2025-08-15 20:00:00 |
CAL |
California |
TI |
Total interchange |
-3254 |
megawatthours |
2025-08-15 20:00:00 |
CAL |
California |
NG |
Net generation |
36621 |
megawatthours |
2025-08-15 20:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
31946 |
megawatthours |
2025-08-15 20:00:00 |
CAL |
California |
D |
Demand |
38890 |
megawatthours |
2025-08-15 20:00:00 |
BPAT |
Bonneville Power Administration |
TI |
Total interchange |
3335 |
megawatthours |
2025-08-15 20:00:00 |
BPAT |
Bonneville Power Administration |
NG |
Net generation |
10499 |
megawatthours |
2025-08-15 20:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
7039 |
megawatthours |
2025-08-15 20:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
7164 |
megawatthours |
2025-08-15 20:00:00 |
BANC |
Balancing Authority of Northern California |
TI |
Total interchange |
-1000 |
megawatthours |
2025-08-15 20:00:00 |
BANC |
Balancing Authority of Northern California |
NG |
Net generation |
1724 |
megawatthours |
2025-08-15 20:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2598 |
megawatthours |
2025-08-15 20:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
2724 |
megawatthours |
2025-08-15 20:00:00 |
AZPS |
Arizona Public Service Company |
TI |
Total interchange |
-2315 |
megawatthours |
2025-08-15 20:00:00 |
AZPS |
Arizona Public Service Company |
NG |
Net generation |
3412 |
megawatthours |
2025-08-15 20:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
6189 |
megawatthours |
2025-08-15 20:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
5727 |
megawatthours |
2025-08-15 20:00:00 |
AVRN |
Avangrid Renewables, LLC |
TI |
Total interchange |
1327 |
megawatthours |
2025-08-15 20:00:00 |
AVRN |
Avangrid Renewables, LLC |
NG |
Net generation |
1327 |
megawatthours |
2025-08-15 20:00:00 |
AVA |
Avista Corporation |
TI |
Total interchange |
-636 |
megawatthours |
2025-08-15 20:00:00 |
AVA |
Avista Corporation |
NG |
Net generation |
885 |
megawatthours |
2025-08-15 20:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1573 |
megawatthours |
2025-08-15 20:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1521 |
megawatthours |
2025-08-15 20:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
NG |
Net generation |
3985 |
megawatthours |
2025-08-15 20:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
DF |
Day-ahead demand forecast |
4351 |
megawatthours |
2025-08-15 20:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
4395 |
megawatthours |
2025-08-15 19:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
TI |
Total interchange |
186 |
megawatthours |
2025-08-15 19:00:00 |
YAD |
Alcoa Power Generating, Inc. - Yadkin Division |
NG |
Net generation |
190 |
megawatthours |
2025-08-15 19:00:00 |
WWA |
NaturEner Wind Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-15 19:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
TI |
Total interchange |
-31 |
megawatthours |
2025-08-15 19:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
NG |
Net generation |
84 |
megawatthours |
2025-08-15 19:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
109 |
megawatthours |
2025-08-15 19:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
D |
Demand |
115 |
megawatthours |
2025-08-15 19:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
TI |
Total interchange |
335 |
megawatthours |
2025-08-15 19:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
NG |
Net generation |
1484 |
megawatthours |
2025-08-15 19:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1369 |
megawatthours |
2025-08-15 19:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
D |
Demand |
1149 |
megawatthours |
2025-08-15 19:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
TI |
Total interchange |
-203 |
megawatthours |
2025-08-15 19:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
NG |
Net generation |
4764 |
megawatthours |
2025-08-15 19:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4204 |
megawatthours |
2025-08-15 19:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
D |
Demand |
4967 |
megawatthours |
2025-08-15 19:00:00 |
US48 |
United States Lower 48 |
TI |
Total interchange |
-9035 |
megawatthours |
2025-08-15 19:00:00 |
US48 |
United States Lower 48 |
NG |
Net generation |
692422 |
megawatthours |
2025-08-15 19:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
639544 |
megawatthours |
2025-08-15 19:00:00 |
US48 |
United States Lower 48 |
D |
Demand |
700783 |
megawatthours |
2025-08-15 19:00:00 |
TVA |
Tennessee Valley Authority |
TI |
Total interchange |
-2971 |
megawatthours |
2025-08-15 19:00:00 |
TVA |
Tennessee Valley Authority |
NG |
Net generation |
26095 |
megawatthours |
2025-08-15 19:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
29083 |
megawatthours |
2025-08-15 19:00:00 |
TVA |
Tennessee Valley Authority |
D |
Demand |
29181 |
megawatthours |
2025-08-15 19:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
TI |
Total interchange |
-428 |
megawatthours |
2025-08-15 19:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
NG |
Net generation |
68 |
megawatthours |
2025-08-15 19:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
486 |
megawatthours |
2025-08-15 19:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
D |
Demand |
496 |
megawatthours |
2025-08-15 19:00:00 |
TIDC |
Turlock Irrigation District |
TI |
Total interchange |
-160 |
megawatthours |
2025-08-15 19:00:00 |
TIDC |
Turlock Irrigation District |
NG |
Net generation |
249 |
megawatthours |
2025-08-15 19:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
422 |
megawatthours |
2025-08-15 19:00:00 |
TIDC |
Turlock Irrigation District |
D |
Demand |
409 |
megawatthours |
2025-08-15 19:00:00 |
TEX |
Texas |
TI |
Total interchange |
76 |
megawatthours |
2025-08-15 19:00:00 |
TEX |
Texas |
NG |
Net generation |
78582 |
megawatthours |
2025-08-15 19:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
80538 |
megawatthours |
2025-08-15 19:00:00 |
TEX |
Texas |
D |
Demand |
78506 |
megawatthours |
2025-08-15 19:00:00 |
TEPC |
Tucson Electric Power |
TI |
Total interchange |
-230 |
megawatthours |
2025-08-15 19:00:00 |
TEPC |
Tucson Electric Power |
NG |
Net generation |
1910 |
megawatthours |
2025-08-15 19:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2165 |
megawatthours |
2025-08-15 19:00:00 |
TEPC |
Tucson Electric Power |
D |
Demand |
2140 |
megawatthours |
2025-08-15 19:00:00 |
TEN |
Tennessee |
TI |
Total interchange |
-2971 |
megawatthours |
2025-08-15 19:00:00 |
TEN |
Tennessee |
NG |
Net generation |
26095 |
megawatthours |
2025-08-15 19:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
29083 |
megawatthours |
2025-08-15 19:00:00 |
TEN |
Tennessee |
D |
Demand |
29181 |
megawatthours |
2025-08-15 19:00:00 |
TEC |
Tampa Electric Company |
TI |
Total interchange |
-746 |
megawatthours |
2025-08-15 19:00:00 |
TEC |
Tampa Electric Company |
NG |
Net generation |
3570 |
megawatthours |
2025-08-15 19:00:00 |
TEC |
Tampa Electric Company |
DF |
Day-ahead demand forecast |
4382 |
megawatthours |
2025-08-15 19:00:00 |
TEC |
Tampa Electric Company |
D |
Demand |
4315 |
megawatthours |
2025-08-15 19:00:00 |
TAL |
City of Tallahassee |
TI |
Total interchange |
-3 |
megawatthours |
2025-08-15 19:00:00 |
TAL |
City of Tallahassee |
NG |
Net generation |
549 |
megawatthours |
2025-08-15 19:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
497 |
megawatthours |
2025-08-15 19:00:00 |
TAL |
City of Tallahassee |
D |
Demand |
551 |
megawatthours |
2025-08-15 19:00:00 |
SWPP |
Southwest Power Pool |
TI |
Total interchange |
133 |
megawatthours |
2025-08-15 19:00:00 |
SWPP |
Southwest Power Pool |
NG |
Net generation |
52156 |
megawatthours |
2025-08-15 19:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
53995 |
megawatthours |
2025-08-15 19:00:00 |
SWPP |
Southwest Power Pool |
D |
Demand |
52024 |
megawatthours |
2025-08-15 19:00:00 |
SW |
Southwest |
TI |
Total interchange |
1366 |
megawatthours |
2025-08-15 19:00:00 |
SW |
Southwest |
NG |
Net generation |
18615 |
megawatthours |
2025-08-15 19:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
19035 |
megawatthours |
2025-08-15 19:00:00 |
SW |
Southwest |
D |
Demand |
17603 |
megawatthours |
2025-08-15 19:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
TI |
Total interchange |
4099 |
megawatthours |
2025-08-15 19:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
NG |
Net generation |
9183 |
megawatthours |
2025-08-15 19:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
6131 |
megawatthours |
2025-08-15 19:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
D |
Demand |
5359 |
megawatthours |
2025-08-15 19:00:00 |
SPA |
Southwestern Power Administration |
D |
Demand |
30 |
megawatthours |
2025-08-15 19:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
TI |
Total interchange |
4219 |
megawatthours |
2025-08-15 19:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
NG |
Net generation |
41181 |
megawatthours |
2025-08-15 19:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
DF |
Day-ahead demand forecast |
41034 |
megawatthours |
2025-08-15 19:00:00 |
SOCO |
Southern Company Services, Inc. - Trans |
D |
Demand |
41918 |
megawatthours |
2025-08-15 19:00:00 |
SEPA |
Southeastern Power Administration |
TI |
Total interchange |
674 |
megawatthours |
2025-08-15 19:00:00 |
SEPA |
Southeastern Power Administration |
NG |
Net generation |
676 |
megawatthours |
2025-08-15 19:00:00 |
SEC |
Seminole Electric Cooperative |
TI |
Total interchange |
1953 |
megawatthours |
2025-08-15 19:00:00 |
SEC |
Seminole Electric Cooperative |
NG |
Net generation |
2393 |
megawatthours |
2025-08-15 19:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
416 |
megawatthours |
2025-08-15 19:00:00 |
SEC |
Seminole Electric Cooperative |
D |
Demand |
440 |
megawatthours |
2025-08-15 19:00:00 |
SE |
Southeast |
TI |
Total interchange |
4893 |
megawatthours |
2025-08-15 19:00:00 |
SE |
Southeast |
NG |
Net generation |
41857 |
megawatthours |
2025-08-15 19:00:00 |
SE |
Southeast |
DF |
Day-ahead demand forecast |
41034 |
megawatthours |
2025-08-15 19:00:00 |
SE |
Southeast |
D |
Demand |
41918 |
megawatthours |
2025-08-15 19:00:00 |
SCL |
Seattle City Light |
TI |
Total interchange |
-799 |
megawatthours |
2025-08-15 19:00:00 |
SCL |
Seattle City Light |
NG |
Net generation |
322 |
megawatthours |
2025-08-15 19:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
1014 |
megawatthours |
2025-08-15 19:00:00 |
SCL |
Seattle City Light |
D |
Demand |
1121 |
megawatthours |
2025-08-15 19:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
TI |
Total interchange |
211 |
megawatthours |
2025-08-15 19:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
NG |
Net generation |
4659 |
megawatthours |
2025-08-15 19:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
4382 |
megawatthours |
2025-08-15 19:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
D |
Demand |
4448 |
megawatthours |
2025-08-15 19:00:00 |
SC |
South Carolina Public Service Authority |
NG |
Net generation |
3164 |
megawatthours |
2025-08-15 19:00:00 |
SC |
South Carolina Public Service Authority |
DF |
Day-ahead demand forecast |
4474 |
megawatthours |
2025-08-15 19:00:00 |
SC |
South Carolina Public Service Authority |
D |
Demand |
4617 |
megawatthours |
2025-08-15 19:00:00 |
PSEI |
Puget Sound Energy, Inc. |
TI |
Total interchange |
-2144 |
megawatthours |
2025-08-15 19:00:00 |
PSEI |
Puget Sound Energy, Inc. |
NG |
Net generation |
640 |
megawatthours |
2025-08-15 19:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2100 |
megawatthours |
2025-08-15 19:00:00 |
PSEI |
Puget Sound Energy, Inc. |
D |
Demand |
2784 |
megawatthours |
2025-08-15 19:00:00 |
PSCO |
Public Service Company of Colorado |
TI |
Total interchange |
299 |
megawatthours |
2025-08-15 19:00:00 |
PSCO |
Public Service Company of Colorado |
NG |
Net generation |
7539 |
megawatthours |
2025-08-15 19:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
6284 |
megawatthours |
2025-08-15 19:00:00 |
PSCO |
Public Service Company of Colorado |
D |
Demand |
7240 |
megawatthours |
2025-08-15 19:00:00 |
PNM |
Public Service Company of New Mexico |
TI |
Total interchange |
-294 |
megawatthours |
2025-08-15 19:00:00 |
PNM |
Public Service Company of New Mexico |
NG |
Net generation |
1703 |
megawatthours |
2025-08-15 19:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1867 |
megawatthours |
2025-08-15 19:00:00 |
PNM |
Public Service Company of New Mexico |
D |
Demand |
2077 |
megawatthours |
2025-08-15 19:00:00 |
PJM |
PJM Interconnection, LLC |
TI |
Total interchange |
-327 |
megawatthours |
2025-08-15 19:00:00 |
PJM |
PJM Interconnection, LLC |
NG |
Net generation |
147099 |
megawatthours |
2025-08-15 19:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
140081 |
megawatthours |
2025-08-15 19:00:00 |
PJM |
PJM Interconnection, LLC |
D |
Demand |
140374 |
megawatthours |
2025-08-15 19:00:00 |
PGE |
Portland General Electric Company |
TI |
Total interchange |
-2093 |
megawatthours |
2025-08-15 19:00:00 |
PGE |
Portland General Electric Company |
NG |
Net generation |
781 |
megawatthours |
2025-08-15 19:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2797 |
megawatthours |
2025-08-15 19:00:00 |
PGE |
Portland General Electric Company |
D |
Demand |
2874 |
megawatthours |
2025-08-15 19:00:00 |
PACW |
PacifiCorp West |
TI |
Total interchange |
-1857 |
megawatthours |
2025-08-15 19:00:00 |
PACW |
PacifiCorp West |
NG |
Net generation |
767 |
megawatthours |
2025-08-15 19:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2627 |
megawatthours |
2025-08-15 19:00:00 |
PACW |
PacifiCorp West |
D |
Demand |
2624 |
megawatthours |
2025-08-15 19:00:00 |
PACE |
PacifiCorp East |
TI |
Total interchange |
-67 |
megawatthours |
2025-08-15 19:00:00 |
PACE |
PacifiCorp East |
NG |
Net generation |
7735 |
megawatthours |
2025-08-15 19:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
8282 |
megawatthours |
2025-08-15 19:00:00 |
PACE |
PacifiCorp East |
D |
Demand |
7802 |
megawatthours |
2025-08-15 19:00:00 |
NYIS |
New York Independent System Operator |
TI |
Total interchange |
-46 |
megawatthours |
2025-08-15 19:00:00 |
NYIS |
New York Independent System Operator |
NG |
Net generation |
23736 |
megawatthours |
2025-08-15 19:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
23535 |
megawatthours |
2025-08-15 19:00:00 |
NYIS |
New York Independent System Operator |
D |
Demand |
23782 |
megawatthours |
2025-08-15 19:00:00 |
NY |
New York |
TI |
Total interchange |
-46 |
megawatthours |
2025-08-15 19:00:00 |
NY |
New York |
NG |
Net generation |
23736 |
megawatthours |
2025-08-15 19:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
23535 |
megawatthours |
2025-08-15 19:00:00 |
NY |
New York |
D |
Demand |
23782 |
megawatthours |
2025-08-15 19:00:00 |
NWMT |
NorthWestern Corporation |
D |
Demand |
1473 |
megawatthours |
2025-08-15 19:00:00 |
NW |
Northwest |
TI |
Total interchange |
-3352 |
megawatthours |
2025-08-15 19:00:00 |
NW |
Northwest |
NG |
Net generation |
45978 |
megawatthours |
2025-08-15 19:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
46519 |
megawatthours |
2025-08-15 19:00:00 |
NW |
Northwest |
D |
Demand |
50811 |
megawatthours |
2025-08-15 19:00:00 |
NEVP |
Nevada Power Company |
TI |
Total interchange |
-971 |
megawatthours |
2025-08-15 19:00:00 |
NEVP |
Nevada Power Company |
NG |
Net generation |
5466 |
megawatthours |
2025-08-15 19:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
5930 |
megawatthours |
2025-08-15 19:00:00 |
NEVP |
Nevada Power Company |
D |
Demand |
6437 |
megawatthours |
2025-08-15 19:00:00 |
NE |
New England |
TI |
Total interchange |
1110 |
megawatthours |
2025-08-15 19:00:00 |
NE |
New England |
NG |
Net generation |
16351 |
megawatthours |
2025-08-15 19:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
15870 |
megawatthours |
2025-08-15 19:00:00 |
NE |
New England |
D |
Demand |
15241 |
megawatthours |
2025-08-15 19:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
TI |
Total interchange |
-5096 |
megawatthours |
2025-08-15 19:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
NG |
Net generation |
106627 |
megawatthours |
2025-08-15 19:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
109137 |
megawatthours |
2025-08-15 19:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
D |
Demand |
109719 |
megawatthours |
2025-08-15 19:00:00 |
MIDW |
Midwest |
TI |
Total interchange |
-5432 |
megawatthours |
2025-08-15 19:00:00 |
MIDW |
Midwest |
NG |
Net generation |
117068 |
megawatthours |
2025-08-15 19:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
119618 |
megawatthours |
2025-08-15 19:00:00 |
MIDW |
Midwest |
D |
Demand |
120783 |
megawatthours |
2025-08-15 19:00:00 |
MIDA |
Mid-Atlantic |
TI |
Total interchange |
-327 |
megawatthours |
2025-08-15 19:00:00 |
MIDA |
Mid-Atlantic |
NG |
Net generation |
147099 |
megawatthours |
2025-08-15 19:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
140081 |
megawatthours |
2025-08-15 19:00:00 |
MIDA |
Mid-Atlantic |
D |
Demand |
140374 |
megawatthours |
2025-08-15 19:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
TI |
Total interchange |
-336 |
megawatthours |
2025-08-15 19:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
NG |
Net generation |
6497 |
megawatthours |
2025-08-15 19:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
6301 |
megawatthours |
2025-08-15 19:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
D |
Demand |
6833 |
megawatthours |
2025-08-15 19:00:00 |
LDWP |
Los Angeles Department of Water and Power |
TI |
Total interchange |
-384 |
megawatthours |
2025-08-15 19:00:00 |
LDWP |
Los Angeles Department of Water and Power |
NG |
Net generation |
2985 |
megawatthours |
2025-08-15 19:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2925 |
megawatthours |
2025-08-15 19:00:00 |
LDWP |
Los Angeles Department of Water and Power |
D |
Demand |
3369 |
megawatthours |
2025-08-15 19:00:00 |
JEA |
JEA |
TI |
Total interchange |
-526 |
megawatthours |
2025-08-15 19:00:00 |
JEA |
JEA |
NG |
Net generation |
2104 |
megawatthours |
2025-08-15 19:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2479 |
megawatthours |
2025-08-15 19:00:00 |
JEA |
JEA |
D |
Demand |
2630 |
megawatthours |
2025-08-15 19:00:00 |
ISNE |
ISO New England |
TI |
Total interchange |
1110 |
megawatthours |
2025-08-15 19:00:00 |
ISNE |
ISO New England |
NG |
Net generation |
16351 |
megawatthours |
2025-08-15 19:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
15870 |
megawatthours |
2025-08-15 19:00:00 |
ISNE |
ISO New England |
D |
Demand |
15241 |
megawatthours |
2025-08-15 19:00:00 |
IPCO |
Idaho Power Company |
TI |
Total interchange |
-1185 |
megawatthours |
2025-08-15 19:00:00 |
IPCO |
Idaho Power Company |
NG |
Net generation |
1770 |
megawatthours |
2025-08-15 19:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2869 |
megawatthours |
2025-08-15 19:00:00 |
IPCO |
Idaho Power Company |
D |
Demand |
2957 |
megawatthours |
2025-08-15 19:00:00 |
IID |
Imperial Irrigation District |
NG |
Net generation |
1091 |
megawatthours |
2025-08-15 19:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
680 |
megawatthours |
2025-08-15 19:00:00 |
IID |
Imperial Irrigation District |
D |
Demand |
696 |
megawatthours |
2025-08-15 19:00:00 |
HST |
City of Homestead |
TI |
Total interchange |
-115 |
megawatthours |
2025-08-15 19:00:00 |
HST |
City of Homestead |
NG |
Net generation |
0 |
megawatthours |
2025-08-15 19:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
113 |
megawatthours |
2025-08-15 19:00:00 |
HST |
City of Homestead |
D |
Demand |
115 |
megawatthours |
2025-08-15 19:00:00 |
GWA |
NaturEner Power Watch, LLC |
TI |
Total interchange |
0 |
megawatthours |
2025-08-15 19:00:00 |
GWA |
NaturEner Power Watch, LLC |
NG |
Net generation |
0 |
megawatthours |
2025-08-15 19:00:00 |
GVL |
Gainesville Regional Utilities |
TI |
Total interchange |
-117 |
megawatthours |
2025-08-15 19:00:00 |
GVL |
Gainesville Regional Utilities |
NG |
Net generation |
306 |
megawatthours |
2025-08-15 19:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
234 |
megawatthours |
2025-08-15 19:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
431 |
megawatthours |
2025-08-15 19:00:00 |
GRID |
Gridforce Energy Management, LLC |
TI |
Total interchange |
2043 |
megawatthours |
2025-08-15 19:00:00 |
GRID |
Gridforce Energy Management, LLC |
NG |
Net generation |
2043 |
megawatthours |
2025-08-15 19:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
TI |
Total interchange |
125 |
megawatthours |
2025-08-15 19:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
NG |
Net generation |
1000 |
megawatthours |
2025-08-15 19:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
868 |
megawatthours |
2025-08-15 19:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
881 |
megawatthours |
2025-08-15 19:00:00 |
FPL |
Florida Power & Light Co. |
TI |
Total interchange |
399 |
megawatthours |
2025-08-15 19:00:00 |
FPL |
Florida Power & Light Co. |
NG |
Net generation |
28390 |
megawatthours |
2025-08-15 19:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
28331 |
megawatthours |
2025-08-15 19:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
27991 |
megawatthours |
2025-08-15 19:00:00 |
FPC |
Duke Energy Florida, Inc. |
TI |
Total interchange |
-2263 |
megawatthours |
2025-08-15 19:00:00 |
FPC |
Duke Energy Florida, Inc. |
NG |
Net generation |
9403 |
megawatthours |
2025-08-15 19:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
8918 |
megawatthours |
2025-08-15 19:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
11666 |
megawatthours |
2025-08-15 19:00:00 |
FMPP |
Florida Municipal Power Pool |
TI |
Total interchange |
-225 |
megawatthours |
2025-08-15 19:00:00 |
FMPP |
Florida Municipal Power Pool |
NG |
Net generation |
3502 |
megawatthours |
2025-08-15 19:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
3727 |
megawatthours |
2025-08-15 19:00:00 |
FLA |
Florida |
TI |
Total interchange |
-1643 |
megawatthours |
2025-08-15 19:00:00 |
FLA |
Florida |
NG |
Net generation |
50217 |
megawatthours |
2025-08-15 19:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
40988 |
megawatthours |
2025-08-15 19:00:00 |
FLA |
Florida |
D |
Demand |
51866 |
megawatthours |
2025-08-15 19:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
TI |
Total interchange |
76 |
megawatthours |
2025-08-15 19:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
NG |
Net generation |
78582 |
megawatthours |
2025-08-15 19:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
80538 |
megawatthours |
2025-08-15 19:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
78506 |
megawatthours |
2025-08-15 19:00:00 |
EPE |
El Paso Electric Company |
TI |
Total interchange |
-483 |
megawatthours |
2025-08-15 19:00:00 |
EPE |
El Paso Electric Company |
NG |
Net generation |
1002 |
megawatthours |
2025-08-15 19:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1599 |
megawatthours |
2025-08-15 19:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1484 |
megawatthours |
2025-08-15 19:00:00 |
DUK |
Duke Energy Carolinas |
TI |
Total interchange |
4 |
megawatthours |
2025-08-15 19:00:00 |
DUK |
Duke Energy Carolinas |
NG |
Net generation |
19348 |
megawatthours |
2025-08-15 19:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
18891 |
megawatthours |
2025-08-15 19:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
19344 |
megawatthours |
2025-08-15 19:00:00 |
DOPD |
PUD No. 1 of Douglas County |
TI |
Total interchange |
123 |
megawatthours |
2025-08-15 19:00:00 |
DOPD |
PUD No. 1 of Douglas County |
NG |
Net generation |
392 |
megawatthours |
2025-08-15 19:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
303 |
megawatthours |
2025-08-15 19:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
269 |
megawatthours |
2025-08-15 19:00:00 |
DEAA |
Arlington Valley, LLC |
TI |
Total interchange |
512 |
megawatthours |
2025-08-15 19:00:00 |
DEAA |
Arlington Valley, LLC |
NG |
Net generation |
512 |
megawatthours |
2025-08-15 19:00:00 |
CPLW |
Duke Energy Progress West |
TI |
Total interchange |
-37 |
megawatthours |
2025-08-15 19:00:00 |
CPLW |
Duke Energy Progress West |
NG |
Net generation |
691 |
megawatthours |
2025-08-15 19:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
712 |
megawatthours |
2025-08-15 19:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
728 |
megawatthours |
2025-08-15 19:00:00 |
CPLE |
Duke Energy Progress East |
TI |
Total interchange |
-121 |
megawatthours |
2025-08-15 19:00:00 |
CPLE |
Duke Energy Progress East |
NG |
Net generation |
10438 |
megawatthours |
2025-08-15 19:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
10775 |
megawatthours |
2025-08-15 19:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
10559 |
megawatthours |
2025-08-15 19:00:00 |
CISO |
California Independent System Operator |
TI |
Total interchange |
-1771 |
megawatthours |
2025-08-15 19:00:00 |
CISO |
California Independent System Operator |
NG |
Net generation |
30141 |
megawatthours |
2025-08-15 19:00:00 |
CISO |
California Independent System Operator |
DF |
Day-ahead demand forecast |
24640 |
megawatthours |
2025-08-15 19:00:00 |
CISO |
California Independent System Operator |
D |
Demand |
32012 |
megawatthours |
2025-08-15 19:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
TI |
Total interchange |
691 |
megawatthours |
2025-08-15 19:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
NG |
Net generation |
888 |
megawatthours |
2025-08-15 19:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
DF |
Day-ahead demand forecast |
196 |
megawatthours |
2025-08-15 19:00:00 |
CHPD |
Public Utility District No. 1 of Chelan County |
D |
Demand |
197 |
megawatthours |
2025-08-15 19:00:00 |
CENT |
Central |
TI |
Total interchange |
133 |
megawatthours |
2025-08-15 19:00:00 |
CENT |
Central |
NG |
Net generation |
52156 |
megawatthours |
2025-08-15 19:00:00 |
CENT |
Central |
DF |
Day-ahead demand forecast |
53995 |
megawatthours |
2025-08-15 19:00:00 |
CENT |
Central |
D |
Demand |
52054 |
megawatthours |
2025-08-15 19:00:00 |
CAR |
Carolinas |
TI |
Total interchange |
243 |
megawatthours |
2025-08-15 19:00:00 |
CAR |
Carolinas |
NG |
Net generation |
38490 |
megawatthours |
2025-08-15 19:00:00 |
CAR |
Carolinas |
DF |
Day-ahead demand forecast |
39234 |
megawatthours |
2025-08-15 19:00:00 |
CAR |
Carolinas |
D |
Demand |
39696 |
megawatthours |
2025-08-15 19:00:00 |
CAL |
California |
TI |
Total interchange |
-3085 |
megawatthours |
2025-08-15 19:00:00 |
CAL |
California |
NG |
Net generation |
36178 |
megawatthours |
2025-08-15 19:00:00 |
CAL |
California |
DF |
Day-ahead demand forecast |
31048 |
megawatthours |
2025-08-15 19:00:00 |
CAL |
California |
D |
Demand |
38968 |
megawatthours |
2025-08-15 19:00:00 |
BPAT |
Bonneville Power Administration |
TI |
Total interchange |
2585 |
megawatthours |
2025-08-15 19:00:00 |
BPAT |
Bonneville Power Administration |
NG |
Net generation |
9669 |
megawatthours |
2025-08-15 19:00:00 |
BPAT |
Bonneville Power Administration |
DF |
Day-ahead demand forecast |
6925 |
megawatthours |
2025-08-15 19:00:00 |
BPAT |
Bonneville Power Administration |
D |
Demand |
7084 |
megawatthours |
2025-08-15 19:00:00 |
BANC |
Balancing Authority of Northern California |
TI |
Total interchange |
-770 |
megawatthours |
2025-08-15 19:00:00 |
BANC |
Balancing Authority of Northern California |
NG |
Net generation |
1712 |
megawatthours |
2025-08-15 19:00:00 |
BANC |
Balancing Authority of Northern California |
DF |
Day-ahead demand forecast |
2381 |
megawatthours |
2025-08-15 19:00:00 |
BANC |
Balancing Authority of Northern California |
D |
Demand |
2482 |
megawatthours |
2025-08-15 19:00:00 |
AZPS |
Arizona Public Service Company |
TI |
Total interchange |
-2573 |
megawatthours |
2025-08-15 19:00:00 |
AZPS |
Arizona Public Service Company |
NG |
Net generation |
2821 |
megawatthours |
2025-08-15 19:00:00 |
AZPS |
Arizona Public Service Company |
DF |
Day-ahead demand forecast |
5904 |
megawatthours |
2025-08-15 19:00:00 |
AZPS |
Arizona Public Service Company |
D |
Demand |
5394 |
megawatthours |
2025-08-15 19:00:00 |
AVRN |
Avangrid Renewables, LLC |
TI |
Total interchange |
1193 |
megawatthours |
2025-08-15 19:00:00 |
AVRN |
Avangrid Renewables, LLC |
NG |
Net generation |
1193 |
megawatthours |
2025-08-15 19:00:00 |
AVA |
Avista Corporation |
TI |
Total interchange |
-633 |
megawatthours |
2025-08-15 19:00:00 |
AVA |
Avista Corporation |
NG |
Net generation |
857 |
megawatthours |
2025-08-15 19:00:00 |
AVA |
Avista Corporation |
DF |
Day-ahead demand forecast |
1525 |
megawatthours |
2025-08-15 19:00:00 |
AVA |
Avista Corporation |
D |
Demand |
1490 |
megawatthours |
2025-08-15 19:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
NG |
Net generation |
3944 |
megawatthours |
2025-08-15 19:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
DF |
Day-ahead demand forecast |
4180 |
megawatthours |
2025-08-15 19:00:00 |
AECI |
Associated Electric Cooperative, Inc. |
D |
Demand |
4231 |
megawatthours |
2025-08-15 18:00:00 |
WAUW |
Western Area Power Administration - Upper Great Plains West |
DF |
Day-ahead demand forecast |
106 |
megawatthours |
2025-08-15 18:00:00 |
WALC |
Western Area Power Administration - Desert Southwest Region |
DF |
Day-ahead demand forecast |
1264 |
megawatthours |
2025-08-15 18:00:00 |
WACM |
Western Area Power Administration - Rocky Mountain Region |
DF |
Day-ahead demand forecast |
4037 |
megawatthours |
2025-08-15 18:00:00 |
US48 |
United States Lower 48 |
DF |
Day-ahead demand forecast |
621334 |
megawatthours |
2025-08-15 18:00:00 |
TVA |
Tennessee Valley Authority |
DF |
Day-ahead demand forecast |
28251 |
megawatthours |
2025-08-15 18:00:00 |
TPWR |
City of Tacoma, Department of Public Utilities, Light Division |
DF |
Day-ahead demand forecast |
477 |
megawatthours |
2025-08-15 18:00:00 |
TIDC |
Turlock Irrigation District |
DF |
Day-ahead demand forecast |
395 |
megawatthours |
2025-08-15 18:00:00 |
TEX |
Texas |
DF |
Day-ahead demand forecast |
78104 |
megawatthours |
2025-08-15 18:00:00 |
TEPC |
Tucson Electric Power |
DF |
Day-ahead demand forecast |
2062 |
megawatthours |
2025-08-15 18:00:00 |
TEN |
Tennessee |
DF |
Day-ahead demand forecast |
28251 |
megawatthours |
2025-08-15 18:00:00 |
TAL |
City of Tallahassee |
DF |
Day-ahead demand forecast |
498 |
megawatthours |
2025-08-15 18:00:00 |
SWPP |
Southwest Power Pool |
DF |
Day-ahead demand forecast |
52149 |
megawatthours |
2025-08-15 18:00:00 |
SW |
Southwest |
DF |
Day-ahead demand forecast |
17809 |
megawatthours |
2025-08-15 18:00:00 |
SRP |
Salt River Project Agricultural Improvement and Power District |
DF |
Day-ahead demand forecast |
5734 |
megawatthours |
2025-08-15 18:00:00 |
SEC |
Seminole Electric Cooperative |
DF |
Day-ahead demand forecast |
399 |
megawatthours |
2025-08-15 18:00:00 |
SCL |
Seattle City Light |
DF |
Day-ahead demand forecast |
1007 |
megawatthours |
2025-08-15 18:00:00 |
SCEG |
Dominion Energy South Carolina, Inc. |
DF |
Day-ahead demand forecast |
4255 |
megawatthours |
2025-08-15 18:00:00 |
SC |
South Carolina Public Service Authority |
DF |
Day-ahead demand forecast |
4382 |
megawatthours |
2025-08-15 18:00:00 |
PSEI |
Puget Sound Energy, Inc. |
DF |
Day-ahead demand forecast |
2143 |
megawatthours |
2025-08-15 18:00:00 |
PSCO |
Public Service Company of Colorado |
DF |
Day-ahead demand forecast |
5784 |
megawatthours |
2025-08-15 18:00:00 |
PNM |
Public Service Company of New Mexico |
DF |
Day-ahead demand forecast |
1762 |
megawatthours |
2025-08-15 18:00:00 |
PJM |
PJM Interconnection, LLC |
DF |
Day-ahead demand forecast |
137740 |
megawatthours |
2025-08-15 18:00:00 |
PGE |
Portland General Electric Company |
DF |
Day-ahead demand forecast |
2771 |
megawatthours |
2025-08-15 18:00:00 |
PACW |
PacifiCorp West |
DF |
Day-ahead demand forecast |
2545 |
megawatthours |
2025-08-15 18:00:00 |
PACE |
PacifiCorp East |
DF |
Day-ahead demand forecast |
7897 |
megawatthours |
2025-08-15 18:00:00 |
NYIS |
New York Independent System Operator |
DF |
Day-ahead demand forecast |
22870 |
megawatthours |
2025-08-15 18:00:00 |
NY |
New York |
DF |
Day-ahead demand forecast |
22870 |
megawatthours |
2025-08-15 18:00:00 |
NW |
Northwest |
DF |
Day-ahead demand forecast |
44688 |
megawatthours |
2025-08-15 18:00:00 |
NEVP |
Nevada Power Company |
DF |
Day-ahead demand forecast |
5516 |
megawatthours |
2025-08-15 18:00:00 |
NE |
New England |
DF |
Day-ahead demand forecast |
15130 |
megawatthours |
2025-08-15 18:00:00 |
MISO |
Midcontinent Independent System Operator, Inc. |
DF |
Day-ahead demand forecast |
105584 |
megawatthours |
2025-08-15 18:00:00 |
MIDW |
Midwest |
DF |
Day-ahead demand forecast |
115646 |
megawatthours |
2025-08-15 18:00:00 |
MIDA |
Mid-Atlantic |
DF |
Day-ahead demand forecast |
137740 |
megawatthours |
2025-08-15 18:00:00 |
LGEE |
LG&E and KU Services Company as agent for Louisville Gas and Electric Company and Kentucky Utilities Company |
DF |
Day-ahead demand forecast |
6119 |
megawatthours |
2025-08-15 18:00:00 |
LDWP |
Los Angeles Department of Water and Power |
DF |
Day-ahead demand forecast |
2856 |
megawatthours |
2025-08-15 18:00:00 |
JEA |
JEA |
DF |
Day-ahead demand forecast |
2470 |
megawatthours |
2025-08-15 18:00:00 |
ISNE |
ISO New England |
DF |
Day-ahead demand forecast |
15130 |
megawatthours |
2025-08-15 18:00:00 |
IPCO |
Idaho Power Company |
DF |
Day-ahead demand forecast |
2802 |
megawatthours |
2025-08-15 18:00:00 |
IID |
Imperial Irrigation District |
DF |
Day-ahead demand forecast |
630 |
megawatthours |
2025-08-15 18:00:00 |
HST |
City of Homestead |
DF |
Day-ahead demand forecast |
110 |
megawatthours |
2025-08-15 18:00:00 |
GVL |
Gainesville Regional Utilities |
DF |
Day-ahead demand forecast |
233 |
megawatthours |
2025-08-15 18:00:00 |
GVL |
Gainesville Regional Utilities |
D |
Demand |
411 |
megawatthours |
2025-08-15 18:00:00 |
GRID |
Gridforce Energy Management, LLC |
TI |
Total interchange |
2021 |
megawatthours |
2025-08-15 18:00:00 |
GRID |
Gridforce Energy Management, LLC |
NG |
Net generation |
2021 |
megawatthours |
2025-08-15 18:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
TI |
Total interchange |
91 |
megawatthours |
2025-08-15 18:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
NG |
Net generation |
975 |
megawatthours |
2025-08-15 18:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
DF |
Day-ahead demand forecast |
857 |
megawatthours |
2025-08-15 18:00:00 |
GCPD |
Public Utility District No. 2 of Grant County, Washington |
D |
Demand |
890 |
megawatthours |
2025-08-15 18:00:00 |
FPL |
Florida Power & Light Co. |
TI |
Total interchange |
328 |
megawatthours |
2025-08-15 18:00:00 |
FPL |
Florida Power & Light Co. |
NG |
Net generation |
27588 |
megawatthours |
2025-08-15 18:00:00 |
FPL |
Florida Power & Light Co. |
DF |
Day-ahead demand forecast |
27648 |
megawatthours |
2025-08-15 18:00:00 |
FPL |
Florida Power & Light Co. |
D |
Demand |
27260 |
megawatthours |
2025-08-15 18:00:00 |
FPC |
Duke Energy Florida, Inc. |
TI |
Total interchange |
-1794 |
megawatthours |
2025-08-15 18:00:00 |
FPC |
Duke Energy Florida, Inc. |
NG |
Net generation |
9434 |
megawatthours |
2025-08-15 18:00:00 |
FPC |
Duke Energy Florida, Inc. |
DF |
Day-ahead demand forecast |
8600 |
megawatthours |
2025-08-15 18:00:00 |
FPC |
Duke Energy Florida, Inc. |
D |
Demand |
11228 |
megawatthours |
2025-08-15 18:00:00 |
FMPP |
Florida Municipal Power Pool |
TI |
Total interchange |
-336 |
megawatthours |
2025-08-15 18:00:00 |
FMPP |
Florida Municipal Power Pool |
NG |
Net generation |
3302 |
megawatthours |
2025-08-15 18:00:00 |
FMPP |
Florida Municipal Power Pool |
D |
Demand |
3638 |
megawatthours |
2025-08-15 18:00:00 |
FLA |
Florida |
TI |
Total interchange |
-1131 |
megawatthours |
2025-08-15 18:00:00 |
FLA |
Florida |
NG |
Net generation |
49253 |
megawatthours |
2025-08-15 18:00:00 |
FLA |
Florida |
DF |
Day-ahead demand forecast |
39958 |
megawatthours |
2025-08-15 18:00:00 |
FLA |
Florida |
D |
Demand |
50394 |
megawatthours |
2025-08-15 18:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
TI |
Total interchange |
222 |
megawatthours |
2025-08-15 18:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
NG |
Net generation |
75988 |
megawatthours |
2025-08-15 18:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
DF |
Day-ahead demand forecast |
78104 |
megawatthours |
2025-08-15 18:00:00 |
ERCO |
Electric Reliability Council of Texas, Inc. |
D |
Demand |
75765 |
megawatthours |
2025-08-15 18:00:00 |
EPE |
El Paso Electric Company |
TI |
Total interchange |
-464 |
megawatthours |
2025-08-15 18:00:00 |
EPE |
El Paso Electric Company |
NG |
Net generation |
947 |
megawatthours |
2025-08-15 18:00:00 |
EPE |
El Paso Electric Company |
DF |
Day-ahead demand forecast |
1498 |
megawatthours |
2025-08-15 18:00:00 |
EPE |
El Paso Electric Company |
D |
Demand |
1410 |
megawatthours |
2025-08-15 18:00:00 |
DUK |
Duke Energy Carolinas |
TI |
Total interchange |
118 |
megawatthours |
2025-08-15 18:00:00 |
DUK |
Duke Energy Carolinas |
NG |
Net generation |
18950 |
megawatthours |
2025-08-15 18:00:00 |
DUK |
Duke Energy Carolinas |
DF |
Day-ahead demand forecast |
18288 |
megawatthours |
2025-08-15 18:00:00 |
DUK |
Duke Energy Carolinas |
D |
Demand |
18832 |
megawatthours |
2025-08-15 18:00:00 |
DOPD |
PUD No. 1 of Douglas County |
TI |
Total interchange |
74 |
megawatthours |
2025-08-15 18:00:00 |
DOPD |
PUD No. 1 of Douglas County |
NG |
Net generation |
345 |
megawatthours |
2025-08-15 18:00:00 |
DOPD |
PUD No. 1 of Douglas County |
DF |
Day-ahead demand forecast |
299 |
megawatthours |
2025-08-15 18:00:00 |
DOPD |
PUD No. 1 of Douglas County |
D |
Demand |
271 |
megawatthours |
2025-08-15 18:00:00 |
DEAA |
Arlington Valley, LLC |
TI |
Total interchange |
510 |
megawatthours |
2025-08-15 18:00:00 |
DEAA |
Arlington Valley, LLC |
NG |
Net generation |
510 |
megawatthours |
2025-08-15 18:00:00 |
CPLW |
Duke Energy Progress West |
TI |
Total interchange |
-19 |
megawatthours |
2025-08-15 18:00:00 |
CPLW |
Duke Energy Progress West |
NG |
Net generation |
693 |
megawatthours |
2025-08-15 18:00:00 |
CPLW |
Duke Energy Progress West |
DF |
Day-ahead demand forecast |
689 |
megawatthours |
2025-08-15 18:00:00 |
CPLW |
Duke Energy Progress West |
D |
Demand |
712 |
megawatthours |
2025-08-15 18:00:00 |
CPLE |
Duke Energy Progress East |
TI |
Total interchange |
-179 |
megawatthours |
2025-08-15 18:00:00 |
CPLE |
Duke Energy Progress East |
NG |
Net generation |
10203 |
megawatthours |
2025-08-15 18:00:00 |
CPLE |
Duke Energy Progress East |
DF |
Day-ahead demand forecast |
10479 |
megawatthours |
2025-08-15 18:00:00 |
CPLE |
Duke Energy Progress East |
D |
Demand |
10382 |
megawatthours |